Tourist. Signing. Policy. Off-Road Bikeway Signs

Similar documents
A Bicycle Network for a North American Metropolis: The Case of Montreal

Bicycling Routes on Provincial Roads Policy

Introductory Pages. Pages Date Pages Date

CALL FOR PROPOSALS BICYCLE LANES UPDATED NOVEMBER 9, 2017 (EXTENSION)

Shifting Gears for a Healthier City

Sport fishing in Québec (including salmon fishing) - April 1, 2017 to March 31, 2018 Fishing periods, catch limits and exceptions - Zone 21

Cycling in Québec : From Hollydays to Every Day

ONTARIO BIKE SUMMIT 2012 Louisa Mursell Projects Director Phone: /

Cycling in Québec : From Hollydays to Every Day

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

Shifting Gears for a Healthier City.

Managing Our Legacy Together

Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways)

City of Waterloo Complete Streets Policy

Bike to the Future c/o Portage Avenue. Winnipeg, MB. R3B 2B2 Fax:

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Passionately ST. LAWRENCE

Plant City Walk-Bike Plan

PUBLIC CONSULTATION SUMMARY DOCUMENT

From Montreal From Quebec

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Copenhagen Cycling Map. Red Lines Cycling facilities

COUPE DE MONTRÉAL 2017 SUPPLEMENTARY REGULATIONS 1 st ROUND MAY 7 th, St-Roch-de-L Achigan

Signs. signs, signals and road markings. in this chapter

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Perryville TOD and Greenway Plan

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Trans Canada Trail Véloroute Voyageur Cycling Route WAYFINDING SIGNAGE PLAN for Low to Moderate Volume Highways

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Chapter 3 DESIGN SPECIFICATIONS

Lessons from international experience How to better use our public money to the benefit of walking and cycling

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Classification Criteria

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

Sport fishing in Québec (including salmon fishing) - April 1, 2017 to March 31, 2018 Fishing periods, catch limits and exceptions - Zone 27

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

Pedestrian and School Bus Safety TEACHING GUIDE ( DVD included)

Appendix C. Bicycle Route Signage

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

By Anne-Julie Dubois, M. Urb candidate Universite de Montreal, Canada

Outline. 0 The ESSAIM project: main objective 0 Data collection 0 Results 1 In-situ observations 2 Vehicle-Pedestrian interactions 0 What s next?

Appendix D. City of Fort Collins Bicycle Wayfinding System Guidance. Appendix D: Bicycle Wayfinding System Guidance Final Draft 11/20/2014 1

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Laurier Segregated Bike Lane Pilot Project July 2013 update

Spring/Summer Traffic and Construction Technical Briefing

Rd Pick BATHURST Acquired Pick Acadie-Bathurst - 9 picks Acadie-Bathurst Acadie-Bathurst - least picks in the draft Charlottetown 1 5

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

TO\fH,:>-1 0 ::: 'l, Regional Clerk's Office

WalkBikeNC Plan. Presenters Anne Eshleman, EIT, LEED AP Led bike route analysis. Stephen Bzomowski, Planner Public input and data development

Come and discover the NETWORK OF OBSERVATION SITES. along the Whale Route. A unique marine mammal experience!

(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..

Request for Decision. Ontario Municipal Commuter Cycling Program Grant. Resolution. Presented: Tuesday, Feb 13, 2018

APPENDIX 4 PEDESTRIAN FACILITY DESIGN INFORMATION

16 to 18 February 2018 Myriam Bédard Biathlon Centre Valcartier Garrison, Quebec

BICYCLING IN QUÉBEC IN 1995 AND 1996 VOLUME 1

EFLECTIONS THE ST. LAWRENCE RIVER VOICES. St. Lawrence. Vision Health Component

Peterborough Council on Aging

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Access Routes from US 101 to the Richmond San Rafael Bridge

Dowling/Beaty Cycling Route

BURNHAMTHORPE ROAD EAST RECONSTRUCTION INFORMATION SESSION. November 9, 2017

ACTION TRANSMITTAL No

Welcome and Purpose of Meeting

CYCLE TOURISM DESTINATION DEVELOPMENT

ONTARIO BY BIKE NETWORK

EuroVelo Overview Route Database

MONTRÉAL, CITY OF CYCLISTS Cycling Master Plan: Safety, Efficiency, Audacity

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Appendix 3 Roadway and Bike/Ped Design Standards

