Mechanical Integrity Assessment Training

Similar documents
MIA Training Example (Catalano 2H)

MIA Training Example (Beattie No. 99)

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

Disposal/Injection Well Pressure Test Report (H-5)

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

On-Off Connector Skirt

Casing and Cementing Requirements

Colorado Oil and Gas Conservation Commission

Casing Design. Casing Design. By Dr. Khaled El-shreef

Form 21 Mechanical Integrity Test

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Float Equipment TYPE 925/926

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

IWCF Equipment Sample Questions (Surface Stack)

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Practice Exam IADC WellSharp Driller and Supervisor

Texas Administrative Code

W I L D W E L L C O N T R O L FLUIDS

Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells

Downhole Gas Separation Performance

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

August 21, Deepwater MPD / PMCD

Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks. Alan Brodie Feb 2011 For more info visit

GolfNow Central. Rates & Inventory User Guide. February 2018

OPERATING PROCEDURES

VortexFlow DX (Downhole) Tool Installation Instructions

OCEAN DRILLING PROGRAM

Contact Information. Progressive Optimization Service. We Provide: Street Bay #2. Grande Prairie, AB T8V - 4Z2

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Recommended minimum functional specifications and standards for geothermal wells in the Netherlands v.5

OIL AND GAS PROCESSES AND EMISSIONS

Why Do Not Disturb Is a Safety Message for Well Integrity

Presents the following instructional slide show:

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

Chapter 5 Drilling and Well Testing Practices

MB-SP Series Solvent Purification System

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Deepwater Horizon Incident Internal Investigation

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Characterization of Completion Operational Safety for Deepwater Wells

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Inventory User Guide

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

Abandonment Program for Paramount Fort Liard F 36

Understanding pressure and pressure

Study Guide IADC WellSharp Driller and Supervisor

System Pressure Manager Standard & System Pressure Manager Plus

TARPON A Minimal Facilities Platform

Oil Production with BPZ System A NEW APPROACH!

Restoring Fluid Flow in Tubing Strings

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

BLACK HILLS PLATEAU PRODUCTION COMPANY

Inflatable Packers for Grouting 11/10/00

The report gives a summary of the background and motivation for the audit activity and summarizes the observations made at the meetings.

1. The well has been shut in on a kick and the kill operation has not started.

TECHNICAL DATA CAUTION

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

VW Liquid Settlement System VWLSS-200

Installation and Service Manual

TECHNICAL DATA Q= C. Table 1 - Specifications

STIPumpCard. User Manual

Hydro-Mech Bridge Plug

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

ENDEAVOR ENERGY RESOURCES

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

HPHT Annular Casing Packer. Obex Annular Casing Packer

Model A Sleeve Valve Cement Retainer

APPENDIX A1 - Drilling and completion work programme

BLADDER TANK PROPORTIONING SYSTEM PRE-PIPED

SITE INSPECTION PROCEDURE FORM

API 682 Mechanical Seals. Swagelok Eastern Australia & New Zealand

HOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Dewatering Landfill Gas Wells to Maximize LFG Collection

PETITION OF SHELL OIL COMPANY TO MAKE PERMANENT THE PRESENT SPECIAL FIELD RULES FOR THE SOUTHWEST PINEY

Acoustic Troubleshooting of Coal Bed Methane Wells

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES. Lamar Jones. Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

Transcription:

Mechanical Integrity Assessment Training Pennsylvania Independent Oil and Gas Association November 14, 2013 PADEP: Bureau of Oil and Gas Planning and Program Management Division of Well Plugging and Subsurface Activities Gene Pine, P.G. Seth Pelepko, P.G. Harry Wise, P.G. Stew Beattie

Presentation Outline Introduction to MIA Program Overview and History Module 1: Review of Form A Instructions Definitions Guidance/Best Practices Significant Updates Naming Conventions for Annular Spaces Module 2: Form A Form A Overview Form A Use with Examples Form A 2-Year Example and Data Transfers Module 3: Form B Form B Overview Form B Use with Examples Form B Data Transfers

Form A Overview Only compatible with Microsoft Excel versions 2007 or later Color Coding of Cells: YELLOW-SHADED boxes MUST BE COMPLETED BLUE-SHADED boxes are OPTIONAL INSPECTION COMPONENTS or used to ACTIVATE OTHER FUNCTIONS WHITE-SHADED boxes are AUTO- POPULATED HATCHED boxes are NOT RELEVANT FOR THE WELL BEING EVALUATED Allows up to 250 wells to be monitored for four consecutive quarters

Form A Overview Well construction details only need to be entered ONCE; information is retained when creating templates for subsequent years

Form A Overview If conditions at the well remain unchanged between quarters, or are mostly static, data can be automatically transferred to the most recent quarter and manual edits made as needed

Form A Overview If well is set up incorrectly, the RESET SECTION feature allows the user to set up the well a second time WARNING: THIS FEATURE WILL DELETE ALL INFORMATION ENTERED FOR THE WELL!

