Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Similar documents
2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

MONTGOMERY COUNTY COUNCIL MEMORANDUM

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Hospital Link Project Project Update September 2017

Borough of Danville, PA Traffic Calming Program Guidelines

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Public Information Centre

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

PROJECT FACT SHEET March 21, 2018

PROJECT FACT SHEET May 25, 2018

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

WELCOME Public Information Centre

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Welcome and Purpose of Meeting

Malvern Borough Local Traffic Calming

VILLAGE OF NILES TRAFFIC CALMING POLICY

5 Transit & Traffic. Overview

Glebe Neighbourhood Cycling Plan

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Legislative Update Williamsburg Residency

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

Duwamish Way-finding and CTR Report

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

URBANA TRAFFIC COMMISSION Tuesday, November 12, 2013

What are the Qualities that make Newark a Bicycle Friendly Community? What are aspects that make Newark less Bicycle Friendly?

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Dowling/Beaty Cycling Route

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

SAFE ROUTES TO SCHOOL (SR2S)

CITY OF PORTSMOUTH PLANNING DEPARTMENT

122 Avenue: 107 Street to Fort Road

Cincinnati Dayton Rd Widening

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Edenbrook Hill Drive Traffic Calming Study

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Hidden Oaks Elementary School

SRTS IMPLEMENTATION COSTS

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Tonight is for you. Learn everything you can. Share all your ideas.

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

bcc: Al Roshdieh, Deputy Director, MCDOT cc: Edgar Gonzalez, Deputy Director, MCDOT cc: Gary Erenrich, Special Assistant to the Director, MCDOT cc:

North Avenue Corridor Study

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Why invest in the 1 Street S.W. Corridor?

AGENDA ITEM G-2 Public Works

Meadow Woods Elementary School

Hospital Link Project Project Update November 2017

Bicycle Facilities Planning

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Traffic Calming Review. Max Becker Drive. Thursday, November 30, 2017 Presentation at 7:00 p.m. WT Townshend Public School

Water Street Promenade Engineering and Design Services

S A F E R O U T E S T O S C H O O L H E R M A N TOW N S C H O O L S A N D P R O C TO R S C H O O L S P L A N A P P R OVA L S

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Monterey Road Complete Streets

This page intentionally left blank.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Improve the livability of our streets by

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019

Giles Run Connector Road

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Chapter 5. Complete Streets and Walkable Communities.

Implementing the Three Es of School Zone Traffic Calming

Tunnel Reconstruction South 5 th Street Association October 16, 2018

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Traffic Signal Phasing Study Summary & Staff Recommendations

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Item No. 14 Town of Atherton

Clay Street Bridge Replacement Project

Appendix C 3. Bicycle / Pedestrian Planning

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING

Bicyclist Signing Guidelines

Durrance Elementary School

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

POLICY: TRAFFIC CALMING

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Safe Streets. City of Lake Forest Park. March 21, 2017

Community Transportation Plan

Safe Routes to School Action Plan Aberdeen, Idaho

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Transcription:

Agenda Item # 4 Work Session Meeting Date September 8, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne R. Ludlow City Manager Discussion Item Background Temporary Neighborhood Traffic Calming Measures to Address the Carroll Avenue Bridge Closure Detours At the June 2, 2014, Council work session, the Council agreed to coordinate meetings with residents on streets potentially affected by traffic generated by the temporary closure of the Carroll Avenue bridge. City staff scheduled 10 such meetings. Additionally several neighborhoods organized their own meetings and provided their comments, as did the Safe Roadways Committee. The requests received from those meetings and groups were summarized and presented to the Council at the March 2, 2015 Council meeting. Additionally, the Council discussed whether to establish a simplified procedure for authorizing temporary traffic calming measures for streets impacted by the bridge closure. Council asked staff to develop an overall plan identifying the recommended traffic calming measures for City installation and confirm what measures will be addressed by State Highway Administration or their contractor. State Highway Administration has awarded the construction contract to Kiewit Infrastructure Group. SHA has scheduled a community meeting on September 24, from 6 pm to 8 pm at the Takoma Park Volunteer Fire Department building on Carroll Avenue to provide an opportunity for interested residents to ask questions and review display maps and plans. The first phase of construction is currently underway and involves utility relocations, construction of the temporary pedestrian bridge and installation of temporary traffic signals and signage. During this work, single lane closures will occur sporadically on Carroll Avenue and Sligo Creek Parkway between 9 am and 3 pm weekdays. The first phase is expected to last 6 to 9 months. The second phase, which will result in the closure of the bridge and implementation of the detour routes, will take place once the initial phase is completed and is expected to last 12 months. City staff have arranged for traffic volume counts to be gathered on 10 streets segments adjacent to the project area to establish a base line of traffic volume prior to the bridge closure. This data will be gathered in mid-september. The attached spreadsheet presents the staff recommendations for traffic control measures to be implemented by the City. It includes the list of traffic control measures to be implemented by SHA or their contractor. Policy Streets in the City should be safe for motorists, pedestrians, and cyclists.

