Activity Hazard Analysis. Guidelines to Acceptance

Similar documents
Conducting An Effective. Welcome!

APPENDIX A. Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows

Required Courses. Total Hours 39

Job Hazard Analysis Form (JHA)

Omega Safety Training, Inc Hwy 6 North, Ste. 207 Houston, Texas Ph:

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

SPECIALIZED ONLINE TRAINING COURSE LIST

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

EM Section 12. Control of Hazardous Energy (Lockout/Tagout)

10-Hour OSHA Training

Lockout / Tag out Program

RESCUE TRAINING and SERVICES CONFINED SPACE HIGH ANGLE SURFACE MINES EXCAVATION/TRENCH ADVANCED RIGGING. Winter, D2000 Safety: Key Facts

Environmental Health and Safety 2018 Catalog CONTENT :: COMPLIANCE :: TECHNOLOGY

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

Health, Safety, Security and Environment

Take the high road to ensure underground safety.

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY

Hazardous Energy Control (Lockout-Tagout)

OSHA Compliance Saves Money, See How They Are Connected. Ryan S. Hellman, MS Principal EHS Consultant

LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout - Control of Hazardous Energy Program

Return the completed questionnaire, OSHA 300A Summary form and EMR Rating via e- mail.

SAFETY AND OSHA GUIDELINE CURRICULUM

Lock Out/Tag Out Control of Hazardous Energy

Committed to Providing Quality Safety Products and Services. Online Training

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

SAFETY AND RESCUE TRAINING FOR HIGH-HAZARD ENVIRONMENTS

Safe Work Method Statement

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Job Hazard Analysis

Lockout/Tagout - Energy Control Program

SAFETY TRAINING and SERVICES CONFINED SPACE FALL PROTECTION EXCAVATION FORKLIFTS SCAFFOLD. Rescue. Spring D2000 Safety: Key Facts

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

Lockout/Tagout Training Overview. Safety Fest 2013

Module: Permit to work System

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

LO/TO LOCKOUT/TAGOUT PROGRAM

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

Control of Hazardous Energy Lockout / Tagout Program

MIOSHA Administrative Requirements. Chad Ignatowski

Safety Essentials. Mandatory rules for our high risk activities

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Energy Control Procedures Lockout/Tagout 29 CFR

There is one Fact Sheet for each module presented in the course. They are easily printed either singly or collectively.

LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy Program (LOTO)

Suitability of Work Equipment

University of Arkansas Office of Environmental Health and Safety

Preventive Maintenance

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Safe Work Method Statement

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

Accident Investigation and Hazard Analysis

HAZARD RECOGNITION EVALUATION and CONTROL

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Risk Controls Proposed: (in hierarchy order from the most preferred control)

Facilities Management

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

LOCKOUT/TAGOUT PLAN August 2015

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

Recognition, Evaluation, and Control of Hazards

FALL PROTECTION PLAN INSTRUCTIONS

Entry Level Assessment Blueprint Fundamentals of Construction

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Site Safety Inspection Checklist

Control of Hazardous Energy Program (Lockout/Tagout)

Course Length: The course is four sessions for a total of 32 hours.

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

Self Inspection Checklist

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

230-LOCKOUT/TAGOUT PROGRAM

University College Dublin Machinery/Equipment Risk Assessment Template

SAFETY POLICY AND PROCEDURE MANUAL QUESTIONNAIRE

OSHA 30 Syllabus. Laborers Training School. Time: 40 hours. Maximum Class Size: 30. Prerequisites: None

Safe work method statements

Product Information Report Lockout/Tagout Hazardous Energy Control

Meet Today s Webinar Team

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

Hazardous Energy Control Lockout/Tagout

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

Lockout/Tagout Program

Lockout/Tagout Program

HEALTH AND SAFETY MANUAL

West Texas Safety Training Center

In This Document. OBJECTIVES Upon completion of this module, you should be able to:

9/7/2018. Introduction to the. Presenter. Disclaimer ADD PRESENTER PHOTO HERE. Richard A. Lantz, CVI, ASCS, VSMR

Activity Hazard Analysis (AHA) Activity/Work Task: New Ductwork Installation Overall Risk Assessment Code (RAC) (Use highest code) M

QUEENSLAND UNIVERSITY OF TECHNOLOGY

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

THE OSHA LOCK-OUT/TAG-OUT STANDARD

National Wireless Training Standard

SITE SAFETY PLAN AND NEW EMPLOYEE SAFETY ORIENTATION LOCATION: BROWN-MINNEAPOLIS TANK-SOUTHWEST (ALBUQUERQUE FABRICATION PLANT) REVISED:

Code of Practice and Instructions to Contractors Working for Viridor

University of Vermont Department of Physical Plant Burlington, Vermont

Lockout / Tagout Safety Program

SITE SAFETY PLAN AND NEW EMPLOYEE SAFETY ORIENTATION

Access Interactive Training Courses at Any Time

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Transcription:

Activity Hazard Analysis Guidelines to Acceptance

Operational Risk Management The AHA is a form of Operational Risk Management: Identify Hazards Assess Hazards make risk decisions Implement Controls Train Supervise

Operational Risk Management The intent of ORM is to reduce the overall risk in a phase of work. By requiring the contractor to commit to analyzing an activity - identifying the principal steps and the hazards associated with each; establishing hazard controls and training his/her workers; and, providing oversight to ensure AHA compliance - RISK will be significantly reduced.

