B787-8 AIRCRAFT WEIGH WORKSHEET

Similar documents
BOEING AIRCRAFT WEIGH WORKSHEET

Weighing your Seabee

AIRCRAFT PRIMARY CONTROLS A I R C R A F T G E N E R A L K N O W L E D G E

WIPLINE 3450 SEAPLANE FLOATS

Fire Apparatus Operator: ARFF

Fire Apparatus Operator Aircraft Rescue and Fire Fighting

AEROCET 3400 AMPHIBIOUS FLOATS

TECHNIQUES FOR OFF AIRPORT OPERATIONS

CSSna HIAWK FLOATPLANE WNER'S MANUAL SUPPLEMENT D CES-100-3/73

FLIGHT MANUAL SUPPLEMENT

ANNEX TO TYPE CERTIFICATE No. ULL - 07 / 2003 a

FAA-S-ACS-6 June 2016 Private Pilot Airplane Airman Certification Standards. Task ACS Settings

Brief Maintenance Manual DAR-Solo

General. Procedure Checklists. Emergency Procedures. FSD Aerostar 700P Superstar

SUPPLEMENT SEPTEMBER 2010 HIGH ALTITUDE TAKEOFF AND LANDING (ABOVE 14,000 FEET PRESSURE ALTITUDE) MODEL AND ON 68FM-S28-00 S28-1

II.E. Airplane Flight Controls

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

Emergency Vehicle Driver

BASIC AIRCRAFT STRUCTURES

AS0403 Aircraft Systems & Instruments G.Mahendra Perumal

Apparatus Driver/Operator Evaluation Form Rosenbauer Tanker:

Chapter 3: Aircraft Construction

The Evaluator shall ask the Apparatus Driver/Operator questions regarding the mechanical systems and size of the apparatus.

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

B737-3/4/5 CFM56 MAINTENANCE PRACTICE TRAINING MANUAL B1/B2 LEVEL

SPH 4C Unit 4 Hydraulics and Pneumatic Systems

Cessna 152 Standardization Manual

Apparatus Operator/Pumper

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

Commercial Maneuvers for PA28RT-201

ON-DECK TRIP: Charter Boat Check-Out/Check-In Form

Cover Page for Lab Report Group Portion. Head Losses in Pipes

ILS APPROACH WITH A320

Theory of Flight Aircraft Design and Construction. References: FTGU pages 9-14, 27

INSTRUCTIONS FOR CONTINUED AIRWORTHINESS AND EQUIPMENT MAINTENANCE MANUAL FOR OXYGEN BOTTLE MOUNT

Marine Safety Center Technical Note

Compiled by Matt Zagoren

Colorado Division of Fire Prevention & Control Driver Operator Pumper JPRs (NFPA 1002, 2014 Edition)

C-130 Reduction in Directional Stability at Low Dynamic Pressure and High Power Settings

Beechcraft Duchess 76 Maneuver Notes

State of Oregon Department of Public Safety Standards and Training. Driver Task Book. Task Book Assigned To:

Grove TMS800E Product Guide

V mca (and the conditions that affect it)

Cessna 172S Skyhawk Standardization Manual

Lesson: Pitch Trim. Materials / Equipment Publications o Flight Training Manual for Gliders (Holtz) Lesson 4.4 Using the Trim Control.

KEY CONCEPTS AND PROCESS SKILLS. 1. Creating models is one way to understand and communicate scientific information.

Linde Hydraulics Corporation, P.O. Box 82, Canfield, Ohio 44406

Fire Apparatus Operator: Pumper

Colorado Division of Fire Prevention & Control Driver Operator JPRs (NFPA 1002, 2014 Edition)

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

ROTORCRAFT FLIGHT MANUAL SUPPLEMENT. TO THE BELL MODEL UH-1H ROTORCRAFT FLIGHT MANUAL for the APICAL EMERGENCY FLOAT KIT

Swimming Pools, Hot Tubs and Spas

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Phuel Modular Control Units

Single Engine Complex Training Supplement PA28R-201 Piper Arrow III (Spring 2016 Revision)

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

Chapter 2. Before You Get Underway. Copyright Coast Guard Auxiliary Association, Inc.

Technical Knowledge and Aerostatics (Balloon) This syllabus presupposes a knowledge and understanding already attained at PPL level.

