David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

Similar documents
RE: Park Plaza Walgreens (P12-016)

9/21/2016 VIA . RE: The Knot (DR16-270)

11/28/2016 VIA

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

8/1/2018 VIA . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

10/30/2012 VIA

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

11/3/2017 VIA . RE: River Oaks Phase 2 (P17-051)

10/6/2014 VIA . RE: Design Review for Delta Shores Regional Commercial Center (P14-025)

RE: Natomas Landing (P99-091)

12/13/2018 VIA

City of Seattle Edward B. Murray, Mayor

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

CURBSIDE ACTIVITY DESIGN

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

5 CIRCULATION AND STREET DESIGN

Active Transportation Facility Glossary

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

What Is a Complete Street?

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

COMPLETE STREETS PLANNER S PORTFOLIO

Living Streets Policy

Omaha s Complete Streets Policy

5. RUNNINGWAY GUIDELINES

Complete Streets. Designing Streets for Everyone. Sarnia

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Health and the Built Environment Presentation to the Childhood Obesity Conference

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

complete streets design and construction standards public primer City of Edmonton

C C C


FONTAINE AVENUE STUDY Final Report

Columbia Pike Implementation Team (CPIT) Meeting

Streets. Safe for Pedestrians 20% 2nd 5,000. Are We People-Friendly?

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

This page intentionally left blank.

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Road Diets FDOT Process

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

3.1 TRAFFIC CALMING PROCESS SUMMARY

Report on Walkability Survey and Workshop for ZIP Code Hosted by the Oklahoma City-County Health Department April 13, 2013

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Bridges and Arizona Crossings

Physical Implications of Complete Streets Policies

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

MARTIN LUTHER KING JR. WAY

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

Long Island Rail Road Expansion Project Floral Park to Hicksville

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Executive Summary Route 30 Corridor Master Plan

San Jose Transportation Policy

REMOVE BARRIERS TO, ENCOURAGE CREATION OF AND PROVIDE GUIDELINES FOR SAFE ROUTES (ALL DISTRICTS)

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Chapter 3: Multi-Modal Circulation and Streetscapes

Appendix 3 Roadway and Bike/Ped Design Standards

This page intentionally left blank.

KEARNY MESA COMMUNITY PLAN UPDATE

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Arlington s Master Transportation Plan

Creating walkable, bikeable and transit-supportive communities in Halton

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

This chapter describes the proposed circulation system and transportation alternatives associated with

PennDOT Access Management Model Ordinances Training

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

SECTION 1 - TRAFFIC PLANNING

How to Develop a Pedestrian Safety Action Plan

Introduction. Using the Checklist. TDM-Supportive Development Design and Infrastructure Checklist Version 1.0 (30 June 2017) City of Ottawa

Prince George s County plans, policies, and projects

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

County of Spartanburg South Carolina

Classification Criteria

Bicycle Master Plan Goals, Strategies, and Policies

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

5 Circulation & Parking

Public Workshop #2. September 14, 2016

Transcription:

June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr. Hung: WALKSacramento has reviewed the routing for Fire Station 14 (DR16-128) and offer the following comments. The proposed fire station will replace the existing station on North C Street and provide improved public service in the River District and adjacent areas. The project site, located at the southeast corner of North N Street and Ahern Street, is within the North 16 th Street subarea of the River District Specific Plan which is planned to transition from light industrial and commercial to residential. There are three aspects of the project design on which we would like to comment. The first two, windows and trees, are aspects of the built environment design and we recommend a substantial change to resolve the issues. The third aspect that we ll comment upon is bike parking. The River District Specific Plan states The public safety of the River District can be improved by encouraging more eyes on the street than are available with current industrial uses which become vacant after work hours. The River District Specific Plan also includes Policy LU2e: Implement Crime Prevention Through Environmental Design (CPTED) standards to design and implement streetscapes and sites that promote safety and livability. However, the Fire Station 14 building design and site layout provide only a weak contribution to these design elements for reducing crime. Windows or balconies should provide direct views of the street for natural surveillance, a CPTED element, but only the north side of the proposed Fire Station 14 overlooking North B Street gets close to this. The apparatus bay doors when open will provide good views of the street and a connection between occupants and pedestrians, and there are windows in the Captains Room and Lobby that may function for natural surveillance, assuming the Captains Room windows are not covered by blinds and the Lobby has unobscured clear windows. The rest of the building has poor eyes on the street the west side has no windows or doors, the east side has three windows and a door behind an 8 -high brick wall plus two lobby windows and the lobby door. The south side has eleven windows and three apparatus bays doors, but they re over 150 feet from North A