Fiscal Impact Estimated cost to the City for implementation of the measures listed in the staff recommendation is $45,000. The largest portion of the cost (about $30,000) is for the new sidewalk on Sligo Creek Parkway. Budgeted funds are available for these costs. Attachments 1. Original list of traffic calming requests received with notes 2. Staff recommended temporary traffic calming measures Recommendation Council to review list of recommended measures, make any changes or additions and authorize implementation. Special Consideration

DETOUR MAP CARROLL AVENUE BRIDGE PROJECT Maplewood Avenue Flower Avenue Maple Avenue Carroll Avenue Sligo Creek Pkwy Old Carroll Avenue PROPOSED DETOUR Signed Detour route Sligo Creek Parkway to remain open on Sundays from Old Carroll Avenue to Maple Avenue during construction Temporary 3 Way Stop

RECOMMENDED TRAFFIC CALMING MEASURES IMPLEMENTING CROSSWALKS/PEDESTRIAN CROSSING SIGNS AGENCY ADD'L COMMENTS Carroll Avenue crosswalks at Boyd & Lincoln SHA District 3 office agreed to install crosswalk at Boyd, though it is not part of this project, District 3 office evaluating at Lincoln Flower Avenue pedestrian crossing signs at Maple and Maplewood Maple Avenue crosswalk markings at Grant, Lee, Sherman, Ritchie, Lincoln to be refurbished * Received Safe Routes To School grant for this project, working through approvals to implement prior to bridge closure Maple Avenue pedestrian crossing signs at intersections along detour route Old Carroll Avenue crosswalk across Old Carroll at Carroll Avenue (to be installed by SHA contractor) SHA Agreed to by SHA, will be installed as part of project NEW SIDEWALK Sligo Creek Parkway sidewalk between Old Carroll and Jackson MNCPPC, Agreed to by MNCPPC - they are completing design, to be installed by City contractor at City's expense ONE WAY / NO ENTRY / TURN RESTRICTIONS Jefferson Avenue no entry at Carroll & Jefferson PARKING RESTRICTION Maplewood Avenue extend no parking area (north side) to enable bus turns from Flower Ave Maplewood Avenue no parking on college side (odd side) Old Carroll Avenue no parking on both sides of street SIGNAGE / PAINTING Carroll Avenue advance variable message boards on either side of approach to bridge SHA Carroll Avenue detour ahead signs starting at 1,500 feet prior to bridge (before Garland Ave) SHA Edinburgh Lane Install signage - No access to SCP at Maple Edinburgh intersection Flower Avenue detour ahead signs north bound at Jackson Flower Avenue detour ahead signs southbound at Houston Maplewood Avenue paint center line Sligo Creek Parkway stop ahead & detour ahead signs north bound and south bound MNCPPC, SHA TRAFFIC SIGNAL ISSUES Takoma Junction Improve signal timing SHA OTHER MEASURES Authority Monitor traffic for 3 days on each impacted street prior to closure to establish pre-construction baseline To be completed in mid-september by City contractor Encourage "kind driving" through Newsletter articles and social media Require contractors staff to park within construction zone, not on residential streets SHA Contractor is required to observe all local parking regulations, sufficient room for parking within construction zone. Actively advertise Ride Share resources Paint all crosswalks and stop bars in area prior to bridge work Snow removal for detour routes needs to be high priority SHA, MNCPPC,

ORIGINAL TRAFFIC CALMING REQUESTS Responsible Notes CROSSWALKS/PEDESTRIAN CROSSING SIGNS Authority Carroll Avenue crossing guard at Lincoln Police will review Carroll Avenue crosswalks at Boyd, Lincoln, Old Carroll & Flower SHA District 3 office evaluating at Lincoln, agreed to crosswalk at Boyd Central Avenue raised crosswalk mid block between Garland and Jackson mid block crosswalks not recommended Flower Avenue pedestrian crossing signs at Maple and Maplewood included in staff recommendations Lincoln Avenue pedestrian crossing signs at Lincoln and Jefferson Maple Avenue high quality crosswalk markings at Grant, Lee, Sherman, Ritchie, Lincoln included in staff recommendations Maple Avenue crossing guards at Lincoln, Ritchie, Sherman Police will review Maple Avenue pedestrian crossing signs at intresections along detour route included in staff recommendations Maple Avenue raised crosswalk at Sligo Creek Parkway path Old Carroll Avenue crosswalk needed at Carroll Avenue SHA, SHA agrees and included in project Sligo Creek Parkway raised crosswalks at access points to SCP trail MNCPPC MNCPPC does not support raised crosswalks at these locations' NEW SIDEWALK Maplewood Avenue sidewalk on college/odd side - exists on home side Sligo Creek Parkway sidewalk between Old Carroll and Jackson MNCPPC, MNCPPC agreed and is developing design ONE WAY / NO ENTRY / TURN RESTRICTIONS Carroll Avenue remove left turn signal at Flower southbound/no left turns onto Flower SHA SHA will install No Detour Local traffic sign at this intersection Edinburgh Lane make one way Erie Avenue make one way toward Flower/ or make one way toward Maple Erie Avenue no entrance at Flower Ethan Allen Avenue no right turn on Elm for westbound drivers SHA/ Grant Avenue restrict turning onto Grant in AM from Carroll Jackson Avenue turn restriction in effect all day at Ethan Allen Jefferson Avenue no entry at Carroll & Jefferson included in staff recommendation Maplewood Avenue make one way toward Flower Sherman Avenue make one way Sligo Park Hills Neighborhood remove existing turn restrictions Mo Co Montgomery County does not support removing restrictions PARKING RESTRICTION Grant Avenue extend no parking area further from Maple Ave Maplewood Avenue extend no parking area (north side) to enable bus turns from Flower Ave included in staff recommendation Maple Avenue no parking in front of Community Center in AM Maple Avenue move bus stop near Grant further from intersection (toward Lee) Maplewood Avenue no parking on college side (odd side) included in staff recommendation Old Carroll Avenue no parking on street included in staff recommendation PERMIT PARKING Jefferson Avenue permit parking during construction Old Carroll Avenue permit parking during construction Sherman Avenue permit parking during construction SPEED CAMERA Lincoln Avenue portable speed camera during school bus times Maplewood Avenue speed camera SPEED BUMPS/HUMP Garland Avenue 3 speed humps Jefferson Avenue speed bump

