Implementing Active Transportation (AT) Facilities in Small Communities

Similar documents
Transportation Master Plan Advisory Task Force

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

The study area for this project is the entire County of Oxford including both the urban centres and rural areas.

(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Welcome. If you have any questions or comments on the project, please contact:

Perryville TOD and Greenway Plan

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Welcome. Background. Goals. Vision

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Living Streets Policy

*Presenter at the 2008 TAC Conference

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

Shifting Gears for a Healthier City.

Shifting Gears for a Healthier City

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Service Business Plan

Ajax: The Road to Complete Streets

City of Waterloo Complete Streets Policy

Zlatko Krstulich, P.Eng. City of O9awa

Toronto Complete Streets Guidelines

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Active Transportation Infrastructure Investment A Business Case

SUPPORTING DOCUMENTATION PROPOSED TRAILS DEVELOPMENT AND IMPLEMENTATION PLAN

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Physical Implications of Complete Streets Policies

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Goals, Objectives, and Policies

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

BIKE PLAN CONTENTS GATEWAY

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

Discussion Paper 1 June 2014 Current State of Transportation in Burlington

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Public Consultation Centre For. Transportation Master Plan Update. Information Package

Section 9. Implementation

PEDESTRIAN ACTION PLAN

Welcome to the Open House

TRANSPORTATION NEEDS ASSESSMENT

Arterial Transitway Corridors Study. Ave

GD 0043/18 ACTIVE TRAVEL STRATEGY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

MASTER BICYCLE AND PEDESTRIAN PLAN

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

University of Leeds Travel Plan

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

We support the following: Tom Davies Square 200 Brady Street Sudbury, Ontario

ACTIVE TRANSPORTATION

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Bicycle Facilities Planning

10.0 CURB EXTENSIONS GUIDELINE

2. Context. Existing framework. The context. The challenge. Transport Strategy

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Tonight is for you. Learn everything you can. Share all your ideas.

Public Consultation Centre

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Cycling Master Plan Community Engagement Session WELCOME

Cycle Track Design Best Practices Cycle Track Sections

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

IBI Group November 5, 2012

Frequently Asked Questions (FAQ)

102 Avenue Corridor Review

OTM Book 18 Cycling Facilities Update

Launceston's Transport Futures. Greater travel options for the people of Launceston

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Non-Motorized Transportation 7-1

Pennsylvania Avenue (CR 484) Design Alternatives Study

CHAPTER 7.0 IMPLEMENTATION

Public Transportation and Bicycle & Pedestrian Stakeholder Webinar. April 11, :30 PM

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Executive Summary Route 30 Corridor Master Plan

Request for Decision. Ontario Municipal Commuter Cycling Program Grant. Resolution. Presented: Tuesday, Feb 13, 2018

2.0 LANE WIDTHS GUIDELINE

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PBIC Webinar. How to Create a Bicycle Safety Action Plan: Planning for Safety [IMAGE] Oct. 2, 2014, 2 pm

Transcription:

Implementing Active Transportation (AT) Facilities in Small Communities Dave McLaughlin M.ES, MCIP, RPP, Partner & Senior Project Manager Presenters: Jay Cranstone, MLA, OALA, CSLA, Associate & Senior Project Manager Claire Basinski, B.ES, MCIP, RPP, Project Planner

Presentation Overview About the Presenters Overview of Active Transportation Who are the Users? Establishing Political Support Identifying the Benefits Identifying the Challenges Tailoring the Approach for Smaller Communities Describing the Elements Illustrating the Successes: Case Study Overview Case Study #1: Wellington County, ON Case Study #2: Elgin St. Thomas, ON Case Study #3: Leamington, ON Lessons Learned 2

About the presenters Dave McLaughlin MES, MCIP, RPP Partner Senior Project Manager Project Managed over 75+ Active Transportation Related master plans and projects Co-authored the Ontario Traffic Manual (OTM) Book 18 and MTO s Bikeway Design Guidelines Jay Cranstone B.Sc., MLA, OALA, CSLA Associate Senior Project Manager Project Managed and contributed to numerous trail and active transportation master plans Involved in a number of trail design studies including route signage and way-finding Claire Basinski BES, MCIP, RPP Project Planner Contributed to over 20 trails and cycling master plans Contributes to the development of public and stakeholder engagement strategies for master plans 3

