PROVING THAT BLADDER SURGE TANKS CURED EXCESSIVE SURGE CONDITIONS IN A 30 FORCE MAIN

Similar documents
Asheville s Fairview Water System Improvements: from Modeling to Contract Documents. April 19, 2016 Meg Roberts, PE

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS

Tirpur Area Water Supply Project A Report on Transient Modeling Study

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Evaluating Surge Potential in CSO Tunnels

Pumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE

Appendix M. Hydraulic Transient Analysis

Suppress Your Surges: Surge Suppression Fundamentals. April 13, 2017

SECTION PRESSURE TESTING OF PIPING

Monitoring for Negative and Transient Pressures in Distribution Mains

PUMP CONSULTING & TRAINING LLC Joseph R. Askew 1811 Stonecrest Ct. Lakeland, Fl

Selecting Controls for Water Distribution Systems

Hydraulic transients, also known as pressure

Technical Bulletin 161. How Deep Can I Design my Aeration Tanks? by:

Memorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes.

Transient Analysis and Design Considerations for Hydraulic Pipelines. Jonathan Funk, EIT

RICK FAUSEL, BUSINESS DEVELOPMENT ENGINEER TURBOMACHINERY CONTROL SYSTEM DESIGN OBJECTIVES

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

Specifications for Synchronized Sensor Pipe Condition Assessment (AS PROVIDED BY REDZONE ROBOTICS)

Vibration and Pulsation Analysis and Solutions

Becker* Products Below Ground Ball Valve Regulators

Sacramento Regional County Sanitation District. Interceptor Sequencing Study. Technical Memorandum 5 Unit Costs for Interceptor Pipe.

2003 WJTA American Waterjet Conference August 17-19, 2003 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT?

TUTORIAL. NPSHA for those who hate that stuffy word. by Jacques Chaurette p. eng. copyright 2006

CASE STUDY. Compressed Air Control System. Industry. Application. Background. Challenge. Results. Automotive Assembly

CIPP For Large-Diameter Pressure Pipes. Andrew Costa Aegion Corporation

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Water & Waste Water. Engineered No Shutdown Piping Solutions. Hot / Wet Tapping Line Stopping Valve Inserting

2016 Webinar Sponsors

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

Flexibility Enhancements for Gas Turbines

22. Specialty Valves.

IMPROVED XENON LOADING EQUIPMENT WITH LOADING CAPACITY UP TO 1200 KG FOR ALPHABUS

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

Offshore Equipment. Yutaek Seo

DESIGN DATA. Dry 105a. September 5, 2008

Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling

It s Just Calibration How Hard Can It Be?

Outlet Structures T-12

icon i150 / i350 Installation / Operation Manual

Copyright, 2005 GPM Hydraulic Consulting, Inc.

Monitoring for Transient Pressures in Pipelines. By Will Worthington, P.E. 1

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

Tube rupture in a natural gas heater

Sizing Pulsation Dampeners Is Critical to Effectiveness

Simplicity in VRU by using a Beam Gas Compressor

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

4m Blanco Glycol Chiller system: history, recent events, present status and plans

MSC Guidelines for Compressed Air Systems

API Standard Venting Atmospheric and Low-Pressure Storage Tanks: Nonrefrigerated and Refrigerated

The HumiPyc - Model 1 - Gas Pycnometer; Density, Moisture, Permeation Analyzer; RH sensor Calibrator

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

Boston s Pilot Project to Measure CSO Flows Relies on New Technology and Scattergraphs to Detect Overflows

Pump Selection and Sizing (ENGINEERING DESIGN GUIDELINE)

Pressure surge absorption

TECHNICAL DATA. Q = C v P S

Test pumps. Pressure sources. Good reasons for proper and reliable calibration

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

TECHNICAL DATA. Q = C v P S

TEST SPECIFICATION NYT-909-C

TECHNICAL DATA. Q = C v P S

BACK PRESSURE / SUSTAINING

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

CLEANING, INSPECTION, AND TESTING OF SEWERS

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

Recent Developments in Pressure Management

current supply and what is needed for future conditions; this is not the total water demand for these utilities.