Fire Apparatus Operator: Pumper

CIVIL AIR PATROL United States Air Force Auxiliary Cadet Program Directorate. Cessna 172 Maneuvers and Procedures

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

OPERATION MANUAL NTF-15

STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

OPERATION MANUAL NTF-60 Plus

Bugatti 100P Longitudinal Stick Forces Revision A

SECTION 1 - GENERAL SECTION 2 - LIMITATIONS SECTION 3 - EMERGENCY PROCEDURES

Southern Eagles Soaring

POWER-OFF 180 ACCURACY APPROACH AND LANDING

Columbia 300 (LC40-550FG) Information Manual Revison No. 2 (January 2003)

STOL CH rd Edition Drawings, dated April 16, 2012 Summary of changes from Edition 2 Revision 1 to Edition 3.

Inspecting a motorsport vehicle during a competition

Deccan Charters Private Limited

Maintenance Schedule for Gliders and Powered Gliders

Visualized Flight Maneuvers Handbook

NORMAL TAKEOFF AND CLIMB

SERVICE BULLETIN. Service Bulletin Equipment Manufacturer Notification SB-ASTM-CTSW-99 SB-ASTM-CTLS-99 SB-ASTM-MC -99


Certification Specifications for Normal, Utility, Aerobatic, and Commuter Category Aeroplanes CS-23

1. Once you have completed the NAUI Scuba course, you will be qualified to

V.A. Preflight Inspection

PERFORM Operating Document

AIRMOUNT VIBRATION ISOLATION

Idaho Fire Service Technology Pumping Apparatus Driver/Operator Skill Sheet: 1

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

ENERGY BLADE 3K4. Energy Blade Installation Instructions

Vortex Generator Installation Addendum

PL475. Patient Lift Scale. Owner's Manual

License to Keel Boat Manual

MyControl Bathing System Signature Series

GROVE MODEL RT58D - 20 TON CAPACITY

FRESH AERO EasyLift System For Grumman AA-1 & AA-5 Series Aircraft. User Manual. Where Imagination Meets Innovation. The Steelebrook Group

The Discussion of this exercise covers the following points:

75 Ton SD Shop Press Operating Instructions

Tecnam Eaglet Standard Operating Procedures and Maneuvers Supplement

XI.C. Power-Off Stalls

INSTRUCTOR GUIDE REFERENCES: PUMPING APPARATUS DRIVER/OPERATOR HANDBOOK, FIRST EDITION, IFSTA

Phuel Portable Control Units

Ice Protection System

Transcription:

WEIGHING FACILITIES AND EQUIPMENT ITEM MECH INSP The airplane should be weighed inside a closed facility that will: Exclude all wind and drafts. Permit shutdown of air conditioning during the weighing operation. Maintain a relatively constant temperature. Provide a level weighing surface and sufficient overhead clearance. The required equipment for weighing an airplane consists of: Certified electronic or mechanical weighing equipment. Plumb bob PREPARATION FOR AIRPLANE WEIGHING The airplane configuration is of extreme importance in the derivation of a defined airplane operating weight from an actual scale weight. The interior and exterior of the airplane must be as complete as possible. All fluid levels (fuel, oil, water, hydraulic) must be known quantities. The weighing area and equipment usage must be controlled to avoid errors and minimize variation in scale readings. 1 Fuel Fuel from all tanks is drained to the trapped (usable and unusable) fuel condition. Trapped fuel is defined as the quantity of fuel which cannot be removed through the production sump tank drains. To obtain trapped fuel condition: (a) Pump off all usable fuel to sump level, REF AMM TASK DMC-B787-A-28-26-00-01B-221A-A. (b) Adjust and maintain airplane attitude at 0.8 degrees nose down (±0.1 degree) longitudinal and 0.0 degrees (±0.1 degree) lateral. (c) Drain the remaining fuel through sump drain valves, REF AMM TASK DMC- B787-A-12-11-02-00A-221A-A. 2 System Fluids System fluids must be drained or at a known quantity as follows: (a) Drain all waste tanks, REF AMM TASK DMC-B787-A-12-17-01-00A-200A-A. (b) Drain to empty the potable water system, REF AMM TASK DMC- B787-A-12-14-01-00A-228A-A. FORM No: 787-08-12-00 ISSUE: 03 Page 1 of 6