What is Active Transportation? Use of an Active Transportation mode for exercise, recreation pursuits, such as hiking, cycling, etc. Trips to and from school, shops, visiting friends and running errands Journeys to and from work or school or more frequent destinations Trips made during the work day to do errands or to attend meetings 4

We know who the users are Cyclists: Commuter Recreational Touring Pedestrians: Walkers Hikers Joggers / Runners No Way No How 30% Strong & Fearless <1% Enthused & Confident 5 10% Interested but Concerned 60% Utilitarian Recreational Touring For day to day transportation to get to and from work or school or primary destinations Use on-road routes year round or most of the year Good mobility skills and know the rules of the road Use the network for fitness or leisure Used for travel on weekends Trips to and from major destinations or areas of significance Will use secondary / neighbourhood connections Used as a mode to explore areas of significant long distances trips vary from full day to multi-day excursions Trips are planned in advance Spending on accommodation and food Source: Roger Geller, Portland Office of Transportation 5

We know there is support The promotion of active transportation has led to special emphasis on on-road / off-road facilities for non-motorized movements within cities. (Transport Canada, 2011) Significant support at the local municipal level including: Official Plans, Active Transportation or Trails Master Plans, Transportation Master Plans, Strategic Plans Also engage with: Health units, Tourism organizations, School boards, Local clubs and interest groups, Retailers and businesses 6

The Ontario example Active Transportation related plans, infrastructure and active living / health promotion initiatives are being rolled out by small towns and large cities across Ontario and nation-wide 7

Benefits for municipalities of all sizes 1 Community Health & Safety Provides opportunities for physical activity Enables healthy active lifestyles Makes communities more liveable 2 Transportation Provides residents and visitors with choice of mode options Reduces dependence on travel by personal auto 3 Economic & Tourism Reduced health care costs Supports local tourism Increases in jobs and local investment 4 Asset Management Provides a means to appreciate and assist in protecting natural and cultural heritage resources 5 Environment Energy efficient and non-polluting Resource conservation and large energy savings 1% shift reduces fuel consumption 6 Community Building Brings communities together Builds community spirit Fosters stewardship 8

What are some of the challenges? Physical Political Momentum & Outreach 9

A tailored approach is needed Identify Champions Respond to Public Demand Use a Complete Streets Approach Build on Existing Design Guidelines Identify Context Sensitive Solutions Leverage Economies of Scale Coordinate with other Capital Works Projects Provide ongoing Promotion & Education 10

How can you Identify Champions Respond to Public Demand Engage individuals from external agencies (e.g. Health Units, Tourism organizations etc.) Seek buy-in from the public as well as municipal Council early in the process Facilitate ongoing commitment Consultation with a wide range of users groups (cyclists, pedestrians, in-line skaters) Promote at local destinations and meeting points Target all sectors of the population including youth, seniors, etc. 11

How can you Build on Existing Design Guidelines Review existing municipal standards and guidelines Compare with existing standards (OTM Book 18, OTM Book 15, TAC Bikeway Control Guidelines) Stay informed on best practices 12

How can you Identify Context Sensitive Solutions Undertake detailed field investigation Assess and document unique characteristics Engage design specialists and research design best practices and alternatives SHARED DEDICATED SEPARATED 13

How can you Use a Complete Streets Approach Balance the wants and needs of cyclists, motorists, pedestrians, etc. Ensure accessibility for people of all ages and abilities Engage transportation, municipal and land use planners in the design process Complete Streets in Grey and Bruce County Source: Complete Streets For Canada In many rural areas, single-industry community economies are weakening, young people are migrating out to larger urban areas, and rural areas are greying...there is a need to develop alternatives to the car - (http://rewnewcanada.net/2012/transit-free-zone) 14

