Telco Antennas SWMS Working At Height Above 2m

Similar documents
Risk Assessment Form

Prevention of Falls and Working at Heights

Safe Work Method Statement

To comply with the OHS Act, the responsible manager must carry out and document the following:

Accident/Incident Reporting and Investigation Procedures

Work Health and Safety Risk Management Procedures

Risk Assessment Form

HAZARD MANAGEMENT PROCEDURE

Conducting An Effective. Welcome!

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safe Work Method Statement (SWMS)

HS329 Risk Management Procedure

Hazard Management Making your workplace safer

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

WORK METHOD STATEMENT STRUCTURAL STEEL

Occupational Health & Safety

STFC QUANTITATIVE RISK ASSESSMENT PRO-FORMA

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

HAZARD IDENTIFICATION & RISK ASSESSMENT

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Risk Assessment Form

TLILIC2001 Licence to Operate a Forklift Truck

HAZARD RECOGNITION EVALUATION and CONTROL

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

CAMS Safety 1 st. Risk Management. Understanding and completing Targeted Risk Assessments (TRA)

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

CONTRACTOR SAFETY INDUCTION HANDBOOK

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS

Building 9 Roof Safety Assessment

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

OPERATIONL RISK ASSESSMENTS

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

SAFE WORK METHOD STATEMENT (SWMS)

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

Safe Work Method Statement

Important Safety Information Enclosed

Working at Heights Training Checklist (Ontario Version)

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

SAFE WORK METHOD STATEMENT

Hazard Assessment & Control. Faculty of Veterinary Medicine

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

HAZARD RECOGNITION EVALUATION & CONTROL. Procedure No. HR-405-PR-2 Division Human Resources. Supersedes n/a Board Policy Ref.

LADDERS FIXED AND PORTABLE

Safe High Pressure Water Washing (HPWW) Requirement

Building 43 Roof Safety Assessment

Site-Specific Safety Plan

SAFE WORK METHOD STATEMENTS

SAFE WORK METHOD STATEMENT CARPENTER

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

FATAL AND SEVERE RISK PROGRAM

Accident /Incident/Injury Report & Investigation Form

Procedure: Work health and safety hazard management

SCHNEIDER AUTOMATIC CIRCUIT RECLOSER JOB SAFETY ANALYSIS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Hampstead Hill School Health and Safety Policy: Confined Spaces

Building 31A Roof Safety Assessment. UOW01628 Access Hatch from Second Floor Yes

Safe Work Method Statement

Document: APA HSE GP Tx Version: 0.01 Date: 04/03/2013 Review by: 26/03/2014 Page 1 of 11 pages

Pre-control risk estimate. Likelihood Risk

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

WORK METHOD STATEMENT ELECTRICAL

Contractor / Exhibitor Handbook

Working Alone Safety Program

Health and Safety Code of Practice. SCP38 Working at Height

Safe Use of Access Equipment

SAFE WORK METHOD STATEMENT 0003 (Perimeter and Balcony Fallguard) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

S31 Opening Statement Working at Height

Safety Risk Assessment Roofing Works / Surveying / Inspections

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

Supervisors guide for managing reported hazards and incident (HS714)

Recognition, Evaluation, and Control of Hazards

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

8. Fall Protection Procedures WAC

Hazard & Risk Management

Safe work method statements

COMPLETION OF PROCEDURE ASSESSMENT FORM (COSHH RELATED) GUIDANCE NOTES (Version 3)

IIUM EVENT SAFETY RISK ASSESSMENT

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

CHAPTER 10 FALL PROTECTION

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

RISK ASSESSMENT FORM Project / Work Description: Handling of furniture.

Project & Task Work Health and Safety Risk Management Procedure

SAFE WORK METHOD STATEMENT Part B

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Building 21 Roof Safety Assessment. Multi Story Building with large metal roof areas Exteral access required for window cleaning UOW01613

HEIGHT SAFETY IT S EVERYONE S BUSINESS

Transcription:

Telco Antennas SWMS Working At Height Above 2m A SWMS shall be developed for a task where the risk has been assessed as Medium or Higher Division: Date: SWMS No: (e.g. Installation, Engineering Workshop) Site Address: (e.g. Brisbane Head Office, Hemmant Fabrication Workshop) / / Work Activity: Plant and Equipment to be used: Competencies and Qualifications: Emergency planning required? Yes: No: Relevant legislation and/or guidance material: Telco Antennas - SWMS Working At Height Above 2m Version 1.4 Page 1 of 8