BACK PRESSURE / SUSTAINING

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1

AUTOMATIC FLOW CARTRIDGES. Competition Analysis Not All Automatics Are Created Equal

Significant Change to Dairy Heat Treatment Equipment and Systems

USE OF ISOLATION STOPPLES FOR VALVE REPLACEMENT ON TRANS ALASKA PIPELINE

TEK-SUB 4800B. Submersible Level Transmitter. Flow Level Temperature Pressure Valves Analyzers Accessories TekValSys LEVEL

Theory, Applications and Sizing of Air Valves

SyncroFlo Municipal University and Hydraulic Institute, Pump Systems Optimization

Management of Change (MOC) Could Have Prevented Death

Interlake Tunnel WRA Board Workshop. August 25, 2014

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Susceptibility of Distribution Systems to Negative Pressure Transients. Presenters: Kala Fleming and Mark Le Chevallier Moderator: Jian Zhang

Curves GL-599 R1. Series A-C Hz

CASE STUDY. Elvington To Brayton Barff Air valve replacement Program

Every things under control High-Integrity Pressure Protection System (HIPPS)

Moving Fluids Concept and Theory

Office Use Only Fee Paid

The HumiPyc ( Model 2) - Gas Pycnometer; Density, Moisture, Permeation Analyzer; Filter Integrity Tester; RH sensor Calibrator

INF.41/Add.1/Rev.1. Economic Commission for Europe Inland Transport Committee

PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS. Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow

JUST WHEN YOU HAD SEEN IT ALL: THE VALUE OF HIGH FREQUENCY PRESSURE DATA. James Dunning, CEO tel:

COMPRESSORS WITH SIDE STREAM

Centrifugal Pump Intro

Chapter 9 System Design Procedures

Delayed Coker Safe Sampling Tar or Spalled Coke

HYDRAULICS. H89.8D - Hydraulic Bench

PREVIEW COPY. Table of Contents. Basic Pumping Concepts...3. Maintaining Packing and Seals Lesson Three Maintaining Centrifugal Pumps...

Transcription:

Background PROVING THAT BLADDER SURGE TANKS CURED EXCESSIVE SURGE CONDITIONS IN A 30 FORCE MAIN Bo, P.E., Hazen and Sawyer, P.C. Sean FitzGerald, P.E., Hazen and Sawyer, P.C. The Sanitation District No. 1 of Northern Kentucky (SD1) provides wastewater collection and treatment for approximately 350,000 people in Campbell, Kenton, and Boone Counties. SD1 s system includes about 140 pump stations, 75 miles of force mains and about 1,500 feet of gravity sanitary sewers. The Lakeview Pump Station (PS) in Fort Wright, Kentucky, which was constructed in the mid 1970s, is a wet well-dry well PS with 8 centrifugal pumps (4 parallel sets of 2 pumps in series) with a combined pumping capacity of 21 MGD. The Lakeview force main (FM), which is primarily 30-inch-diameter prestressed concrete cylinder pipe (PCCP), is over 3 miles long. The system operates at pressures over 200 psi and was experiencing transient pressures (surge) up to 500 psi. Full vacuum conditions and subsequent vapor cavity collapse were also occurring in the higher portions of the FM (Figure 1) during surge events, which had routinely generated vibrations and noise at nearby homes resulting in customer complaints. In June 2009, a power outage at the PS created surge conditions that split a 14 gate valve in the PS (Figure 2), flooded the dry well and submerged the pumps and motors. Evaluation of the Problem To alleviate both the vapor cavity collapse and high-pressure surge conditions resulting from power outages and other emergency pump shutdowns as well as normal pump starts and stops, SD1 contracted with Hazen and Sawyer (H&S) to evaluate alternatives for a permanent solution. The evaluation included development and detailed calibration of a surge model using KYPipe s PIPE2008 Surge software. A unique feature of the calibration was the use of transient pressure recorders capable of capturing dynamic pressure readings up to 1,000 Hz during surge Page 1 of 6

