Options for Permitting Street or Intersection Murals on Local Streets. Public Works and Infrastructure Committee

Similar documents
Public Works and Infrastructure Committee. General Manager, Transportation Services

Borough of Danville, PA Traffic Calming Program Guidelines

REPORT TO MAYOR AND COUNCIL

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

5 AUTOMATED SPEED ENFORCEMENT PROPOSAL

Shifting Gears for a Healthier City

Bloor Street Design Feasibility Study and Bike Lane Pilot Project. Public Works and Infrastructure Committee

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council May 9, 2017

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Ottewell Traffic Shortcutting Pilot Project

Public Information Centre

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Tonight is for you. Learn everything you can. Share all your ideas.

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council December 12, 2017

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017

WELCOME Public Information Centre

Increased Penalties for Red-Light Running Offences

Review of Considerations and Requirements for Automated Enforcement

5 Transit & Traffic. Overview

Installation of Traffic Signals and Pedestrian Crossings

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Dowling/Beaty Cycling Route

Item No Transportation Standing Committee June 23, 2016

County of Spartanburg South Carolina

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

TRAFF IC CALMING POLICY

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Public Works and Infrastructure Committee. General Manager, Transportation Services

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue

TRAFFIC CALMING POLICY NEWTOWN TOWNSHIP DELAWARE COUNTY, PA

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

POLICY: TRAFFIC CALMING

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Corporate Report. Recommendation

Transportation Impacts: Toronto York Spadina Subway Extension

PROVINCIAL MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS AMENDMENTS 2018 RECOMMENDATION

Ormsby Place Traffic Calming Pilot Project

STAFF REPORT ACTION REQUIRED. Public Works and Infrastructure Committee. General Manager, Transportation Services

122 Avenue: 107 Street to Fort Road

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Malvern Borough Local Traffic Calming

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Traffic Safety Advisory Committee - Proposed 2015 Initiatives

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Traffic Calming Policy

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

REPORT. Engineering and Construction Department

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

TOWN OF PAYSON TRAFFIC CALMING MANUAL

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

Pedestrian Crossing Guidelines 2016

Welcome! San Jose Avenue Open House August 25, 2015

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

MSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards.

CITY OF KINGSTON INFORMATION REPORT TO ENVIRONMENT, INFRASTRUCTURE & TRANSPORTATION POLICIES COMMITTEE Report No.: EITP

Chapter 5. Complete Streets and Walkable Communities.

Item No Halifax Regional Council July 19, 2016

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 25, 2016

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

Building sidewalks on local streets to reduce accessibility barriers

Massey Place Neighbourhood Traffic Review

FEASIBILITY REPORT ON RED LIGHT CAMERAS PLACED AT CENTRAL AVENUE AND H STREET.

Construction Staging Area Vaughan Road

Bicycle Friendly Streets

Traffic Design Requirements for Road Murals

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

Edenbrook Hill Drive Traffic Calming Study

ST. GEORGE STREET REVITALIZATION: ROAD DIETS IN TORONTO

Traffic Calming Policy

Improve the livability of our streets by

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

The following recommendation of the Committee of Council Meeting of March 20, was approved by Council on March 27,201 3:

21. CHRISTCHURCH CYCLE LANES: PROPOSED COLOURED SURFACING CHANGE

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Canadian Association of Chiefs of Police Association canadienne des chefs de police

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

City of Darlington Beautification Report

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Township of Springwater

Transcription:

STAFF REPORT ACTION REQUIRED PW10.1 Options for Permitting Street or Intersection Murals on Local Streets Date: October 22, 2015 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Ward 36 Reference Number: p:\2015\clusterb\tra\pr\pw15007pr SUMMARY In July 2015, City staff were directed to examine the implications of a potential new Street Mural program, whereby local residents are granted permission to paint murals on the asphalt road surface of city streets. City Staff have investigated these projects in other cities, reviewed potential requirements in the City of Toronto, and do not recommend pursuing a new Street Mural program at this time. While street murals do offer a community-building impact, they place considerable administrative, regulatory, and maintenance burdens on the City. Based on case study research, street murals provide no tangible traffic safety benefits. City staff instead propose that during community road closures with appropriate approvals, communities are free to create temporary street murals with chalk or other materials that are naturally removed by the elements. This approach would provide community building impacts at no cost to the City and essentially no added risk to motorists or the artists. RECOMMENDATIONS The General Manager, Transportation Services recommends that: 1. The Public Works and Infrastructure Committee receive this report for information. Staff report for action on Street Murals 1