ITEM MECH INSP 2 The following systems must be serviced for flight: (c) Engine Oils, REF AMM TASK DMC-B787-A-12-22-01-00B-200A-A. (d) Hydraulic Fluids, REF AMM TASK DMC-B787-A-12-12-01-00E-369A-A. (e) Oxygen, REF AMM TASK DMC-B787-A-12-15-08-00C-200A-A. (f) Main Landing Gear Oleo Oil, REF AMM DMC-B787-A-12-15-01. (g) Nose Landing Gear Oleo Oil, REF AMM DMC-B787-A-12-15-02. (h) Fire extinguisher charge, REF AMM DMC-B787-A-26-20-00 3 Airplane Configuration The condition of the airplane at the time of weighing must be one that is well defined and can be easily repeated. Each of the following steps must be completed prior to weighing: (a) Inventory the airplane using the applicable Configuration and Safety Equipment Drawings listed in CATP 15, Configuration Manual. Record any missing items on the table provided on page 6, and hi-light these to the aircraft weigher prior to weighing the aircraft. (b) Remove all shop equipment, tools, and trash. (c) Stow all loose equipment items in their proper locations. (d) Dry the airplane thoroughly. (e) Close all doors and access panels. (f) Retract the flaps fully. (g) Set the horizontal stabilizer, control surfaces, and spoilers to their neutral positions. (h) Inflate landing gear tires to specified operating pressures, REF AMM TASK DMC- B787-A-12-15-03-00A-200A-A. FORM No: 787-08-12-00 ISSUE: 03 Page 2 of 6

ITEM WEIGHING OPERATION MECH INSP The airplane should be weighed in a level longitudinal attitude when possible. If the airplane cannot be leveled for weighing, the longitudinal attitude must be within + or - 2 degrees from level during the actual weighing operation, and the measured center of gravity must be arithmetically corrected to an equivalent level center of gravity. This requires application of the correction factors from TABLE 1 (Non-Level Weighing). The recommended method of determining the longitudinal attitude of the aircraft is to attach a plumb bob to the plumb bob fitting located in the left main gear wheel well and to read the longitudinal attitude from the corresponding scale. 4 WEIGHING PROCEDURE USING PLATFORM SCALES Carry out aircraft weighing as directed by Weighing Engineer, using the following procedure:- The following procedure outlines the method for weighing the airplane on portable or floor level platform scales. The scales may be mechanical beam or electronic. Follow weighing equipment manufacturer's operating instructions. (a) The balance arm for the nose gear when using platform scales is B.A. 268.5. (b) To obtain the balance arm location of the main gear, it is necessary to measure the main landing gear oleo extension since the balance arm of the weight reaction point varies with the extension of the oleo strut (Refer to Figure 1 JACK POINT BALANCE ARMS VERSUS OLEO EXTENSION). (c) Follow weighing equipment manufacturer s operating instructions. (d) Zero the platform scales prior to putting the airplane on the scales. All undesirable tare should be off the scales. (e) Position the airplane on the scales. The approach should be straight and the airplane should be brought slowly and smoothly to a stop, without applying airplane brakes. (f) Inflate or deflate landing gear oleos as required to obtain the desired longitudinal attitude. Check the attitude with the plumb bob. (g) Record landing gear oleo extensions. (h) Record weight reading obtained from each airplane weight reaction point. (i) Remove the airplane from the scales. (j) Check the scales for zero load condition. (k) Repeat weighing procedure as needed to verify airplane weight. FORM No: 787-08-12-00 ISSUE: 03 Page 3 of 6

NON-LEVEL WEIGHING When the airplane is weighed in a non-level condition, the calculated C.G. must be corrected to the level condition. The attitude of the airplane must be known at the time of weighing. Determine the C.G. of the airplane in this non-level condition, and then use the following tables to correct the C.G. to the level condition. TABLE 1 Non-Level Weighing Example An airplane weighed in a 1-1/2 degree tail down attitude has a calculated, non-level C.G. at B.A. 1091.5 IN. Applying the C.G. correction of -3.8 inches (from the table) gives the level attitude C.G. at 1087.7 IN. FORM No: 787-08-12-00 ISSUE: 03 Page 4 of 6

JACK POINT BALANCE ARMS VERSUS OLEO EXTENSION The following main landing gear figure shows how to determine the amount of oleo extension (Dimension A ). The corresponding chart diagrams the relationship between the main landing gear forward and aft axle jack point balance arms and the main landing gear oleo extension (Dimension A ). FIGURE 1 FORM No: 787-08-12-00 ISSUE: 03 Page 5 of 6

MISSING ITEMS RECORD ITEM DESCRIPTION POSITION QUANTITY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 This task was carried out and completed in accordance with the requirements of the MOE, Part 2, Section 2.16. Maint. Organisation Approval Ref: PRINT NAME: DATE: SIGNATURE: STAMP: The Stamp/Signature in inspection Column denotes work has been carried out in accordance with the above certification. FORM No: 787-08-12-00 ISSUE: 03 Page 6 of 6