events that may only last for a few milliseconds (Figure 3). Pressure recorders were placed at the PS and on the problematic section of the FM to monitor normal pump operation and emergency pump shutdown scenarios (Figures 4 & 5). The calibration yielded a good understanding of the root causes of transients in the system, including vapor cavity collapse in the FM. Once the model was developed and calibrated (Table 1), alternatives were evaluated to address transients at the PS and in the FM. These alternatives included installation of one or more bladder surge tanks at several locations in various combinations with pump control valves, fast-closing check valves, surge relief valve and/or combination air/vacuum valves. Implementation of the Solution Installation of two 7,500-gallon bladder surge tanks and four fast-closing check valves was selected as the most reliable, cost-effective solution to control surge conditions in the pump station and force main. Due to space constraints, the surge tanks were installed in a belowground vault (Figure 6) outside of the pump station. Various instrumentation and controls were installed to monitor operation of the surge tanks, protect the tank components, and monitor surge pressures. These devices were used during and subsequent to startup to assess the effectiveness of the improvements and to more precisely calibrate the surge model. H&S coordinated with the contractor, surge tank manufacturer and SD1 to conduct several rounds of startup testing and performance monitoring, which were completed in January 2011. The performance monitoring consisted of monitoring the flow rates from each pump set, water levels in the two bladder surge tanks, and transient pressures at multiple locations in the PS and on the FM. The data were analyzed and compared to pre-construction conditions and to the specified design criteria and performance conditions. Results showed successful control of pressures in the FM (Figure 7) and dramatic improvement in the PS (Figure 8). However, under pump trip conditions, check valve slam was resulting in pressure spikes in the PS that exceeded Page 2 of 6

the specified performance criteria. Thus, the project team coordinated with the manufacturers of the surge tanks and check valves to make modifications to the check valves that resulted in a significant reduction of these pressure spikes. Further operational adjustments brought the surge pressures within the specified limits even under worst-case conditions (Figure 9). The refined surge model that resulted from this effort has been used to evaluate alternatives for future PS and FM upgrades. The primary transient pressure monitor and other instrumentation at the PS will remain for long-term performance evaluation, and the data collected during the first year will be used as a baseline against which to evaluate future system performance. SD1 will continue to monitor operating data so that any problems can be promptly identified and addressed to ensure long-term reliability of the improvements. Conclusion This project demonstrates a successful approach to implementing and evaluating the effectiveness of surge improvements in an existing pumping system. It teaches important lessons on the implementation of surge improvements, including the value of performance monitoring and the importance of coordination among the owner, engineer, and equipment manufacturers throughout design and construction. This paper will discuss the following topics: Surge model calibration, including modeling challenges and limitations Design considerations for use of bladder surge tanks and check valves to control surge Performance monitoring procedures, results and subsequent equipment modifications Comparison of pre- and post-construction surge conditions Comparison of post-construction surge conditions to model-predicted surge conditions Evaluation of equipment performance vs. manufacturers literature & specified criteria Challenges and lessons learned from the project. Through the successes and lessons learned from this project, participants will gain a better understanding of transient pressure concerns, surge attenuation, bladder surge tanks, and transient pressure monitoring. Page 3 of 6

Figure 1. Lakeview Force Main Profile Figure 2. 14 Gate Valve at Lakeview Pump Station after June 2009 Surge Event Figure 3. TP-1 Transient Pressure Monitor Data Recording Functionality (Courtesy of Pipetech International) Figure 4. Pump Station Pressure Monitoring of 1 Pump Set Trip Prior to Construction Page 4 of 6

Figure 5. Force Main Pressure Monitoring of 1 Pump Set Trip Prior to Construction Table 1. Surge Model Calibration Results Figure 6. Installation of Bladder Surge Tanks in Vault Page 5 of 6

Figure 7. Force Main Pressure Monitoring of 1 Pump Set Trip with Surge Tanks In Service Figure 8. Pump Station Pressure Monitoring of 1 Pump Set Trip with Surge Tanks in Service Figure 9. Pump Station Pressure Monitoring of 4 Pump Sets Trip with Surge Tanks in Service, After Additional Modifications Page 6 of 6