OFFSHORE WIND JAPAN & JAPANS FIRST SELF-PROPELLED JACK-UP

Similar documents
Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC

TRACK RECORD SEP. 2018

Experience with the design, manufacture, test and commercialisation of the REpower 6M turbine

REBO terminal. REBO terminal Energy Port Oostende. the ideal hub for offshore wind & heavy lift activities in the North Sea

Heron s Application for Wind Industry - Gorillas Need Not Apply

Wind Mills of the Mind Delivering large scale offshore wind. Andy Kinsella CEO, Offshore November 24th, 2011, Dundalk

Class contribution to US Offshore Wind Power industry

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

Offshore Wind Terminal WELCOME VERSION APRIL EMMANUEL TIMMERMANS BUSINESS DEVELPMENT MANAGER

US OFFSHORE WIND MARKET OVERVIEW NOVEMBER 2018/

REBO. wind terminal. Installation. Edition

TRACK RECORD FIRST MOVER. DEME: creating land for the future. Member of the DEME Group

Performance Record - Valve Remote Control System (Offshore)

A DECADE OF EXPERIENCE

Wind Turbine Installation Vessels

For Educational and Non-Profit Use Only!

Challenges of up-scaling to a grid connected array. PECC Energy Transition June Arturo Troncoso, Director CWE Chile

Unique Group employs over 450 people worldwide through its seven multi-site divisions: Survey Equipment. Marine & Subsea. Diving & Life Support

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Jacking Experts, the Key to your Rig Safety.

Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011

Japan s Floating Offshore Wind Projects

Tsunami Impact on the Fishing Industry. Koji Okumura Underwriter, Munich Re

The economic value of the EU shipping industry. Andrew P Goodwin

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017

Port Infrastructure to Support Floating Offshore Wind West Coast USA

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

Notice of operations at London Array Offshore Wind Farm

A2SEA corporate presentation. Søren Rønnow Poulsen Key Account Manager, Scandinacia & Baltic

TRACK RECORD. First Mover. Burbo Bank Ext. - Tristan Stedman

Pile Gripper Systems

Offshore exploration in the arctic Alain Wassink GustoMSC

That is why. April 24, 2008

Alstom Ocean Energy Path towards Industrailsation. Ken Street 18 th April 2013

in the PORT OF OOSTENDE Paul Gerard Managing Director

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Assessment and operation of Wind Turbine Installation Vessels.

INCREASE OPERATING DAYS ENHANCE DECK SAFETY AND SPEED MINIMIZE SEA SICKNESS HEAVY DUTY GYROSTABILIZERS FOR COMMERCIAL & DEFENCE APPLICATIONS

Tuesday 6 June 2017 Afternoon

Anchor operations for Jack-up barge in offshore wind farms during service Customers perspective

Fukushima Floating Offshore Wind Farm Demonstration Project ( Fukushima FORWARD )

WE INTRODUCE TO YOU. DCN Shipping, a part of the DCN group of companies

OPERATION & MAINTENANCE

Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE

Majuro Based Transhipment Industry Study. FFA Report 92/23

DONGE FLUSHING YARD. This combination of using and constructing equipment improves the quality of our products since 25 years.

PILING RIGS DRILLING RIGS

The Array cable installation vessel Stemat 82 and Assist tugs Lydia D and Claudia B are expected to commence installing array cables during week 5.

Tuesday 6 June 2017 Afternoon

The WindFloat Project. Hamburg, September 2016

Liquefied Natural Gas: Current Trends and Future Directions

N2 Membrane+ Nitrogen Production Systems for Offshore. Where you are. Where you need to be. We are here too.

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

CONCLUSIVE SUMMARY OF CARBON DIOXIDE

Notice to Mariners No 24 / 2017 Blyth Offshore Demonstrator Project 9 th September 2017

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

Fisheries sector comprised oceanic and coastal resources which are exploited at subsistence, artisanal and industrial levels

Seaflex SeaSerpent Overview Continuous Support for Cables.