Step No. What are the tasks involved? 1. Elevated work platform (EWP) 2. Fall arrest equipment (safety harness) What are the Hazards? Falling from heights Falling from heights 3. Scaffolding Falling from heights 4. Ladders Falling from heights 5. Work design and PPE Falling objects Serious bodily harm Injury to the public Property damage Litigation or civil action Initial Risk Residual Risk What controls must be used? C L R C L R Only a competent person who has attended training and is appropriately certified to operate an EWP Whist working in the machine all persons must be attached at all times Until the platform is completely lowered it is forbidden for any person to exit the basket All persons that are to use fall arrest equipment are to be appropriately trained and competent to do so All fall arrest equipment is to be inspected with records kept by a competent person at least every 6 months Before use all fall arrest equipment is to be inspected for damage and general wear and tear Only a competent and ticketed person is to erect scaffolding All scaffolding is to be erected and dismantled as per: Australian Standards For all scaffolding erected the scaffolder is to supply a handover certificate which is to be kept on site until the scaffold has been dismantled Scaffolds are to be inspected by a competent person and records kept on site: Before first use and within every 30 days After alteration or repair After any event likely to effect the stability of the scaffold (e.g. storms or strong winds etc.) Only industrial or commercial ladders (no domestic) are to be used Ladders are to be placed at a slope of 4 (vertical) to 1 (horizontal) and appropriately tied off and secured The worksite is to be barricaded or fenced off to the public All hand tools are to be attached by a lanyard (nah or belt) to prevent tools and equipment being dropped If working off a scaffold, toe boards and handrails are to be fitted before work commences Who is responsible? Page 2 of 8

Step No. What are the tasks involved? 6. Monitoring of site controls What are the Hazards? Falling from heights Initial Risk Residual Risk What controls must be used? C L R C L R All harnesses and fall equipment is to be checked for damage and wear and tear before use All barricading and/or fencing is to be checked for appropriateness every morning before work commences All of the work crew are to be observant of the public and the exclusion zones to ensure effectiveness Regular workplace inspections are to be conducted by: OH&S Representative Supervisors Managers Who is responsible? This Safe Work Method Statement (SWMS) was prepared and reviewed by: Prepared by / Review Team Name: (Please print) Position: (Please print) Signature: Date Authorisation Declaration: I have checked this Safe Work Method Statement (SWMS) and confirm that it is authorised for use. Responsible Supervisor Name: Signature: Date Page 3 of 8

Work Activity Instruction/Training Record Declaration: I confirm that the persons listed below have reviewed and been given instruction in this Safe Work Method Statement (SWMS) and were given the opportunity to ask questions and clarify any areas of uncertainly. To be best of my knowledge these persons gained a full understanding of the work method and the required health and safety controls to be applied for this job. Responsible Supervisor Name: Signature: Date The following employees/contractors have reviewed and been given instruction in this Safe Work Method Statement (SWMS): Training Record Name: (Please Print) Position/Company: Employee/Contractor: Signature: Date: Page 4 of 8

To do a SWMS you: 1. Discuss with relevant employees, contractors and Health and Safety Representatives the tasks, associated hazards, risks and controls. 2. Write the work tasks in the sequence they will be done in the What are the tasks involved? column. 3. Write the hazards and risks for each work task in the What are the hazards? column. 4. Assess the hazards for the risk they present without any controls in place using the tables Risk Matrix 011-F06. Write the consequence in the C column, Likelihood in the L column and risk rating in the R column. This is the initial risk rating. 5. In the What controls must be used? column, select the hazard or risk and then work through the controls. Choose a control measure (and how it is to be used). Use the Hierarchy of Controls and Priority for Action tables in Risk Matrix 011-F06 to work out appropriate controls. 6. Re-assess the risk of each hazard after controls have been put in place and write it in the Final Risk column. This is the residual risk. NOTE you cannot start work until the residual risk is at least medium. 7. In the Who is Responsible column write in the initials of the person who will be responsible for that step. 8. The people who did the SWMS fill in the fields in the Prepared by/review Team section. 9. The SWMS is given to a supervisor responsible for the work who reviews and then fills in the fields the Authorisation section, including signing off the declaration. 10. Each team member is briefed on the SWMS before they start work. Ensure the team knows that work is to immediately stop if the SWMS is not being followed. 11. All persons involved in the task must write their details and sign in the Training Record section that they understand and agree to the control measures to be implemented before starting work. 12. The supervisor of the task must sign off that all persons involved in the task have been consulted in the development and implementation of control measures identified. 13. Observe work being carried out. If controls are not adequate, stop the work, review the SWMS, adjust as required and re-brief the team. 14. Keep this SWMS for the duration of the work. If the task is likely to be repeated in the future, consider writing a site Standard Operating Procedure. Page 5 of 8

