Part 192 Subparts J & K. Testing & Uprating

Similar documents
Subpart E. Pressure Testing

Pressures MAOP MOP OP

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

BSR GPTC Z TR GM References and Reporting Page 1 of 8

SECTION PRESSURE TESTING OF PIPING

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

HYDROSTATIC LEAK TEST PROCEDURE

49 CFR 195 Transportation of Hazardous Liquids by Pipeline THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS

2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION. Steven Giambrone Director of Pipeline Safety

O&M MANUAL HIGHLIGHTS

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

PIP PNE00012 Piping Examination and Leak Test Guide

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

2017 LGA 191/192 & 195 Pipeline Safety Conference

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Notice for Pressure Special Equipment Manufacture Licensing

Operation & Maintenance Manual

49 CFR 195 Regulatory Overview

Anomaly Evaluation, Response, and Repair Summit. Presentation by INGAA June 3, 2008

MSC Guidelines for Refrigeration Machinery

Standard Pneumatic Test Procedure Requirements for Piping Systems

PRESSURE TESTING AND RECORDKEEPING: RECONCILING HISTORIC PIPELINE PRACTICES WITH NEW REQUIREMENTS

PIPELINE SAFETY REGULATIONS

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

PE 2708 CTS & IPS GAS PIPE

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

September 2018 Pressure Test

Subj: PIPELINE AND HOSE TESTING GUIDANCE FOR MARINE TRANSPORTATION RELATED FACILITIES HANDLING OIL OR HAZARDOUS MATERIAL IN BULK

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

Hydrostatic Testing as an Integrity Management Tool

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

ONSHORE GAS GATHERING FAQS

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TENTH REVISION)

Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method

Hydrostatic Testing of In-Situ Pipelines & Spike Testing. Colin Silla, PE, PMP Southeast District Manager 6/27/18

DOT-SP 8391 (FIFTHTEENTH REVISION) EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

STANDARD INSPECTION REPORT OF A GAS DISTRIBUTION OPERATOR

TOTAL CAPABILITIES IN THE PIPELINE INDUSTRY. UTILITY TECHNOLOGIES INTERNATIONAL CORPORATION Cincinnati Columbus West Jefferson

Temporary Connections to Process. Supersedes: 10/31/09 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Hose Management Inspection Guidelines for HP Drilling and Production Hoses

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (ELEVENTH REVISION)

EXPIRATION DATE: January 31, 2015

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

CONFINED SPACE AWARENESS

Compressed Gas Cylinders - Guideline

GAS DELIVERY PRESSURE AND MEASUREMENT

LASCO Schedule 40 PVC Fittings

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

OCTOBER 2017 ISSUE Page 1 of 7

EXPIRATION DATE: October 31, 2018 (FOR RENEWAL, SEE 49 CFR )

BEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C.

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

SECTION BUTTERFLY VALVES

Kiefner & Associates, Inc.

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

CLEANING, INSPECTION, AND TESTING OF SEWERS

Model 141-A Regulators

Limited quantities of compressed gases.

THE PROCESS OF JOINT INTEGRITY

ARKANSAS PUBLIC SERVICE COMMISSION

Your safety and the safety of others are very important.

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

Automatically or individually calculated.

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Ductile iron gate valve PN16. BS EN 1171:2002 PN16

Lab Cock. Contents. User s Manual (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

BEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C.

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

CB7 Bayonets Male & Female 1/4", 3/8, & 1/2 Size

Installation, operation & maintenance manual - original version

MANUFACTURING PROCEDURE SPECIFICATION INSPECTION TEST PLAN

The purpose of this task is to prevent damage from occurring to the pipe or it s coating when backfilling an exposed pipeline.

DOT-SP 9791 (SIXTEENTH REVISION) EXPIRATION DATE: December 31, 2018 (FOR RENEWAL, SEE 49 CFR )

Telefon (+45) Telefax (+45)

SIX R (P ) AND SEVEN R (P ) POSITION CYLINDERS Service Information

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP 7218 (NINETEENTH REVISION)

AVK SERIES 601, 602, 603 & 605 UNIVERSAL COUPLINGS, ADAPTORS & END CAPS INSTALLATION, OPERATION & MAINTENANCE MANUAL

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

1213B2 Service Regulators Maximum Inlet Pressure 125 PSIG

Pressure Regulators. Operating Instructions. Instrumentation

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

UKOPA Dent Management Strategy

VALVE MANUFACTURERS ASSOCIATION API 622 API 624

Liquefied gas cargo tanks and process pressure vessels

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING

Disposal/Injection Well Pressure Test Report (H-5)

BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS

Compact Ball Valves ASAHI AV VALVES. Contents. User s Manual. (Page) (1) Be sure to read the following warranty clauses of our product 1

Transcription:

Part 192 Subparts J & K Testing & Uprating

MAOP, Testing, & Uprating Are All Linked MAOP = Maximum Pressure Allowed By Regulations (192.619 et seq.) MAOP Determined By Operator for Each Pipeline or Segment

MAOP For Pipelines Before 1970 System Design Test Pressure Operating History (MOP) Subject to Class Location Change

MAOP For Pipelines After 1970 System Design Test Pressure Subject to Class Location Change

Part 192 Subpart J Test Requirements

192.501 ~ Scope Non- Retroactive Minimum Test Requirements Strength-Tests (Transmission) Leak-Tests (Distribution)

192.503 ~ General Test all Lines (New, Replacements, Relocations) Meet Requirements of Subpart J and 192.619 (Steel P/L 100 psig) to Establish/Substantiate MAOP

192.503 ~ General Test Medium = Liquid (Water) Inert Gas Natural Gas Compatible with P/L Material Nonflammable (Except Natural Gas)

192.503 ~ General Maximum Hoop Stress Allowed as Percentage of SMYS Class Location Natural Gas Air or Inert Gas 1 80 80 2 30 75 3 30 50 4 30 40

192.503 ~ General Tie-In Joints Exempt from Pressure Testing NDT Tie-In Welds ( 20 % SMYS) Leak Test Non-Welded Joints

192.505 ~ Strength Test Requirements Steel Pipelines Operating at Hoop Stress 30% SMYS

192.505 ~ Strength Test Requirements Paragraph (a) Test per 192.619 (a)(2)(ii) to Establish/Substantiate MAOP Class location Installed before (Nov. 12, 1970) Factors 1, segment Installed after (Nov. 11, 1970) Covered under 192.14 1 1.1 1.1 1.25 2 1.25 1.25 1.25 3 1.4 1.5 1.5 4 1.4 1.5 1.5

192.505 ~ Strength Test Requirements Paragraph (a) Additional Requirements in Class 1 or 2 ----if---- Residence(s) Within 300 feet of Pipeline

192.505 ~ Strength Test Requirements Paragraph (b) Stations (Compressor/Regulator/Measuring) in Class 1 or 2 Locations ---- must be ---- Tested to Class 3 Location Requirements (150% MAOP of Station)

192.505 ~ Strength Test Requirements Paragraphs (c) & (e) Maintain Test Pressure for at least 8 Hours ---- except ---- 4 - Hour Minimum for Fab Units & Short Sections of Pipe Impractical to Test After Installation

192.505 ~ Strength Test Requirements Paragraph (d) Individual Components Don t Require Post-Installation Test ---- if ---- Pre-Tested or QC ed by Manufacturer

192.507 ~ Test Requirements 100 psig Pipeline MAOP < 30% SMYS Except for Service Lines & Plastic Pipelines Strength and Leak Test

192.507 ~ Test Requirements (Steel Lines 100 psig) Test per 192.619 (a)(2)(ii) to Establish/Substantiate MAOP Class location Installed before (Nov. 12, 1970) Factors 1, segment Installed after (Nov. 11, 1970) Covered under 192.14 1 1.1 1.1 1.25 2 1.25 1.25 1.25 3 1.4 1.5 1.5 4 1.4 1.5 1.5

192.507 ~ Test Requirements Paragraph (a) Test Procedure That Will Ensure Discovery of Potentially Hazardous Leaks

192.507 ~ Test Requirements Paragraph (b) Additional Requirements if 20% SMYS & Air, Inert Gas, or Natural Gas as Test Medium: 1. Conduct Leak Test at Pressure Between 100 psig and 20% SMYS; or 2. Walk Line for Leaks While Holding Pressure at @ 20% SMYS

192.507 ~ Test Requirements Paragraph (c) Maintain at or above Test Pressure for Minimum of One Hour

192.509 ~ Test Requirements Pipeline MAOP < 100 psig Except for Service Lines & Plastic Pipelines Leak Test

192.509 ~ Test Requirements Paragraph (a) Test Procedure That Will Ensure Discovery of Potentially Hazardous Leaks

192.509 ~ Test Requirements Paragraph (b) 1. Mains to Operate < 1 psig, Test to 10 psig 2. Mains to Operate 1 psig, Test to 90 psig No Time Requirement Specified