TRANSPORTATION & MOBILITY

EVENT INVITATION NorAm Cup # 3 Québec Cup # to 14 JANUARY Hosted by:

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

Manual Of Standard Traffic Signs And Pavement Markings Alberta

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

Traffic Calming Policy

October 30 th, 2012 Committee of the Whole Meeting Cycling Task Force Recommendations BIKE RACKS

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

MUTCD Part 6: Temporary Traffic Control

Pedestrian Crosswalk Audit

Transportation Development Act Grant Center Avenue Pedestrian Signal Project

TRAFFIC CALMING POLICY & PROCEDURES

PARC NATIONAL DE MIGUASHA DISCOVERY GUIDE 2018

Cycling Study. Lanark County

Zlatko Krstulich, P.Eng. City of O9awa

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

March, 2017 Christophe Najdovski, Deputy Mayor of Paris for transport, street network, mobility and public space. Roads and Mobility Parisian Policy

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Transcription:

Signing Tourist Policy Off-Road Bikeway Signs

Signing Tourist Policy Off-Road Bikeway Signs

Prepared by: Jacinthe Dumoulin, Tourisme Québec Danielle Lavoie, Tourisme Québec Michel Masse, Ministère des Transports Cover design and graphics Vox Communication et Graphisme La version française peut aussi être consultée à l adresse www.bonjourquebec.com/signalisation English version available: «Policy on Tourist Signage - Off-Road Bikeway Signs». May be also displayed on Web site www.bonjourquebec.com/signing Tourisme Québec Ministère des Transports du Québec November 2002 Legal deposit Bibliothèque nationale du Québec 2002 ISBN 2-550-38141-6

Table of Contents 1 2 TARGET PRODUCT 5 OBJECTIVES 2.1 CONTRIBUTE TO REGIONAL TOURIST DEVELOPMENT 6 3 4 2.2 FOSTER INTER-REGIONAL COOPERATION FOR TOURIST 6 DEVELOPMENT PRINCIPLES FOR BIKEWAY SIGNS 6 ELIGIBILITY CRITERIA 4.1 CORE CRITERIA 7 5 7 9 6 8 4.2 SPECIFIC CRITERIA FOR SIGNS TO INDICATE ACCESS POINTS 8 4.3 CRITERIA FOR PRESENTING INFORMATION ON WINTER ACTIVITIES 8 TYPES OF SIGNS 8 INSTALLATION OF SIGNS GIVING DIRECTIONS TO BIKEWAYS 9 COSTS OF SIGNS 9 APPLICATION PROCEDURE FOR TOURIST SIGNAGE 10 MANAGERS OF PROGRAM 9.1 TOURISME QUÉBEC AND MINISTÈRE DES TRANSPORTS 11 9.2 ASSOCIATIONS TOURISTIQUES RÉGIONALES ASSOCIÉES 11 DU QUÉBEC (ATRAQ) 9.3 REGIONAL TOURIST ASSOCIATIONS 12-13 APPENDIX 1 SIGNS FOR OFF-HIGHWAY BIKEWAYS COST SCHEDULE (effective July 1, 2001) 14

1. Target product Off-highway bikeways are bicycle paths that run on specially designated routes separate from roads that carry automobile traffic. Bicycle paths can be built on public utility rights-of-way, for example, hydroelectric line rights-of-way or abandoned railway lines. Bikeways allow cyclists to go from one end to the other of developed and maintained routes that are easily accessible to all kinds of bicycles during the entire cycling season. However, the cycling season can vary from one region to another. In the winter, bikeways may be used for other activities such as cross-country skiing or snowmobiling. Bikeways run for several kilometres, interspersed with several access and service points. They form a tourist route having the following features: They are made up of a linear or circular route that runs for several kilometres and goes through different municipalities. They have a starting point and an ending point. They provide additional access points throughout their length. They are promoted in tourist publications or are included in maps. The following are not recognized as off-highway bikeways: Asphalt shoulders Bicycle lanes On-road marked bicycle routes 5