Page 2 of 3 Street. The views onto 14 th Street and Ahern Street may be diminished by the wrought iron fencing, parking lot and landscaping. Additionally, the effectiveness of the lobby windows could be severely diminished by the potential public art that is proposed. The drawings for the north and east elevations show the public art covering the windows between about four feet above ground and the tops of the windows. Trees and landscaping are important to pedestrians and building occupants for the greenery and natural environment they provide in urbanized areas. Shade trees provide additional benefit by reducing heat island effects and reducing the generation and dispersion of air pollution. Every pedestrian walking by the project site can benefit from increased tree canopy, too, as they are shaded from direct sun. The River District Specific Plan recognizes this with Policy LU2b: Ensure a rich urban tree canopy to provide shade and natural cooling for pedestrians. The project narrative provided by the architect indicates that Police Department safety concerns require that all trees be planted within the security fence perimeter and that Fire Department operational concerns prevent trees from being planted along North B Street. The proposed project design allows for only a few shade trees about 75 feet out of the more than 550 feet of sidewalks on the project s north, east and south edges will be shaded when the trees reach their mature size. Another result of shade trees may be particularly beneficial to some of the pedestrians that currently frequent the project site area. The Sacramento Tree Foundation Greenprint project found that the amount of tree canopy coverage is associated with higher levels of social adhesion for adults and improved mental health for teens. The narrow parcel the project is trying to fit into leads to the lack of eyes on the street and very little sidewalk shading. In order to fit the two parking lots, two driveways and the building on the parcel, there s no setback on 14 th Street and the setback on Ahern Street varies from 7 to 15. With these small setbacks, the 24/7 occupancy and the private and semi-private uses of the fire station, it s extremely challenging to create eyes on the street. The narrow setbacks also make it infeasible to plant shade trees. It may be possible to resolve the eyes on the street and sidewalk shading issues by using a two-story structure slightly wider than the apparatus bays. Windows into private and semi-private spaces and balconies for outdoor uses such as eating and exercising would allow for extensive natural surveillance of the street. People on the street would be aware they re under observation, and while they could see people at windows or on the balconies, they wouldn t have views into the rooms. A narrower building would enable the setback distances to be large enough to plant shade trees that provide both shading of the sidewalks and the building s eastern side. The third aspect of the project design that s deficient is bike parking. The bike parking provided on the site consists of two small bike racks inside the perimeter security fence next to the entry driveway. There doesn t appear to be hardscape where the racks are located, nor is there a curb cut and sidewalk to the racks. Since the bike racks are likely to be used by firefighters that will be on duty at the station for extended periods of time, the bike parking should be in a protected area, either bike lockers or a room within the

Page 3 of 3 station building. Missing from the plan is bike parking for visitors to the station. There s no bike parking provided outside of the perimeter security fence and there s none provided near the lobby where visitors would enter. The minimal eyes on the street /natural surveillance, inadequate tree canopy, and lack of bike parking for visitors do not present a benefit to the neighborhood other than the location of fire department personnel and equipment. WALKSacramento recommends that serious consideration be given to revising the project design to include a two story building. WALKSacramento is working to support increased physical activity such as walking and bicycling in local neighborhoods as well as helping to create community environments that support walking and bicycling. The benefits include improved physical fitness, less motor vehicle traffic congestion, better air quality, and a stronger sense of cohesion and safety in local neighborhoods. Thank you for your consideration of these comments and recommendations. If you have questions or need additional information, please contact me at (916) 446-9255. Sincerely, Chris Holm Project Manager Attachment: Development Checklist for Biking and Walking