Financial Impact There are no financial impacts associated with this recommendation in this report. The Deputy City Manager and Chief Financial Officer has reviewed this report and agrees with the financial impact statement. DECISION HISTORY City Council on July 7, 8 and 9, 2015, adopted the following: 1. City Council direct the General Manager, Transportation Services to report back to Public Works and Infrastructure Committee in the fourth quarter of 2015 on a process to permit community groups to install "street or intersection murals" on local streets, including the benefits to communities, any traffic impacts, and staffing and other cost implications for such a program. http://app.toronto.ca/tmmis/viewagendaitemhistory.do?item=2015.mm8.14 ISSUE BACKGROUND Street murals are citizen-led projects, found in some cities in North America, where local roads are painted with community art. Started in Portland, Oregon more than 20 years ago, these projects have been created in Minneapolis, Vancouver, Halifax, Kitchener, and Ottawa, among others. Street murals are large murals painted directly onto the asphalt road surface by community groups and organizations. They serve as community engagement activities to bring neighbours together with the stated goal of street beautification. They are considered a simple grassroots form of place-making resulting in a temporary aesthetic transformation of a street or intersection. Street murals are often painted during street parties and festival closures to encourage participation. In cities like Portland with longstanding programs, murals are repainted every year as part of annual street parties. The City of Toronto does not currently permit any paintings on the public right-of-way by public or private parties. In June 2015 in conjunction with an annual street party in which the street was closed, the Regal Heights Neighbourhood Association painted a street mural, similar to those found in other cities, along Springmount Avenue, south of Rosemount. This mural was painted on a public right-of-way without permission. Refer to Attachment 1 for images of this street mural. Staff report for action on Street Murals 2

COMMENTS Traffic Implications Street murals are almost exclusively installed on local roads with low traffic volumes. As of yet, there is no evidence from other cities that street murals improve or reduce traffic safety. While many neighbourhoods, community groups, and citizens report an increased sense of safety and a perceived reduction in vehicular speeds, there is also some concern that murals painted on the roadway may distract or confuse drivers. At this, time there is no evidence to suggest there is a real measurable impact, positive or negative. Of the cities researched and contacted, only Ottawa reported any reduction in speed (4km/hour reduction of speed). This, however, was measured one week after installation, making it difficult to determine if the reduction was a result of the novelty of the mural or if the change would be longer lasting. Newer installations will be studied over time by governing municipalities, but long-term observations have yet to be recorded. Therefore, the perception of increased safety that some residents claim cannot be substantiated by evidence, and the promotion of street murals as a mechanism to enhance road safety and slow down traffic may not be accurate. Staffing, Costs, and Administration Any program to allow community groups to install street murals would need to be regulated and monitored by the City due to the risk the artwork could distract or confuse drivers, and that the paint materials used could reduce vehicle traction on the road surface. A street mural pilot would require considerable resources for the City of Toronto to develop and administer as a completely new program of work, including a multi-step application process. The City would need to assess the proposed location and determine if the mural would be a potential hazard to traffic safety. This would include a site visit and a requirement to collect vehicle counts. All applications would need to be reviewed and revised by City staff to ensure the artwork does not distract or confuse road users, is appropriate for a neighbourhood and of high artistic integrity, and that the roadway is closed while the artists are on the street installing the mural. To ensure local neighbourhood support, the applicant would need to conduct some form of community consultations and collect signatures from residents within a given (to be determined) distance from the proposed location. Transportation Services staff would also need to monitor the vehicle speeds before installation and up to 12 months after installation to ensure there are no negative impacts on traffic safety. The City already administers community art projects, such as the StreetARToronto Program which addresses chronic graffiti issues on public-facing buildings and beautifies neighbourhoods with artwork. Unlike the proposed local street murals which would be located on low volume roads, StreetARToronto projects are located to the extent possible Staff report for action on Street Murals 3

in highly visible areas where a proposed lifespan of 15 years is considered appropriate. It is questionable whether localized street murals provide the same overall civic value to the City. Maintenance Street mural paint often fades after one or two years which leaves the street with an unattractive eyesore. Utility repairs in the street often require sections of asphalt to be dug up which could result in patches of the mural being removed. Ensuring maintenance so that street murals would continue to be a positive influence would require a commitment by the community that may not be sustainable. Therefore, the burden would then be placed on the City for any improvement or removal should it fade or fall into disrepair that would distract staff from well-established and existing programs. CONTACT Randy McLean, Manager Beautiful Streets Transportation Services Tel: 416-392-4628 Email: RMclean@toronto.ca SIGNATURE Stephen M. Buckley General Manager, Transportation Services ATTACHMENTS Attachment 1: Street Mural Images Staff report for action on Street Murals 4

Attachment 1: Street Mural Images Staff report for action on Street Murals 5