INSTALLATION AND OPERATION INSTRUCTIONS

Similar documents
INSTALLATION AND OPERATION INSTRUCTIONS

Acid- Rite ph Adjustment System 2500 by Axiall, a Westlake Company

Vessel Installation and Operating Manual

Installation and Operating Manual

INSTALLATION INSTRUCTIONS Non-Pressurized Tank. Non-Pressurized Tank Part Number: AFCG1PT

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

PCS 340 Core Saturator : 115 Volt : 230 Volt. Instruction Manual

Accu-Tab PowerBase 3012AT by Axiall Corporation

Accu-Tab PowerBase 3140AT by Axiall Corporation

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

Accu-Tab Systems 2000 P Series by Axiall Corporation

GETZ EQUIPMENT INNOVATORS PART NO.: 9G59554 MODEL: MS 36 SC-R HYDROSTATIC TEST PUMP

Accu-Tab Systems 1000 Series by Axiall Corporation

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

Accu-Tab PowerBase 3070AT by Axiall Corporation

PENBERTHY SUBMERSIBLE AUTOMATIC SUMP DRAINER INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

MODEL 1329 Tank Gauge

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Installation of Your SprayMaster System

Advanced Fluid Handling Cart Owner s Manual

Installation and commissioning instructions 255 series and 256 series

KJ4000 Operating Instructions & Parts Manual NSN

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

BUTTERFLY VALVES Series 800

FLUSHMATE III FLUSHMATE FLUSHOMETER - TANK SYSTEM. Owner s Service Manual. 503 Series. 503 Series

Installation Instructions Air Compressor Part # 2780, 2781

OWNER S MANUAL INSTALLATION AND OPERATING INSTRUCTIONS REPAIR PARTS LIST

AWG Fittings LLC. Pressure Relief Valve Up to 250 PSI. Product Number Read this instruction manual before use.

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Cocoa Patio Pond with Lit Spillway

Operation Manual Air Saver Unit ASV5000 Series

FloWash. Industrial Filter Cart

Booster Pump PB4-60 Replacement Kits

HAYWARD FLOW CONTROL TFS SERIES FLOW METER INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

TOP VALVE. Pat. #5,857,486 & 5,944,050. High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves. Instruction Manual

INSTALLATION, CARE & USE MANUAL. EMASMB & LMASMB Surface Mount Bottle Filling Stations

FlashGARD HP Reverse Osmosis Filtration System Model Number FSTMO75 Part Number

Installation/Care/Use Manual

Owner's Manual THAWLINE BUBBLER DE-ICING SYSTEM

GREIG FILTERS, INC. OPERATION MANUAL

FLANGED TWO-PIECE BALL VALVES

Commercial Softeners. Installation, Operation & Maintenance Guide. Manual 002.1

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

ULTRA HIGH PRESSURE PAINT GRATE CLEANER FCT-JS OPERATION AND MAINTENANCE MANUAL

SDS -Series 4C-D201/-D202 Supplemental Drying System User s Manual

MODEL CALIBRATION GAS DELIVERY SYSTEM

FLANGED TWO-PIECE BALL VALVES

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

HP-104 & HP-106 Tapping Machine OPERATIONS MANUAL

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412)

RIX COMPRESSORS. MICROBOOST Owner s Manual CONFIGURATION A MB-115 MB-230. November 21, 2002 APPLICABILITY [ A]

Installation, Operation, and Maintenance Manual

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

1020 Industrial Drive, Orlinda, TN fax

FLUSHMATE FLUSHOMETER - TANK SYSTEM. 501-A Series. Owner s Service Manual. 501-A Series

3 Scotch-Weld Polyurethane Reactive Adhesive Applicator Replacement Part Installation Guide

Hygienic Bubble Trap Installation and Operations Manual

TactAir PCP Fill Kit/Adapter. Operation Manual

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

Please Do Not Return This Product To The Store!