Ten Guidelines To An Acceptable AHA The AHA shall be in the proper format. Each principal step of an activity shall be listed. The AHA must be activity specific. Competent/Qualified person is identified in the AHA. Quoting regulations as a step or hazard or hazard control is unacceptable. If hazardous material is used in activity the MSDS for that material must be listed. All hazard controls shall be adequate. Crane AHAs must have set-up/set-down hazards controlled. Training/Qualification/C ompetency training for the activity must be included in the AHA. Will this AHA reduce the overall Safety risk associated with this phase of work/dfow?

The AHA Shall be in proper format EM-385-1-1 (Nov 2003) figure 1-6 is the acceptable format for new contracts. It is the same AHA format required by the previous EM-385 edition. Each format requires the very minimum acceptable information adding more information and fields to the AHA is acceptable. The analyst s name shall be on the AHA Any competent/qualified persons associated with the work (scaffolding, excavation, electrical and so on) in the phase of work/dfow shall be identified in the AHA. All sections must be complete and the AHA shall reduce the overall hazard severity and risk of injury and property damage.

Principal Steps Principal steps are just that the principal steps in the phase of work/dfow. Principal steps does not include such things as: breaker bar, sawsall, hammer, forklift, excavator and so on this is equipment not principal steps. Principal steps can include: locate utilities, lockout circuit 1-B-3C, Excavate trench, erect scaffold, breakdown scaffold, Demo top floor and so on. Each step has its concomitant hazards that need mitigating/abatement. Remember the effect of the AHA is reduce risk. Each hazard must be addressed with a corresponding control

Hazard The following statements should aid identifying hazards: Danger of striking against, being struck by, or otherwise making injurious contact with an object; slip or trip; caught in, on, or between objects; fall on the same level or to another; strain by pushing, pulling or lifting; possibility of electrical, health or fire hazards; possibility of employee coming in contact with a hazardous chemical or substance; Past experiences.

Hazard Categories Struck By(SB) Struck Against(SA) Caught Between(CB) Contact With(CW) Caught On(CO) Contacted By(CBy) Caught In(CI) Falls on Same level(fs) Falls Below(FB) Overexertion(O) Exposure to Chemicals/Hazmat, noise, radiation(e) Each hazard associated with a Principle Step should fit into one of these Hazard Categories.

Recommended Controls Every hazard shall have a control design out the hazard; institute engineering controls (interlocks, alarms/strobes, shutdown mechanisms); substitution of alternate energy forms (pneumatic to electrical or vice versa) or less harmful hazardous materials; reduce the amount of energy used or released; place barricades/barriers/guards between the source of energy and the worker or property; modify contact surfaces (higher/lower friction); strengthen the surface or structure.

Equipment to be used ψ Drill motor ψ Gasoline power generator ψ Air compressor ψ Construction handtools ψ Pneumatic nailer ψ Powder actuated nailer ψ backhoe ψ Circular saw ψ Reciprocating saw ψ Carpeting handtools ψ Forklift ψ Frontloader ψ Personal fall arrest system ψ Trench shields Some are hand-tools some are not, but all can cause injury.

Inspection Requirements Personal fall arrest systems Cranes Forklifts Trenches/Excavations LOTO Project-Site Scaffolding Powered hand-tools All of these require a form of inspection. All at least require a daily inspection, prior to use. The inspections are conducted by a competent/authori zed person. Are inspections documented? Does site supervision ensure inspections are conducted?

Training Requirements Personal fall arrest systems Cranes Forklifts Trenches/Excavations LOTO Project-Site Scaffolding Powered hand-tools APP/AHA All of these these require training of the worker. Cranes, Forklifts require training and certification. The other items require specific training associated with the unique characteristics of the work activity. Is training documented?

When looking at the AHA, do you sense in your gut that the overall RISK has been reduced, or, do you feel the AHA was submitted to just fulfill a contract requirement. The AHA should drive the overall RISK down!

Summary The AHA is a form of ORM The contractor must submit an AHA that is complete and detailed to the extent of the complexity of the phase of work. It is not acceptable to quote regulations in the AHA regulations are in the APP and in the code books the AHA is very site and activity specific it is customized.

Summary (cont d.) principal steps, identified hazards, hazard controls, equipment used, inspections required, training provided are all components that will overall reduce the RISK of each phase of work analyzed. Accept only complete AHAs that address the hazards and reduce the overall risk of the phase of work.

Conclusion Over the next few months I will posting AHAs with the minimum required information that should be included in them for particular activities (e.g., Excavation/trenching: locates, soil type, competent person/qualified person, depth of ex/tr, length of ex/tr, how long will the ex/tr be open, what protection measures to protect the workers will be used if entry is required ) on the Safety website.