LAND MANAGER UPDATES IMPLEMENTATION OF GREATER HOBART MOUNTAIN BIKE MASTER PLAN MARCH 2014

Similar documents
WELLINGTON PARK BIKE STRATEGY 2005

LIKE THE NEW BMX TRACKS?

COMPETITOR INFO PACK. Page 1

2026 Olympic and Paralympic Winter Games Bid Book Overview

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015

QLDC Council 29 October Report for Agenda Item: 3

TASMANIAN MOUNTAIN BIKE PLAN

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Regional Cycle Programme Update

Regional Cycling Plan

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

Operational Policy. Queensland Parks and Wildlife Service. Mountain biking in QPWS managed areas. Visitor Management. 1 Purpose

Tasmanian Mountain Bike Plan

Kelowna On the Move. Pedestrian and Bicycle Master Plan

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

Harcourt Mountain Bike Park Proposal Scoping Study and Reference Framework May. Appendix 1. Harcourt Mountain Bike Park Master Plan 2014.

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

THE FIRST MOUNTAIN BIKE TRAIL CENTRE IN THE GCC & MIDDLE EAST

Tonight is for you. Learn everything you can. Share all your ideas.

Bus and Transit Lane Review Update

(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..

CITY OF ELKO BICYCLE AND PATHWAY PLAN

Bike Walk Marlborough Trust. Operational Plan Above: Wither Hills Farm Park

Special Event: IRONMAN Triathlon 2016

9. APPENDICES Disciplines of Mountain Biking

750M SWIM THEN 15KM MTB AND 6KM TRAIL RUN

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Washington County, Oregon

Implementing Active Transportation (AT) Facilities in Small Communities

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

6.1 Infrastructure and Safety

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

5. Pedestrian System. Accomplishments Over the Past Five Years

1. In Reach 3, Perry, Knox, Lowell, and Hooker have crossings identified. What are these?

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

Bicycle Queensland s Brisbane Council Election Priorities

Developing a programme to make Taranaki predator-free

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

John Fisher. Title. President - DMBA. Project Manager Dagmar North Trails

Purpose. Process. Recommendations

Guide to travelling to and around Panmure April 2013

Shifting Gears for a Healthier City

Ft. Tuthill Bike Park. design proposal

2. THAT the construction of a Dirt Jump Bike Park within Gladwin Park as referenced in Report No. PRC , be approved; and

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads

REGIONAL MUNICIPALITY OF WOOD BUFFALO BIKE PARK OPEN HOUSE. RMWB BIKE PARK IBI Group NOVEMBER 7, 2013

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

City of Perth Cycle Plan 2029

MASTER PLAN October 2017

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Stakeholder Communication and Public Involvement Plan

Final Sidewalk Feasibility Study

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

TRAFFIC CALMING REVIEW DAIMLER DRIVE INFORMATION PACKAGE AND PUBLIC COMMENT FORM

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

Cycling for the Future A Fresh Approach for WA

Delivering the. Strategy 7.0

FAQ s Walsh Road / Ferguson Road Pilot Scheme

Hurunui Trails Trust Strategic Plan to 2020

Item No Halifax Regional Council August 2, 2016

Garden City Community Park - Bike Terrain Park Consultation Process

Citizen Advisory Committee Meeting. November 15, 2011 MPRB Headquarters- 6:30-8:30 p.m.