Iron Filter Installation / Operation Manual

HAYWARD FLOW CONTROL Series PBV Back Pressure Valve and Series RPV Pressure Relief Valve INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS

Installation and Use Manual

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Electronic Control Pump Instruction Manual

FLANGED MULTI-PORT BALL VALVES

170-SJ Feed UnitTM 470-SJ Feed UnitTM

MB-SP Series Solvent Purification System

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

Electronic Control Pump Instruction Manual

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Duplex Commercial Softeners

BS Series Basket Strainer

Color/Catalyst Dispense Valves

PANACEA P125 USER MANUAL

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

TL-12 FLUSH TANK. Manual Ref. # MN-??? Polyurethane Machinery Corp. REVISION 1.0

Aqua Pilot Suction Pool Cleaner

HAYWARD FLOW CONTROL FLV SERIES, PVC/CPVC FILTER VESSEL INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Operating and Maintenance Instructions 3BA Regenerative Blowers

PANACEA P200 STAINLESS STEEL USER MANUAL

User s Guide. VetPro 5000 Wall / Cabinet & Table Mount Dental Delivery System. For Models: Rev L (11/10/15)

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

CSA Sample Draw Aspirator Adapter Operator s Manual

PoolNaturally. Pure. Simple. Genius. Installation and Product Use Instructions In ground and above ground pools

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

PURITY INSTALLATION INSTRUCTIONS MODEL P40

OPERATION / 3Z9305G 1:1 RATIO TRITON / Spray Packages / / / List of Models, page 2 / / / 100 psi (7 bar, 0.7 MPa) Maximum Working Pressure

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

Installation Instructions JATCO Environmental Protection Tank Model J-5000CX

OWNER S TECHNICAL MANUAL

MUELLER. Xp, & Lineseal 350 Butterfly Valves

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

1 Square = Foot/Feet Revision G 1/18/2013 Titan Controls

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

170-CG Feed Unit SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

6 & 8 Bubble Panel Installation Manual

Transcription:

"GEO-PULSE" THE HEART BEAT OF YOUR GEOTHERMAL SYSTEM This manual is to assist you in your installation and operation of your new "GEO-PULSE" geothermal pumping module. Read the manual thoroughly before you begin the installation or operation of the pumping module. The manual applies to the "GEO-PULSE" model GP19, GP29, GP16 and the GP26 pump models. Reference the following selection curves to determine which model is required for your system. SAFETY IS FIRST: Installing and operating a pump module requires a skilled person that is aware of the electrical and plumbing hazards that may arise. The system is under pressure and is controlled by electricity. A skilled or trained person must be on site and performing all aspects of the installation, service and operation of this pump module. All applicable laws and codes must be applied while using this pump module. WARRANTY: PG1 OF 2 This warranty is expressly in lieu of all other warranties, including but not limited to implied warranties of merchantability and fitness, and constitutes the only warranty of Geo-Systems USA with respect to the product(s). If within five years from date of purchase by Company of any item or product(s), Purchaser discovers that such item was not as warranted above and promptly notifies Company in writing thereof, Company shall remedy such nonconformance by, at Company's option, adjustment or repair or replacement of the item and any affected part of the product(s). Purchaser shall assume all responsibility and expense for removal, reinstallation, and freight in connection with the foregoing remedies. The same obligations and conditions shall extend to replacement parts furnished by Company hereunder. Company shall have the right of disposal of parts replaced by it. 1 P a g e