How can you Leverage Economies of Scale Coordinate with other Capital Works Projects Provide ongoing Promotion & Education Work with other municipalities and the province and federal government Establish funding partnerships Explore federal and provincial grant programs, and partnerships with other organizations (e.g. local service clubs) Strategic phasing and implementation strategies Communication and collaboration between internal departments Update capital works budgets annually based on master plan priorities In addition to infrastructure promote the benefits of active transportation Educate users about how to safely use facilities Target people of all ages and abilities Implement simple but effective initiatives (e.g. bike parking) 15

Case Study #1: Wellington County, ON Create and improve opportunities throughout the County for active recreation and active transportation. Study Initiation: December 2011 Study Completion: September 2012 Study Objectives: Examine current conditions and recommend network of AT facilities. Recommend education and promotion programs and identifying costs and priorities as part of a phased action plan. Key Considerations: Active Transportation steering committee helped to prepare the master plan Active Transportation Plan also included a trails master plan for one of the local municipalities 16

Case Study #1: Wellington County, ON The County includes 7 municipalities plus the City of Guelph The County has an area of 2,660 km 2 County is bordered by Huron, Grey, Perth and Dufferin County and Waterloo Region, Hamilton, Halton Region and Peel Region Trail tourism plays a large role in the County they developed the Wellington Walks Trail Guide as well as a number of visitor maps City of Guelph is geographically part of the County but is a separate political and administrative body The County s municipal populations range from 7,029 to 26,693 The County has a number of conservation areas and existing trail systems along natural heritage areas The County initiated their Green Legacy Programme in 2004 and is committed to sustainability 17

Case Study #1: Wellington County, ON What were the challenges? Physical Political Promotion & Outreach How to develop a network at a broad scale Getting buy-in from County and Local staff and Council Understand where you are at and build upon it 18

Case Study #1: Wellington County, ON How did the study Leverage Economies of Scale Commitment from the County to help support the development of local municipal initiatives Received partnership funding from provincial sources through Wellington-Dufferin-Guelph Public Health Collaborate with other Capital Works Projects Worked collaboratively with the engineering and community services departments to review capital works budgets and timelines Coordinated proposed phasing with proposed County and Local Municipal priorities Identify Champions Engaged local municipal and County staff as well as local stakeholders through an AT Advisory Committee Key coordination and lead role by Wellington-Dufferin- Guelph in motion 19

Case Study #1: Wellington County, ON How did the study Identify Context Sensitive Solutions Identified key locations throughout the County where additional design consideration was required Undertook review of best practices for projects of a similar scope and scale Respond to Public Demand Undertook two Public Information Centres at local events Held a number of stakeholder workshops and working group sessions Prepared and distributed an online and hard copy questionnaire (given to youth, seniors, etc.) Provide on-going Promotion & Education Established a communication strategy based on existing efforts Review best practices for Ontario municipalities of a similar scope and scale for successful initiatives 20

Case Study #1: Wellington County, ON Overcoming the Physical Challenges: Develop a Consistent Set of Route Selection Criteria Visible Connected / Linked Integrated Attractive and Interesting Diverse Comfort & Safety Accessible Context-Sensitive Sustainable 21

Case Study #1: Wellington County, ON Overcoming the Political Challenges: Strategically engage and collaborate with County and Local decision makers and designers through workshop sessions Session #1 Developing the Network Session #2 Establishing Priorities Additional Strategy to Consider: Develop and undertake a training session to educate staff who will be implementing the plan 22

Case Study #1: Wellington County, ON Overcoming the Promotion & Outreach Challenges: Establish a set of performance measures Total of 27 performance measures suggested : Number of kilometres of built AT infrastructure Number of users on the trail and cycling network Number of people within 2.5km radius of a trailhead Etc. Collect Baseline Information for Trail and Active Transportation Facilities Invest in technology to help gather additional data Source: ww.ivantechnologies.com 23