192.511 ~ Test Requirements Service Lines (Other Than Plastic) Paragraph (a) 1. Leak Test Prior to Placing in Service 2. If Feasible, Include Connection to Main 3. If Not Feasible, Test Connection to Main In-Service at Operating Pressure

192.511 ~ Test Requirements Service Lines (Other Than Plastic) Paragraphs (b) & (c) 1. Service Lines > 1 psig and 40 psig, Leak Test to Minimum of 50 psig 2. Service Lines > 40 psig, Leak Test to Minimum of 90 psig 3. If Steel Service Line 20% SMYS, Test per 192.507

192.513 ~ Test Requirements Plastic Pipelines Paragraphs (a) and (b) 1. All Plastic Lines (Transmission, Mains, Services) 2. Use Test Procedure That Will Ensure Discovery of Potentially Hazardous Leaks

192.513 ~ Test Requirements Plastic Pipelines Paragraphs (c) and (d) 1. Test Pressure = Higher of 150% MAOP or 50 psig, Not to Exceed 3 X Design Pressure ( 192.121) 2. During Test, Temp. of Plastic Cannot Exceed Higher of 100 F. or Temp. Used to Determine HDB

192.515 ~ Environmental & Safety Requirements 1. Measures to Protect Employees & General Public. 2. Limit Access to Test Area While Above 50% SMYS. 3. Dispose of Test Medium in Environmentally-Safe Manner.

192.517 ~ Records Required for Tests per 192.505 & 192.507 Retain for Life of Pipeline or Segment Specific Information Required

192.517 ~ Records Name of Operator/ Employee/Test Company Test Medium Test Pressure Test Duration Charts, Other Pressure Records Elevation Profiles Leaks, Failures & Disposition

192.517 ~ Records Required for Tests per 192.509, 511,& 513 Retain for Minimum of 5 Years Per Amendment 93

192.725 ~ Test Requirements for Reinstating Service Lines 1. Retroactive Applies to All Service Lines. 2. Disconnected Service Lines Must be Tested in Same Manner as New Service Lines. 3. Test from Point of Disconnection to Service Line Valve (Unless Service to Customer Maintained).

Part 192 Subpart K Uprating

What Is Uprating? Increasing MAOP For Existing Pipelines While Maintaining Service

Why Uprating? To Assist Operators With P/L Segments Caught By 5-year MOP Between 1965-1970

Uprating Code Sections 192.553 ~ General Requirements. 192.555 ~ P/L's 30% SMYS 192.557 ~ P/L's < 30% SMYS, Non-Steel Materials

192.553 General Requirements Controlled Pressure Increases Leak Checks After Increases Repair or Monitor Leaks Found Records for Life of Segment Written Uprating Plan/Procedure Limitation on Increase in MAOP

192.555 Uprating to a Pressure 30% SMYS, Steel Pipelines

192.555(b) ~ Before Uprating Review Design, O&M, Prior Testing Make Repairs, Replacements, Alterations As Required

192.555(c) ~ P/L's Before 9/12/70 Establish MAOP per 192.619 Test Pressure = Highest Pressure (previous test or operation)

192.555(d) ~ (c) Doesn't Work? Retest as New Line in Same Location Class 1, No Prior Test, Can't Test New MAOP 57.6 % SMYS (0.8 X 72%) New MAOP ~ Design/Condition

192.555(e) ~ Pressure Increments To Increase Pressure per (c) or (d)(2), Fewer Of -- 1) 10% of Pressure Before Uprating or 2) 25% of Total Pressure Increase

192.557 Uprating to a Pressure < 30% SMYS (Steel Pipelines); Other Non-Steel Materials

192.557(b) ~ Before Uprating Review Design, O&M Perform Leakage Survey (if > One Year Since Last Survey) Repair or Monitor Leaks Make Repairs, Replacements, Alterations

192.557(b) ~ Before Uprating Reinforce/Anchor Exposed Offsets, Bends, Dead Ends Isolate From Lower Pressure Segments Install Service Regulators (Low-Pressure Distribution Systems)

192.557(c) ~ Pressure Increments To Increase Pressure, Fewer Of -- 1) 10 psig increments 2) 25% of Total Pressure Increase 3) At Least 2 Increments for Low-Pressure Distribution

192.557(d) Additional Requirements for Cast Iron / Ductile Iron Segments

Uprating ~ Major Concerns What test pressure needed for new MAOP? Design not retroactive, Uprating is Less stringent requirements for old vs. new Some design/construction defects may not be apparent Uprating requirements confusing, difficult to read