Form A Overview Duplicate API numbers are automatically flagged in Form A and should be corrected

Form A Overview When all quarterly inspection data have been entered for the year and any duplicate API numbers are corrected, a data summary sheet should be created for submittal to DEP

Form A Overview To create a template for receiving the following year s inspection data, answer question 26. Y and select button 27.

Form A Use with Examples LENCER NO. 10: Oil well equipped only with freshwater casing Oil is produced through rod and tubing assembly and surface casing is vented to the atmosphere, but not readily accessible using an echo meter or fluidlevel monitoring equipment

Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 14: Primary Production Annulus S/C : Shut-in (pressure) or Venting (flow rate) Section 13: Water Level or Average Daily Pumping Time or Produced Water Quality in the Field or Average Daily Pumping Time/Volume OIL

Form A Use with Examples WELSH NO. 3: 2-String combo well Oil is produced through rod and tubing assembly and annular gas is produced inside of the surface casing and outside of the production string Open-hole completion and production string is set on a packer

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 13: Annular Production Gas Pressure (measured outside production casing and inside surface casing P ) GAS OIL

Form A Use with Examples CATALANO 2H: 4-String gas well in coal area Gas is produced through tubing assembly and coal protective casing is shallower than surface casing Cased-hole completion and production string is anchored with cement below intermediate casing shoe

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 13: Primary Production Gas Pressure (measured inside primary production casing) Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 14: Primary Production Annulus P (intermediate x production) Shut-in (pressure) or Venting (Flow Rate) COAL GAS

Form A Use with Examples SWANK 4H: 3-String gas well with annular production Primary production is through tubing assembly and annular gas is produced inside of intermediate casing Cased-hole completion and production string is anchored with cement below intermediate casing shoe

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 13: Primary Production Gas Pressure (measured inside primary production casing) Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 13: Annular Production Gas Pressure (measured outside production casing and inside intermediate casing P ) GAS GAS

Form A Use with Examples COSTELLO NO. 1: Combo well equipped only with freshwater casing Oil is produced through rod and tubing assembly and gas is produced outside tubing and inside surface casing Fluid levels readily accessible using echo meter

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 13: Primary Production Gas Pressure (measured inside primary production casing) Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 14: Primary Production Annulus S/C : Shut-in (pressure) or Venting (flow rate) Section 13: Water Level or Average Daily Pumping Time/Volume or Produced Water Quality Using Field Meter GAS OIL

Form A Use with Examples JANKURA 7H: 3-string oil well Cased-hole completion with oil produced using rod and tubing assembly Production annulus is under the wellhead All other casing strings cut off and cellar filled with gravel

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 14: Primary Production Annulus P (intermediate x production) Shut-in (pressure) or Venting (Flow Rate) Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection OIL

Form A Use with Examples RITZER 5H: 3-String gas well with primary production through tubing assembly and annular gas is produced inside of intermediate casing Cased-hole completion and production string is anchored with cement below intermediate casing shoe Production annulus is under the wellhead All other casing strings cut off and cellar filled with gravel

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 13: Primary Production Gas Pressure (measured inside primary production casing) Section 14: Primary Production Annulus P (intermediate x production) Shut-in (pressure) or Venting (Flow Rate) GAS

Form A Use with Examples Beattie No. 99: Turn-of-the-20 th century gas well with no well record available Only production casing accessible above grade; any other casing, if present outside wellhead and buried below grade

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 13: Primary Production Gas Pressure (measured inside primary production casing) Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection GAS

DID I MENTION? SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS

Form A Two-Year Example and Data Transfers Operator A has two wells in their inventory The first well, the Welsh No. 3, has been in production for several years The second well, the Swank 4H, was brought on-line during the third quarter of 2013

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 13: Annular Production Gas Pressure (measured outside production casing and inside surface casing P ) GAS OIL

Sections 15, 16, and 17: Inspect for surface discharges/annular flows of gas, liquid hydrocarbons, or non-freshwater Section 13: Primary Production Gas Pressure (measured inside primary production casing) Sections 18 and 19: Confirm safe venting (if escaping gas is noted) and complete corrosion inspection Section 13: Annular Production Gas Pressure (measured outside production casing and inside intermediate casing P ) GAS GAS

Form A Two-Year Example and Data Transfers Now that the well integrity data are entered, Operator A would like to create a data summary sheet, create a template for next year, and enter the quarterly data for the first quarter of 2014

Form A Two-Year Example and Data Transfers Creating a data summary sheet and a report template for next year can be done in 4 easy steps 1 2 3 4

Form A Two-Year Example and Data Transfers Begin next year s inspections

Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from the previous inspection year to first quarter of the current inspection year 1

Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from the previous inspection year to first quarter of the current inspection year 2

Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from the previous inspection year to first quarter of the current inspection year 3

Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from the previous inspection year to first quarter of the current inspection year 4

Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from the previous inspection year to first quarter of the current inspection year 5

Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from the previous inspection year to first quarter of the current inspection year 6

Thank You Questions? Seth Pelepko, P.G., Section Chief Subsurface Activities Section 717.772.2199 (mipelepko@pa.gov)