Case Study #2: Elgin-St. Thomas, ON To create and improve active transportation and active recreation opportunities throughout Elgin-St. Thomas for residents and visitors of all ages and abilities. Study Initiation: May 2012 Study Completion: December 2012 Study Objectives: Develop a connected network of AT facilities Identify potential opportunities and implementation priorities Provide opportunities to engage in AT throughout Elgin-St. Thomas Key Considerations: Collaboratively led by Elgin St. Thomas Public Health and an active transportation advisory committee Used a range of engagement tools such as an online questionnaire Prepared AT strategy 24

Case Study #2: Elgin - St. Thomas, ON The County includes 6 municipalities plus the City of St. Thomas The County has an areas of 1,880 km 2 County is bordered by Chatham- Kent, Middlesex County, Oxford County and Norfolk County Tourism plays a large role in the promotion of trails, hiking and cycling (e.g. Elgin arts trail and Savour Elgin) The City of St. Thomas is physically part of the County but has its own government Local municipalities in the County have populations that range from 3,876 to 12,743 Located on Lake Erie (90 + km of coastline), some communities have seasonal population fluctuations County has direct access to 3 major highways 401, 403 and 402 25

Case Study #2: Elgin St. Thomas, ON What were the challenges? Physical Political Promotion & Outreach Determining what to implement first Identifying a champion to lead the development of the AT Initiative Maintaining momentum gained during the development of the AT Initiative 26

Case Study #2: Elgin St. Thomas, ON How did the study Build on Existing Design Guidelines Consolidated and reviewed existing design guidelines and standards Assessed existing design best practices Updated standards to be consistent with OTM Book 18, OTM Book 15 and TAC Bikeway Control Manual Respond to Public Demand Undertook two PICs at local events Posted promotional materials on local buses and engaged local media Handed out hard copy questionnaires at schools, cinemas and homeless shelters Provide on-going Promotion & Education Established an education, encouragement, evaluation and communication strategy Documented and promoted active transportation benefits to the public 27

Case Study #2: Elgin St. Thomas, ON How did the study Use a Complete Streets Approach Took into consideration all user groups (cyclists, pedestrians, hikers, inline skaters, etc.) Designed for both urban and rural areas throughout the County Identify Champions Engaged with local staff, the development community, citizens at large and county staff through an advisory committee Actively led by Elgin St. Thomas Public Health Received local support 28

Case Study #2: Elgin St. Thomas, ON Overcoming the Physical Challenges: Using Share the Road Signage to increase awareness and connect key linkages Previously implemented Share the Road Signs on one key route (connection between St. Thomas and Port Stanley) Interest in extending Share the Road Signage to several other key routes (e.g. Lake Erie Waterfront Trail Route) Low cost to implement Interest in taking next steps to initiate further implementation of the network 29

Case Study #2: Elgin St. Thomas, ON Overcoming the Political Challenges: Identify a key partner such as Public Health to lead the development and monitoring of the AT strategy and to help coordinate efforts from local and county staff 30

Case Study #2: Elgin St. Thomas, ON Overcoming the Promotion & Outreach Challenges: Leveraged consultation and outreach undertaken as part of the study to establish ongoing programs and initiatives Custom bike rack initiative & continued local engagement Developed a central hub for AT information www.activeelgin.ca 31

Case Study #3: Leamington, ON The County of Essex and its municipal partners are undertaking a feasibility design study to confirm the aligned and facility type for the proposed active transportation facility along Country Road 20 in Leamington. Study Initiation: August 2013 Study Completion: October 2013 (anticipated) Study Objectives: To complete a feasibility design study for a segment of County Road 20 Need for context sensitive solution to accommodate pedestrians and cyclists Study Approach: Review Existing Characteristics Develop Design Alternatives Visual Field Investigations Evaluation of Design Alternatives Functional Design of Preferred Alternative Key Considerations: Constrained corridor insufficient space for both cycling and sidewalk infrastructure Design to have little to no impact on existing utilities, hydro poles, etc. 32

Case Study #3: Leamington, ON CWATS Network Facility Type Map Leamington Area: 261.9km 2 Population: 28,400 Leamington is on of the primary settlement areas in Essex County 33