PRE-INSTALLATION INSTRUCTIONS Before installing the " Geo-Pulse" pump module, check the flow curves against t h e system flow and pressure drop characteristics to be sure the correct pump module is selected for your system. A one-pump "Geo-Pulse" pump module can typically accommodate the flow requirements of a unit up to 3 tons. A two-pump " Geo-Pulse" p u m p m o d u l e can typically accommodate t h e flow r e q u i r e m e n t of a unit 3 1/2- through 6-tons. Use the curves on page 1 to verify flow rates and "Geo-Pulse" pump module selection. The "Geo-Pulse" pump module must be located between the heat pump and the Geothermal loop field. Location of the "Geo-Pulse" should be selected based on ease of installation and it should be located in a place that is easy to get to for future service. As it is with all pumping systems, leaks may occur due to the wear or failure of the moving parts or improper installations. Therefore, care must be taken in the placement of the equipment so that flooring or surrounding facilities are not damaged by leaking equipment or leaking associated piping. The "Geo-Pulse" is used for circulating water/anti-freeze through the Heat Pump and the Geothermal loop field only. The "Geo-Pulse" pump module is not designed nor intended to be used for any other pumping purpose and cannot be used for any potable water or drinking water service. The "Geo-Pulse" vessel is never to be pressurized. The "Geo-Pulse" pump module may be used for flushing and purging the geothermal system but additional flow and pressure may be required based on the design of the system. If additional flow and pressure is required, reference the Geo-Systems USA flushing and purging manual for additional information, and the Geo-Systems USA flush and purge dolly product line. Caution 1) The Geo-Pulse pump modules are designed to be used with dedicated Geothermal loop fields only. Multiple Geo- Pulse pump modules on a single geothermal well field will cause a system failure and flooding of the pump module vessels. This is not an acceptable installation. 2) The Geo-Pulse pump module can be installed in configurations that have more than one heat pump on a common Geothermal loop field. The engineering of the pump module and the piping system will require the assistance of a professional geothermal designer and the possible need of additional control valves or control devices. Call Geo- Systems USA for assistance if this arrangement is required. 3) The Geo-Pulse pump module includes brass unions for the system fluid connections. The unions include "o" rings for the sealing method which needs to be hand tight only and then turn one quarter of a turn at most with a wrench. If the union is over tightened the piping below the union may become damaged which will cause a leak in the unit. This will not be covered under warrantee. WIRING: 1. The Geo-Pulse pumping module must be wired in accordance with all applicable national and local electrical codes. The electrical requirements for the pump motors are determined by the model number that was purchased. Before power is applied the electrician must determine what voltage is required by the model number that was purchased. 2. The pump modules may be wired to any controlling source that allows the pumps to pump fluid freely without stoppage. If a control system is installed that incorporates a solenoid or control valve, the valve must be wired to open at the same time that the pump module is started. 3. NOTE: The WSHP will not operate unless the pump module is flowing fluid at the same time as the WSHP is operating. 2 P a g e

INSTALLATION INSTRUCTIONS PIPING: The Geo-Pulse pumping module can be installed, using several different piping configurations. Refer the following drawings for a successful installation. Figure #1 NO NOTE: 1. EXAMPLE INSTALLATION ONLY- CONSULT WITH HEAT PUMP MANUFACTURER FOR ROUTING, SIZING AND LINE CONNECTION INSTRUCTIONS. 3 P a g e

Figure #2 " GEO-PULSE " NOTE: 1. EXAMPLE INSTALLATION ONLY- CONSULT WITH HEAT PUMP MANUFACTURER FOR ROUTING, SIZING AND LINE CONNECTION INSTRUCTIONS. 4 P a g e

FILLING, FLUSHING AND PURGING WITH THE GEO-PULSE: 1. The Geo-Pulse pump module may be used for flushing and purging the geothermal system but additional flow and pressure may be required based on the design of the system. If additional flow and pressure is required, reference the Geo-Systems USA flushing and purging manual for additional information. 2. Unscrew lid on Geo-Pulse Vessel and fill vessel with clean potable water. The vessel should be kept full at a level of 4" from the top at all times. 3. Ensure that both the suction and discharge ball valves on the pumps are in the open position (handle pointing up on top valve and down on bottom valve) 4. Remove venting screw on the face of the Grundfos pump(s) and rotate the motor shaft with a small screwdriver to vent the air out of the pump/motor and to lubricate the motor bearings. When water is visible at the venting screw opening replace venting screw. 5. Install the Geo-Systems USA "Pulse-Flow" flushing tool into the "Geo-Pulse" with the 100mesh filter bag firmly attached. The filter bag will collect all of the debris that is flushed out of the loop or well field. The clear tubing of the "Pulse-Flow" flushing tool must stay inside the vessel during the flushing and purging process. Note: There must be sufficient amount of clean potable water on stand- by (via water hose) to continue to refill the vessel as water is being pumped into the system to fill each well or loop. Do not allow the vessel to run dry during this process or step #4 will need to be repeated each time that happens. 6. Close the isolation valves on the WSHP and open the by-pass valve as shown in the piping drawing (figure #1). If the wells or loops have individual isolation valves (ref. figure #1), open and flush/ purge one set at a time. 7. Start the pump(s) and add water through the open vessel top until a full stream of water is being returned from the well or loop field. Continue flowing water until no more air bubbles are visible in the vessel. Stop the pumps and remove and clean the filter bag. 8. After successfully filling, flushing and purging the well or loop field, open the isolation valves on the WSHP and close the by-pass valve. Leave the filter bag attached, start the pumps and allow them to run for at least 30 minutes which should remove any air or debris that was in the WSHP. Remove the flushing tool and the system is ready for normal operation. FILLING, FLUSHING AND PURGING WITH A FLUSH AND PURGE DOLLY: 1. Unscrew lid on Geo-Pulse Vessel and fill vessel with clean potable water. The vessel should be kept full at a level of 4" from the top at all times. 2. Ensure that both the suction and discharge ball valves on the pumps are in the open position (handle pointing up on top valve and down on bottom valve) 3. Remove venting screw on the face of the Grundfos pump(s) and rotate the motor shaft with a small screwdriver to vent the air out of the pump/motor and to lubricate the motor bearings. When water is visible at the venting screw opening replace venting screw. 5 P a g e