2. Objectives Bikeway signs are signs placed on highways to indicate the location of bikeways forming part of Québec s Route verte system and, as well, the location of regional bikeways. 2.1 CONTRIBUTE TO REGIONAL TOURIST DEVELOPMENT Promote regional tourist activities by means of signs for bikeways that are presented in information documents and are recognized by Tourisme Québec, Vélo Québec and the Associations touristiques régionales associées du Québec. Foster access by visitors to bikeways allowing them to discover the natural heritage of Québec s different regions. Cyclists should, throughout the route, be able to further explore a region and to use the available tourist signs to get to public tourist facilities (e.g., provincial parks) and to private tourist facilities (e.g., attractions, activities, lodging services). 2.2 FOSTER INTER-REGIONAL COOPERATION FOR TOURIST DEVELOPMENT Connect the regional bikeways in Québec that make up the Route verte and crisscross different regions. 3. Principles for Bikeway Signs Bikeway signs are included under the program for tourist route signs and are subject to the principles established for that program. Self-funding: Costs of signs are the responsibility of the applicants and the persons who benefit from the signs. Standardized signs: Standards for the shape, colour, size and location of signs on highways. Complete sign system: Extending off the highway system giving access to a service point on the bikeway over at least 20 km. 6

Eligibility 4. Criteria Tourisme Québec and the ministère des Transports determine the eligibility criteria for off-highway bikeways. Tourisme Québec assesses the eligibility of bikeways. 4.1 CORE CRITERIA Must be part of the Route verte, or must be a regional bikeway that is recgnized by the regional tourist association in which it is located. Must be independent from the highway network. Must be at least 20 km long. Must be open at least 5 days a week, on an ongoing basis during the cycling season. Must offer visitor services 5 days a week. Must offer designated on-site or nearby parking. The parking area must be accessible from the site, with signs giving directions to the site. Must have at least one public toilet. Must offer emergency services the length of the route. Must offer the rental of at least 10 bicycles at a minimum of one location near the route. Must have a short and unambiguous name, which does not include the name of a community. Must be one continuous route, that is, it cannot not be separated into several branches offering different route choices to cyclists. Must not intersect with other bikeways. Must be on a marked and maintained trail, and must present a good level of quality and comfort to cyclists. Must be described in the regional tourist guide produced by the regional tourist association. The guide must indicate the length of the route, the services that are available, and all access points to the route. The route may also be included in other brochures and publications that are recognized by Tourisme Québec, Vélo Québec and the regional tourist association. Must be on a map on which major cities or municipalities appear. Must offer route maps on-site, or at least on-site consultation of the route map. Signs may be put up at either end of a bikeway that meets these criteria. 7

4.2 SPECIFIC CRITERIA FOR SIGNS TO INDICATE ACCESS POINTS Signs may be posted at other access points located throughout the length of the bikeway if the access points meet the following criteria: Must offer visitor services five days a week Must offer on-site or nearby parking. The parking area must be accessible from the site, with signs giving directions to the site. Must have at least one public toilet. Must be indicated on the map of the bikeway. Must be indicated as an access point in the regional tourist guide produced by the regional tourist association. It may also be indicated in other brochures or publications that are recognized by Tourisme Québec, Vélo Québec and the regional tourist association. Must offer route maps on-site, or at least on-site consultation of the route map. 4.3 CRITERIA FOR PRESENTING INFORMATION ON WINTER ACTIVITIES Pictographs for winter activities may be added to bikeway signs provided that such activities are accessible from an access point that meets the above-mentioned criteria. The winter activity in question must also meet the core criteria and specific criteria of the policy governing signs for tourist attractions and activities, and lodging services. 5. Types of Signs The 1-535 sign presents a pictograph for a bikeway. This sign also gives the name of the bikeway. Any bikeway that is recognized by Route verte will be identified as such on the sign. Also, pictographs may be presented for any winter activities that are offered on the bikeway from an access point. 1-535 8