Lincoln Avenue speed bumps Maplewood Avenue speed bumps Old Carroll Avenue speed bump(s) SIGNAGE / PAINTING All streets leading to bridge advanced variable message boards SHA, SHA agreed to two VMB at eitehr end of bridge Carroll Avenue detour ahead signs southbound from University to Garland SHA SHA will be installing signs just north of Garland Ave Edinburgh Lane signage - No access to SCP at Maple included in staff recommendation Flower Avenue detour ahead signs north bound from Jackson to Chaney included in staff recommendation Flower Avenue detour ahead signs southbound from Houston to Erie included in staff recommendation Maplewood Avenue paint center line included in staff recommendation Sligo Creek Parkway stop ahead & detour ahead signs north bound from Aspen to Jackson MNCPPC included in staff recommendation Sligo Creek Parkway stop ahead signs south bound from Maple to Old Carroll MNCPPC, SHA SHA has included stop ahead signs in the project STOP SIGNS Carroll Avenue stop sign at Old Carroll SHA Does not meet MUTCD standards for stop sign Carroll Avenue stop sign at Lincoln SHA Does not meet MUTCD standards for stop sign Flower Avenue 2 way stop sign at Chaney SHA Outside of detour area Flower Avenue stop sign at Child Care Center 7213-7214 Flower Do not support mid block stop sign Flower Avenue stop signs proposed in green street design - Domer, Wabash, Kennebec Does not meet MUTCD standards for stop sign Garland Avenue 3 way stop at Minter Place Does not meet MUTCD standards for stop sign Lincoln Avenue 3 way stop at Lincoln and Jefferson Does not meet MUTCD standards for stop sign Maple Avenue 4 way stop sign at Grant Does not meet MUTCD standards for stop sign Maple Avenue 4 way stop at Lee Does not meet MUTCD standards for stop sign Maple Avenue 4 way stop sign at Maplewood Does not meet MUTCD standards for stop sign Sligo Creek Parkway 4 way stop sign at Jackson MNCPPC Does not meet MUTCD standards for stop sign TRAFFIC SIGNAL ISSUES Carroll Avenue traffic signal at Lincoln SHA SHA's District 3 office has initiated a study of this request Flower Avenue traffic signal instead of proposed stop signs at Maplewood SHA SHA believes intersection will operate acceptably with stop suign and signal not warranted Maple Avenue two new traffic signals to flash red off hours SHA Takoma Junction Improve signal timing SHA Adjusting signal timing is included in the project Sligo Creek Parkway traffic signal instead of 3 way stop, dedicated left turn, no right on red at Old Carroll SHA, MNCPPC SHA believes intersection will operate acceptably with stop suign and signal not warranted Sligo Creek Parkway left turn arrow for west bound traffic at Piney Branch SHA Outside of impact area GENERAL REQUESTS RECEIVED Authority Monitor traffic for 3 to 5 days on each impacted street prior to closure to establish pre-construction baseline To be completed in mid September Encourage "kind driving" through Newsletter articles and social media included in staff recommendations Kids sign contest - winning signs to be made and installed along residential routes Require contractors staff to park within construction zone, not on residential streets SHA Contractor required to follow traffic regulation, staging is expected to be on bridge approaches Actively advertise Ride Share resources included in staff recommendations Use speed trailer and get more speed indicators, install on neighborhood streets Paint all crosswalks and stop bars in area prior to bridge work included in staff recommendations Snow removal for detour routes needs to be high priority for all entities SHA, MNCPPC, Tincluded in staff recommendations Repair/replace sidewalks on Carroll Ave between Philadelphia and Bridge SHA, Concern about impact to wooded area from construction, staging. Concerns include noise, pollution, light SHA Bike sharrows and "bikes may use full lane" signs along entire detour route SHA, MNCPPC, Temporary Pedestrian Bridge - 8 foot minimum (now 5 to 8) SHA