TABLE 1: Qualitative Measurement of the Maximum Credible Outcome of an Event Value Description Impact 1 Incidental 2 Minor 3 Moderate 4 Major 5 Severe Health: Illness or effect with limited or no impact on ability to function and treatment is not necessary. Safety: Injury such as First Aid, usually dealt with in house. Environment: No discernable impact or measurable impairment on habitat, species or natural environment (air, water, land). Regulatory: No risk of punitive actions, and any intervention limited to an observation. Community/Reputation: Isolated complaint from a local individual. Health: Mild illness or health effect which requires some treatment and/or has some functional impairment but is usually easily medically manageable. Safety: One or more injuries which require treatment by a medical professional or as a hospital outpatient, but are not serious (e.g. no time lost). Environment: Localised and measurable short term impact on habitat, species or natural environment. Regulatory: Risk of punitive action unlikely, and any intervention limited to field report (or similar). Community/Reputation: Clustering of complaints, and risk of local media interest. Health: Illness or significant adverse health effect needing a high level of medical treatment or management. Safety: One or more injuries which are serious enough to result in lost time, non permanent disabling injuries, or overnight hospitalisation as an inpatient. Environment: Localised and measurable medium term impact on habitat, species or natural environment. Regulatory: Formal intervention, typically issuing of an Improvement Notice at a site, and unlikely to escalate if complied with. Fine up to AUD 100K (or equivalent) without criminal proceedings. Community/Reputation: Coordinated community concern at a local level, and limited local media coverage. Health: Illness or chronic exposure resulting in significant life impacting effects Safety: Minor permanent disabling injury e.g. loss of finger(s) or extended temporary impairment and/or hospitalisation. Environment: Extensive and measurable medium term impact on habitat, species, or natural environment. Regulatory: Formal, high level intervention (e.g. prohibition notice) at a site, and risk of further interventions at other sites. Significant fine or penalty likely for Corporate (greater than AUD 100K or equivalent). Community/Reputation: Community alarm at a regional level, and adverse and longer running local/regional media coverage. Health: Serious illness or chronic exposure resulting in fatality or significant life shortening effects. Safety: or significant permanently disabling injury e.g. blindness, loss of hand(s), quadriplegia. Environment: Destruction of important populations of habitat, species, or natural environment. Regulatory: Significant prosecution action, including risk to Company Officers. Community/Reputation: Widespread community unrest and/or adverse national/international media coverage. Page 6 of 8

TABLE 2: Qualitative Measurement of How Likely or Probable the Consequence will Occur Value Description Impact 5 Almost Certain The event is expected to occur several times a year at a site/local level. 4 Likely The event is expected at a site/local level in the foreseeable future (next few years) / Occurs within Telco more than once per year. 3 Possible The consequence is possible at a Telco workplace at some time in the foreseeable future (next 10 years) / Has happened at Telco in past 10 years / Occurs annually within the Industry. 2 Unlikely The consequence is possible at Telco / Has occurred in the Industry. 1 Rare The consequence is not expected at Telco / Has never been heard of in the Industry. TABLE 3: Qualitative Risk Matrix Levels of Risk Likelihood Consequence Incidental (1) Minor (2) Moderate (3) Major (4) Severe (5) Almost Certain (5) Likely (4) Possible (3) Unlikely (2) Rare (1) M H E E E M M H E E L M H H E L L M H H L L L M M Page 7 of 8

TABLE 4: Hierarchy of Control TABLE 5: Priority for Action Control Description/Example Risk Level Action 1. Elimination 1. Substitution 2. Isolation 3. Engineering 4. Administrative 5. Personal Protective Equipment (PPE) Is there a need to use the plant, process or substance that created the risk (e.g. using a cordless drill to eliminate tripping or snagging of a power lead or using CCTV to observe a silo being filled to eliminate climbing up a ladder to observe)? Can the hazardous item be substituted with another item that has less risk (e.g. using a scaffold rather than a ladder, using extra-low voltage <50 Volt for switchgear, package cement in 20kg bags rather than 40kg bags)? Can the hazard be isolated from the person (e.g. machine guards, sound enclosures, lagging on hot pipes)? Can the risk be minimised by isolating, enclosing or redesigning the plant, substance or process (e.g. machine guards, mechanical lifting aids, exhaust ventilation, relocation, trolleys or workstation design)? E.g. job rotation, SOP, training and signs. The least-desirable method which shall only be used in combination with other controls or if other controls are not suitable. Employees issued with PPE shall have it fitted correctly and be trained in its use and maintenance E - Extreme Risk H - High Risk M - Medium Risk L - Low Risk Note: In all cases risk must be reduced to as low as reasonably practicable (ALARP). Intolerable. Stop and seek specialist advice. Immediate interim risk reduction required. Long term risk reduction plan must be developed, approved by Divisional Management, and implemented.. Tolerability to be endorsed by management. Additional long term risk reduction required. If no further action can be reasonably taken, Divisional management (DMD/EGM) approval must be sought to continue the activity. Tolerable, provided risk is ALARP (As Low As Reasonably Practicable). Reasonable safeguards and management systems must be in place commensurate with risks. Tolerable and continual improvement required. Manage risk in accordance with agreed procedures, and seek to reduce risk over time. Page 8 of 8