Hydraulics and Maritime Research Centre, University College Cork, Pouladuff Road, Togher, Cork, Ireland

Carnegie Wave Energy Limited

Virginia Offshore Wind Advanced Technology Demonstration Program and Test Pad Sites

GAS TANKER COMMITTEE #4

Wind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US

Alaska Department of Environmental Conservation Non Crude Marine Vessels Group Mission

Shell Beaufort and Chukchi Sea Program Update

How To Enter Kushiro Port and Things To Be Aware of When Entering

Offshore Pipeline Installation SEABED INTERVENTION THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING HOW DO YOU MAKE THE SEABED?

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

With a team of highly qualified divers Vision offers a wide range of services including;

THE ROLE OF INSTALLATION AND SUPPORT VESSELS

SUPPLY OPERATIONS IN ICE CONDITIONS

SEA BREEZE Sea Breeze

Are All Floating Structures Vessels? Stephanie Showalter, J.D. Sea Grant Law Center University of Mississippi

Offshore Wind Energy in Germany Development and Outlook

Wave Energy Converters (WECs)

Report of the Committee to Study Offshore Wind Energy and the Development of Other Ocean Power Technology

HARBOR INFRASTRUCTURE INVENTORIES Harbor Beach Harbor, Michigan

Pacific Coast Groundfish Fishery Social Study: An Overview of Initial Theme Based Results

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Wave Energy. ME922/927 Wave energy

Fishery. Fishing vessels (Dept. of Finance)

The Failure of the Kamaishi Tsunami Protection Breakwater

Minimal Structures for Marginal Nova Scotia Developments

ATLANTIC MARINE. Atlantic Endeavour

Current Position in Thailand What CP is doing to tackle ethical issues in the Thai seafood supply chain

Cook Inlet pipeline crossing is about making the best choices

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Other vessel's involved in the Swale cable pull in and burial operations will be the multicat Wiltango, and the barges Wilcarry 300, & Wilcarry 342.

US Navy Wave Energy Test Site. Kaneohe, HI

ASX Announcement. May 4, Carnegie Wave All Energy Presentation

Human Factor Challenges in International Marine Contracting

THE CROATIAN MARITIME LAW ASSOCIATION RESPONSE TO THE CMI QUESTIONNAIRE ON VESSEL NOMENCLATURE (April 14, 2016)

Cargo Hold Cleaning Solution for Cement Clinker

Wind Turbine Shuttle. Ferdinand van Heerd

In Danger At Sea: Adventures Of New England Fishing Family By Samuel S. Cottle READ ONLINE

MSC Guidelines for Review of Gas Carrier Stability (Intact, Damaged, Lightship, and Special Loading Authorization)

Code of Practise for Deployment and Marking of Fishing Gear

OFFSHORE WIND: A CRASH COURSE

RA 500UW-LV - Case Histories

Transcription:

OFFSHORE WIND JAPAN & JAPANS FIRST SELF-PROPELLED JACK-UP HHWE NIEUWJAARSBIJEENKOMST, 19 JANUARI 2017 By: Jan-Mark Meeuwisse