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

2. Context. Existing framework. The context. The challenge. Transport Strategy

2017 Florida Commuter Transportation Summit

Mount Pleasant Skateboard Facility. April 27, 2015

Waitakere Recreational Cycling Plan NZRA Presentation

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Bulwell Cycling Consultation

Georgetown Skate Park & Action Sports Needs Assessment Project Background

EXECUTIVE SUMMARY. Vision

TOWN OF PARADISE VALLEY

SEASONAL POOLS REVIEW AND STRATEGY

BIKE PLAN CONTENTS GATEWAY

Terwillegar Drive Expressway Draft Concept Plan

INTERNATIONAL SPECIFICATION FOR MOUNTAIN BIKE ORIENTEERING MAPS

Active Transportation Rail to River Corridor. Community Meeting - Segment A

STAFF REPORT. Meeting Date: March 1, 2017 Agenda Item 5B

Report to COUNCIL for decision

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

City of Kingston Report to Council Report Number

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS

WHITIANGA HAHEI PURANGI ESTUARY

Welcome! Public Open House on UBC s Transportation Plan

CLIMATE ACTION PLAN PROGRESS UPDATE. Climate Action Program APRIL, 2018

CITY OF ROCK HILL, SOUTH CAROLINA. Neighborhood Traffic Calming Program A Policy for Use of Traffic Calming on Local (Residential) Streets

EVERGREEN VISION 2020:

Trail Notes Local Mountain Bike Areas

Living Streets Policy

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Pah Rah Mountain Range

Please refer to the PMBIA manual, pages 48-77, for more detail on the following sections:

Transcription:

LAND MANAGER UPDATES IMPLEMENTATION OF GREATER HOBART MOUNTAIN BIKE MASTER PLAN MARCH 2014 City of Hobart (CoH) Immediate works Radfords Track CoH has completed work to tighten up some sections and help passively manage straight-line speed on this trail. Log and rock chicanes were installed from late January to mid February 2014. New signage to assist in managing the risks of shared use will be installed by the end of March 2014. Radfords Track chicane 1 Tip Top Track Construction of the Tip Top Track began on 19 Feb. The first of 3 volunteer trackwork activities will be held on March 15 th. Two others are scheduled for April 12 and May 10. TipTop Track volunteers at work

Strickland Falls link CoH is hoping to pursue the missing link between Rivulet Track to Middle Island Fire Trail however budget was not provided for this project in 14/15. Hoping to pursue in 15/16 Chalet Downhill Track. Planning works are currently on hold whilst a number of heritage challenges are clarified with the WPMT. Middle Track (Radfords Track to Reservoir Trail) CoH has funding provided in the 14/15 budget to undertake works to tighten up some sections and help passively manage straight-line speed on this trail, and improve drainage. This depends on the WPMT doing its social values assessment, and providing a Works Permit. If the social values assessment is not done soon, Council will not be able to begin this work and the funding will be diverted to other projects. Fern Tree Park to Pillinger Drive CoH has funding provided in the 14/15 budget to undertake works which will tighten up some sections and help passively manage straight-line speed on this trail, andimprove drainage. This depends on the WPMT doing its social values assessment, and providing a Works Permit. If the social values assessment is not done soon, Council will not be able to begin this work and the funding will be diverted to other projects. S56 CoH has funding provided in the 14/15 budget to undertake work to repair and formalise this track. This will now require a Planning Permit from the Council. CoH Track upgrade works completed Knocklofty Reserve Summit loop new track section built on the summit loop in Knocklofty Reserve to provide for shared use New Knocklofty Summit loop section ready for shared use Huon Rd Waterworks track chicanes installed

Huon Rd - Waterworks track chicanes installed Pipeline track from Halls Saddle McDermotts Saddle signage New Shared use section on Pipeline from Halls Saddle McDermotts Saddle Kingborough Council (KC) Kingborough MTB Park there has been no further work at the MTB park. Council is aware of some simple maintenance requirements, however these are yet to be done. We have been unsuccessful in obtaining funds to build Stage 2. Alum Cliffs Track - Although the Alum Cliffs Track signage says that it is not a bike trail, there are no actual by laws/council decisions that have brought this on. It is just signage. Council have recently completed the short (but steep) section of the trail from the Taronga Rd end of the track to the Shot tower carpark. This link presents an opportunity to develop the track into a shared use track that has benefits as a commuting route as well as a recreational route. The Greater Hobart MTB Masterplan recommends that investigations be made into the development of the Alum Cliffs Trail into a shared use trail. An option is to identify areas which can be modified for bikes and undertake a trial. The trail has the potential for family rides and a commuting route line of sight is the main issue. The Steering Group expressed interest in exploring the issues and opportunities. Clarence City Council (CCC) Immediate works