Page 1 of 3 DEVELOPMENT CHECKLIST for BIKING and WALKING Prepared by WALKSacramento and SABA (Sacramento Area Bicycle Advocates) September 2012 This checklist is provided to give an indication of design, engineering, and policy elements that we consider when reviewing development projects. POLICIES Walking and biking is a priority Adopted a policy to develop a full multi-modal and ADA accessible transportation system Project Review and Comment POLICY CONSIDERATIONS Pedestrian Master Plan Bicycle Master Plan Regional Blueprint Regional Blueprint Consistent General Plans Adopted Climate Action Plans Subdivision ordinances to support pedestrian and bicycle access and safety Zoning ordinance to support pedestrian and bicycle access and safety ENGINEERING SIDEWALKS & BIKELANES ON BOTH SIDES OF MAJOR ROADWAYS o Pedestrian Level of Service C or better on arterials o Bicycle Level of Service C or better on arterials SAFE CROSSINGS FOR PEDESTRIANS o every 300-600 feet on major arterials o well lit, marked crosswalks o audible signals & count-down signals o median refuge islands SPEED MANAGEMENT o Speed limits based on safety of pedestrians and bicyclists o Implement road diets where there is excess lane capacity STREET DESIGN STANDARDS o Maximize pedestrian and bicyclist safety o Sidewalks buffered by trees and landscaping on major arterials o Vertical curbs o 5 minimum sidewalk widths, 8 in front of schools o 6 minimum bike lanes on busy streets

Page 2 of 3 INTERSECTIONS o Median refuge islands for pedestrians o Signal timing to enable safe passage o Signal detection for bicyclists o Crossings on all 4 legs of intersections ELIMINATE BARRIERS o Freeway, railroad, river and creek crossings o Obstructions in sidewalks and bike lanes NEW DEVELOPMENT REQUIRE Walking & bicycling circulation plans for all new development Direct and convenient connections to activity centers, including schools, stores, parks, transit Mixed uses and other transit supporting uses within ¼ mile of light rail stations or bus stops with frequent service Minimum width streets Maximum block length of 400 4-lane maximum for arterials; Recommend 2 lanes wherever possible NEW DEVELOPMENT DISCOURAGE Cul-de-sacs (unless it includes bike/ped connections) Gated and/or walled communities Meandering sidewalks Inappropriate uses near transit (gas stations, drive-thru restaurants, mini storage and other auto dependent uses) BUILDINGS REQUIRE Direct access for pedestrians from the street Attractive and convenient stairways Bicycle parking long & short term Shower & clothing lockers OLDER NEIGHBORHOODS Improve street crossings Reduce speeds Provide new connections Create short cuts for walkers and bicyclists by purchase of properties or other means Provide sidewalks on both sides of major streets

Page 3 of 3 Policy Review and Comment ENFORCEMENT & MAINTENANCE Enforce speed limits Enforce crosswalk rules conduct crosswalk sting operations Enforce restrictions against parking on sidewalks Enforce bicycle rules including riding with traffic, lights at night, stopping at red lights Implement CVC 267 setting speed limits based on pedestrian and bicyclist safety Sweep streets and fix hazards Repair and replace broken sidewalks EDUCATION Train staff on pedestrian and bicycle facility design. Train development community about pedestrian and bicycle planning and safety issues Bicycle skills training FUNDING Include pedestrian and bicycle facilities in capital improvement programs Include pedestrian and bicycle facilities as a part of roadway widening and improvement projects Support Measure A pedestrian and bicycle facility allocation Set priorities based on safety and latent demand SACOG Community Design grants & Bike/Ped grants California Bicycle transportation Account Safe Routes to School WALKSacramento 909 12 th Street, Suite 203 Sacramento, CA 95814 (916) 446-9255 www.sacbike.org Sacramento Area Bicycle Advocates 909 12th Street, Suite 116 Sacramento, CA 95814 (916) 444-6600