FILLING, FLUSHING AND PURGING WITH A FLUSH AND PURGE DOLLY, continued: 4. Close the isolation valves on the WSHP, open the Geo-Pulse by-pass valve and close the interior system isolation valves as shown on figure #2. If the wells or loops have individual isolation valves (ref. figure #2), open and flush/ purge one set at a time. 5. Connect the flush and purge dolly to the flush port valves as shown on the piping drawing figure #2. Fill the flush and purge dolly with clean potable water. Install the 100 mesh bag filter to the return nozzle on the flush and purge dolly. Connect the flush and purge dolly electrical cord to a reliable power source. Open the flush port valves as shown on figure #2. 6. Start the flush and purge pumping system and add water to the flush and purge drum until a full stream of water is being returned from that well or loop. Circulate that one loop until no air bubbles are visible in the flush and purge drum. Stop the pump and remove and clean the filter bag before beginning the same process on the next well or loop. 7. After the first well or loop is full and clean, isolate that well or loop and move to the next pair of well or loop isolation valves to fill, flush and purge that well or loop. Continue with this procedure until all wells or loops have been filled, flushed and purged. 8. After all of the wells or loops have been filled, flushed and purged, open all the well or loop field valves and circulate the entire system for 30 minutes using the flush and purge dolly pump to circulate the water. 9. Turn the flush and purge pump off, close the flush port valves, drain the flush and purge dolly and disconnect the power cord. 10. The well or loop field should now be flushed and purged if the instructions above have been followed correctly. The next step is to flush and purge the interior system piping and the WSHP. All of the valves should be in the proper position if the above instructions have been followed. 11. Install the Geo-Systems USA "Pulse-Flow" flushing tool into the "Geo-Pulse" with the 100mesh filter bag firmly attached. The filter bag will collect all of the debris that is flushed out of the WSHP and the interior piping. The clear tubing of the "Pulse-Flow" flushing tool must stay inside the vessel during the flushing and purging process. Note: There must be sufficient amount of clean potable water on stand- by (via water hose) to continue to refill the vessel as water is being pumped into the system and WSHP. Do not allow the vessel to run dry during this process or step # 3 will need to be repeated each time that happens. 12. Start the pump(s) and add water through the open vessel top until a full stream of water is being returned from the WSHP and interior piping. Continue flowing water until no air bubbles are visible in the vessel. Stop the pumps and remove and clean the filter bag. 13. Open the isolation valves on the WSHP and close the by-pass valve. Open the system isolation valves and the well/loop field valves. The system is ready for normal operation. 6 P a g e

START-UP PROCEDURE: 1. Check the flow of the "Geo-Pulse" through the systems via the Pulse Flow flow meter to ensure that correct flow is being supplied to the system. If incorrect flow is being supplied check the "Geo-Pulse" pump curves on page 1 to ensure that the correct model has been supplied for your system. If you have the correct model "Geo-Pulse" and you are not getting the correct flow through your system there must be an obstruction that is preventing correct water flow or there is still residual air in your system. Note: If the water level changes during a normal operating cycle, you must check for air in the system. The water level should stay the same, plus or minus 2", if the system has been purged correctly. If air is present in the system, repeat the flushing and purging procedures as stated above. 2. After you have achieved the required flow rate of your heat pump and all air has been purged from the system,the complete system is now ready for normal operation "Pulse Flow" Flushing tool "Pulse Flow" Flow Meter Flush and Purge Dolly GEO-SYSTEMS USA ***2435 DILLARD STREET, GRAND PRAIRIE, TEXAS 75051*** TOLL FREE 1-866-522-0396 PHONE 1-972-522-0396 THE HEART BEAT OF YOUR GEO-THERMAL SYSTEM "GEO-PULSE" 7 P a g e