Pilchers Hill - The Pilchers Hill Circuit Track will be upgraded. Clarence MTB Park Weed management is a priority Rosny Hill. The circuit track around Rosny Hill has been upgraded and completed. This is an easy beginner level track. A submission will be made in the CCC budget to improve the carparking area at the beginning of the track. Signage will be installed shortly. Planning works Pilchers Hill. A new track alignment in Pilchers Hill Reserve has been identified which would go from the Geilston Creek Circuit Track to the top of Pilchers Hill. A link track from Pilchers Hill Reserve to the Meehan Skyline has also been identified but will require negotiation with a landowner before the track can be constructed. Tangara Trail A Roscommon Recreation Plan is being developed which identifies new trail connections around the perimeter of Roscommon in Lauderdale which would provide improved links between Seven Mile Beach and Lauderdale. Subdivision applications in the Acton area may result in new trail connections to Mt Rumney and Belbins Road from the Tangara Trail in Acton Park. Signage is progressing on the Tangara Trail - drainage and realignment of some sections will be undertaken next financial year. Meehan Range An online survey has been carried out with 190 responses. Results are being collated for the Strategic Plan which is being coordinated by Dirt Art. A trail inventory is being done and a report will be prepared. From there concept trail alignments for extended mountain bike opportunities in the area will be developed and presented to stakeholders for feedback. Grass Tree Hill Rivulet Track an MTB track has been included in the Reserve Activity Plan. Glenorchy City Council (GCC) Immediate works Glenorchy MTB Park maps and signage signage and trail map for Glenorchy MTB Park should be completed before the end of June. Downloadable PDF map, link to Google map/google earth of trails, on ground signage of all trails, 3 recommended loop trails for beginner and intermediate riders. There is now a link available on the GCC website to an interactive map of the Glenorchy MTB park: http://www.gcc.tas.gov.au/content/glenorchy_mountain_bike_park.gcc?activeid= 1321

Glenorchy MTB Park signage to be replaced Upgrade of Knights trail to beginner/green circle standard. More work scheduled to improve erosion issues on Green Corps section of NS track, over the month of April. Riders are asked to take care on this section of track whilst the works are being undertaken. Wellington Park Management Trust (WPMT) West Wellington Multi Day Track economic feasibility study released. Further assessment of the recommendation for an Epic mountain bike track around Mt Wellington to be undertaken (due June 2014). Wellington Park Management Plan 2013 came into effect on 1 January 2014. HCC Works Permit request to convert a number of tracks in Wellington Park to multi-use. - No progress. Continued frustrations of the committee expressed over the lack of progress on these assessments by the WPMT considering the requests were submitted to them 2-years ago. The CoH has funding allocated to these projects which will be lost/redirected if no action is undertaken. Work on Radfords track to slow bike speeds almost complete Strickland Falls link and Chalet Downhill track no change Middle Track and Fern Tree Park to Pillinger Drive link no progress with social values assessment Ongoing monitoring of shared use and walking tracks one instance of a rider on a walking track (Cascade Track) detected since last meeting Illegal trackwork: Grays Fire Trail-Pipeline. Discovered a steep and hairy Freeride/DH track in November. HCC tracks unit closed it off end November Informal Tracks Upper Luge. Close-off works were gradually undone by users, mostly walkers, to the point that bikes were returning. Tracks unit went in again to reinstate close off in December.

Communications Strategy in development developing a communications plan to educate walkers and riders about Park values and to raise awareness of each other s activities, needs and wants. Aim is to increase compliance with regulations, ie. stop illegal track building and riding on walking tracks. Various strategies are being considered to help this happen, with ideas coming from talks with HCC planners and the tracks unit, riders and walkers.