OUR REFERENCES IN WIND No. Name Series Owner Year 1 WIND NG-600 DDB/Ziton 1995 2 Buzzard SEA-1250 GeoSea 1982 3 Vagant SEA-800 GeoSea 2002 4 Pauline SEA-900 Besix 2002 5 Wind Lift 1 NG-5300 Bard 2009 6 Goliath SEA-2000 GeoSea 2009 7 Sea Worker SEA-2000 A2SEA 2009 8 Seafox 7 SEA-2000 Workfox 2009 9 JB-114 SEA-2000 Jack-Up Barge BV 2010 10 JB-115 SEA-2000 Jack-Up Barge BV 2010 11 Seajacks Kraken NG-2500X Seajacks UK Ltd 2009 12 Seajacks Leviathan NG-2500X Seajacks UK Ltd 2009 13 GMS Endeavour NG-2500X GMS 2010 14 GMS Endurance NG-2500X GMS 2010 15 MPI Adventure NG-7500/6 MPI Offshore 2011 16 MPI Discovery NG-7500/6 MPI Offshore 2011 No. Name Series Owner Year 20 Seajacks Zaratan NG-5500C Seajacks Ltd 2012 21 Brave Tern NG-9000C Fred Olsen Windcarrier 2012 22 Bold Tern NG-9000C Fred Olsen Windcarrier 2012 23 Sea Installer NG-9000C A2SEA 2012 24 JB-118 SEA-3250 Jack-Up Barge 2013 25 Sea Challenger NG-9000C A2SEA 2014 26 Seajacks Scylla NG-14000X Seajacks UK Ltd 2015 27 GMS Shamal NG-1800X Gulf Marine Services 2015 28 GMS Scirocco NG-1800X Gulf Marine Services 2015 29 GMS Sharqi NG-1800X Gulf Marine Services 2016 30 Apollo NG-5500X GeoSea NV 2017 31 GMS Evolution NG-2500X Gulf Marine Services 2016 32 TYM Matsu NG-2500X Thong Yong Maritime 2017 33 TYM Baymax NG-1800X Thong Yong Maritime 2017 34 TYM Nemo NG-1800X Thong Yong Maritime 2018 35 Penta-Ocean NG-3750C Penta-Ocean Constr. 2018 17 JB-117 SEA-3250 Jack-Up Barge 2011 18 Neptune SEA-2500 GeoSea 2011 19 RIMA (Ex-Kuroshio) SEA-900 Besix 2011 GustoMSC - Proprietary and confidential information. Subjected to

NG-140000X FASTED INSTALLATION TWO 1,200T MONO PILES PER DAY WORLDS LARGEST SEAJACKS SCYLLA

OFFSHORE WIND IN JAPAN OFFSHORE WIND EXPERIENCE IN JAPAN Installed by a GustoMSC designed SEA-900

OFFSHORE WIND IN JAPAN OFFSHORE WIND PIPELINE Japan has a large potential for Offshore Wind Bottom funded has almost same amount of potential as Onshore wind Potential for floating offshore wind is 4 times bigger than Onshore Wind

HURDLES OFFSHORE WIND IN JAPAN BY JWPA OFFSHORE WIND IN JAPAN Small official target by Japanese Government (820MW). Lack of installation Jack-ups, and Base ports Cabotage / Labor restriction for foreign Jack-up vessels Long approval process (4 5 years) Moderate wind speed at offshore area Limited shallow water (20 50m) offshore area s Poor grid infrastructure at Hokkaido & Tohoku area Legal hurdles; Port Associated Area, Partially defined, permission term is too short General common sea No legal rules, who has the permission rights? Battle among parties (Fishermens rights, Decommissioning, etc.)

JAPAN GENERAL Don t try to sell something which they already have locally A paper model made by Shipyard Be there, often Use local Agent Understand the local culture Be prepared for many, many detailed questions being asked Pleasant working ethic's to follow Patience, patience and more patience First-timers; read the book Cultureshock!

LOCAL KNOWLEDGE NG means in Japan No Good! Our product name starts with NG (new generation) and has a different meaning in Japan.

PRESS RELEASE BY PENTA-OCEAN JAPANS FIRST WTI JACK-UP

JAPANS FIRST WTI JACK-UP A NEW DESIGN & PROVEN TECHNOLOGY GustoMSC GJ-3750C Self-Propelled Continuous Jacking 800t Crane Japanese Flag Japanese NK Class Japanese Shipyard Japanese equipment Dutch Design Dutch Jacking system Dutch Sub-suppliers: Bosch Rexroth Breman Huisman Trelleborg

THANK YOU FOR YOUR KIND ATTENTION JAN-MARK MEEUWISSE, COMMERCIAL DIRECTOR JACK-UPS janmark.meeuwisse@gustomsc.comi