Case Study #3: Leamington, ON What were the challenges? Physical Political Momentum & Outreach Constrained corridor - need to improve conditions for both cyclists and pedestrians while minimizing the costs to modify the existing infrastructure Need to obtain local municipal council support and proceed to implementation Facilitate buy-in for the Preferred Design by the Public and Local Municipal Council 34

Case Study #3: Leamington, ON Addressing the Physical Challenges: Develop an understanding of key roadway characteristics Located on the edge of the urban area in Leamington Mix of agriculture uses and single family homes on large lots Established cycling traffic - large proportion of migrant workers Will be part of Lake Erie Waterfront Trail 5% percent of truck traffic Speed limit varies (60-80km/hr.) Lake Erie 35

Case Study #3: Leamington, ON Addressing the Physical Challenges: Alternative 1 AT Facility with Existing Mountable Curb Establish a set of context-sensitive design alternatives which incorporate walking and cycling facilities Existing travel lane 3.75m and mountable curb 0.75m width AT Facility would be installed behind the existing mountable curb The width of the AT Facility 1.5m (minimum 1.2m) A clear zone of 0.3-0.5m Alternative 2 AT Facility with New Mountable Curb in Existing Location Existing travel lane 3.75m and mountable curb 0.75m width Mountable curb would be replaced in its existing location AT Facility would be installed behind the new mountable curb The width of the AT Facility 1.5m (minimum 1.2m) A clear zone of 0.3-0.5m 36

Case Study #3: Leamington, ON Addressing the Physical Challenges Cont d.: Alternative 3 AT Facility with New Mountable Curb in New Location Mountable curb is replaced and moved toward the centre of the road by 250mm Travel lane would be reduced to 3.5m AT Facility would be installed behind the new mountable curb The width of the AT Facility 1.5m (minimum 1.2m) A clear zone of 0.3-0.5m Alternative 4 AT Facility with Barrier Curb and Side Inlets Existing travel lane 3.75m width Mountable Curb (0.75m) is replaced with a Barrier Curb (0.6m) in the existing location AT Facility would be installed behind the new barrier curb The width of the AT Facility 1.5m (minimum 1.2m) A clear zone of 0.3-0.5m 37

Case Study #3: Leamington, ON Addressing the Physical Challenges: Reviewing the alternative design solutions based on key roadway characteristics / considerations Separation from Motor Vehicles The spatial and/or physical separation between motor vehicles and pedestrians or cyclists Cyclists and Pedestrians prefer to travel further away and with some form of separation from the motor vehicle travel lane Operating Space Seek to provide a minimum of 1.2m operating space for pedestrians and cyclists Drainage Minimize impacts to drainage of the roadway and the boulevard due to changes to accommodate the AT facility 38

Case Study #3: Leamington, ON Addressing the Physical Challenges Cont d.: Land Requirement Active transportation facility should be located within the public right-of-way Minimize the need for land acquisition or the need for an easement from adjacent land owners Any impacts to adjacent vegetation, signs, or utilities Constructability Level of effort required to install/construct The impact of modifying the existing road right-of-way to implement the preferred design alternative Construction Cost Cost to accommodate active transportation facility within corridor (incl. design and contingency allowances) based on local market unit/tender prices of similar projects 39

Case Study #3: Leamington, ON Overcoming the Promotion & Outreach Challenges: Confirm the Alternatives Evaluation Prepare a Functional Design Concept Engage with Members of the Public & Stakeholders Tender Project Complete evaluation of alternatives using the six evaluation criteria Preliminary assessment suggests Alternative 1 or 2 Complete a functional design of the preferred alternative Hold an open house with stakeholders and members of the public to present and gather input on the preferred alternative Bring the project to tender May required some detailed design Sample of Preferred Design concept in Leamington, ON 40

Lessons Learned Seek Partnerships Keep the Public Engaged Build the Business Case Prepare Implementation Tools (e.g. Identify annual priorities) Leverage Investment Identify a Champion Apply Complete Streets Approach Establish on-going Promotion & Outreach activities 41

Thank you Questions? 42