6. Installation of Signs Giving Directions to Bikeways Directional signs for an off-highway bicycle route must be installed so as to provide continual information up to the route. Directions must be provided as follows, from the freeway system only: An I-535 sign is erected in the sequence of advance guide signs, and another sign is installed in the sequence of exit direction signs up to 20 km from the access road to the route. These signs, measuring 900 x 900 mm or 1200 x 1200 mm, are installed under the oversized destination signs. In exit ramps and on other highways leading to the route, the signs measure 600 x 600 mm. Directional signs on freeways are installed under the advance guide signs and exit directions signs when these signs are side-mounted. When the destination signs are overhead, the signs, supplemented by the appropriate I-240-P tab signs, are ground-mounted near the structures of the advance guide and exit direction signs. I-535 signs, supplemented by I-240-P direction tab signs, must be installed between the exit ramp and the bicycle route entrance if there is a major intersection or a change in direction. Where the bicycle route entrance is on a highway with a speed limit of 90 km/h, an I-535 sign is installed 1 km from the site in either direction. An I-535 sign, supplemented by an I-240-P-3 tab sign, must be installed at the site entrance. The signs for off-highway bicycle routes must be placed at least 150 m upstream of the intersection and at least 50 m from any other sign. When signs are to be installed on a public highway maintained by the ministère des Transports and on a public highway maintained by a municipality, they must first be installed on the public highway maintained by the municipality. 7. Costs of Signs Costs of signs are assumed by the applicant. They are calculated according to the number of signs required to ensure full guidance of users from a highway exit to a service point. The total cost of a sign contract may vary from one bikeway to another. This is because signs must be put up for each direction change, and one bikeway may require more directional signs than another one does. Also, costs of signs vary according to their sizes. The ministère des Transports determines the sizes of the needed signs. The cost schedule is given in Appendix 1. 1 To indicate an off-highway bikeway from another kind of road (e.g., main or secondary road, etc.), the signs described in Signalisation des voies cyclables published by Publications du Québec must be used. 9

Application procedure for 8. tourist signage An application for off-highway bikeway signs must be made by the organization that manages the bikeway. If one or more organizations or municipalities are involved in the management of the bikeway, a single application by all partners must be made. The Association touristique régionale (ATR) serves as a liaison with Tourisme Québec regarding the application. Sign contracts are managed by the ATR associées du Québec. 1. The manager of the bikeway must contact the involved ATR to complete the required forms and must provide the information required for the application, as well as the following documents: - A map presenting the route of the bikeway. - A list of the bikeway s access points at which signs are to be put up. - For each access point, the assessment grid on the commitment of the manager of the access point to comply with the eligibility criteria for the duration of the contract. 2. The ATR must include on the application form all information needed to assess the application, and must ensure compliance with the eligibility criteria. The ATR must also confirm its official recognition of the bikeway, and must send the application, along with all required documents, to Tourisme Québec to obtain confirmation of eligibility. 3. Tourisme Québec studies the bikeway s application form and assesses the eligibility of each access point for which the bikeway manager wishes to put up signs. Tourisme Québec then authorizes or refuses the application in terms of the sign system being proposed. In the event of refusal, it gives the necessary explanations. Tourisme Québec returns the results of its assessment of applications to the ATR. 4. Upon receipt of approval from Tourisme Québec, the ATR notifies the bikeway manager and the ATR associées du Québec of the eligibility of the signs that have been approved by Tourisme Québec. Upon receipt of a refusal from Tourisme Québec, the ATR notifies the manager of the refusal and provides the necessary explanations 5. Upon receipt of notification from Tourisme Québec concerning the eligibility of the sign system, the ATR associées du Québec obtain the necessary authorization to install the signs from the ministère des Transports and from the municipalities involved. Then, the ATR associées du Québec prepare a sign contract, lasting from one to five years, for the entire bikeway and the access points at which signs are to be put up. It then sends the contract to the manager of the bikeway for his or her signature. After the contract has been signed, the ATR associées du Québec initiate the procedure for having the signs made and installed. 6. Throughout the length of the contract, the bikeway manager must comply with the eligibility criteria and must inform the ATR of any changes to the services offered by the bikeway or of any changes to the management of the bikeway. In the event of noncompliance with the criteria, Tourisme Québec and the ATR associées du Québec will initiate a procedure to have the manager remedy the situation. If the criteria are still not complied with, the ATR associées du Québec may terminate the contract and remove the signs. Before the end of the contract, the ATR associées du Québec will send the bikeway manager notification of the contract s imminent ending date along with information on the procedure to follow to renew the contract. 10

9. Managers of Program 9.1 TOURISME QUÉBEC AND MINISTÈRE DES TRANSPORTS The sign program for off-highway bikeways is a government-run program. Its content, including eligibility criteria and sign standards, is the responsibility of Tourisme Québec and the ministère des Transports. TOURISME QUÉBEC Direction générale des services à la clientèle touristique Office 400 1010, rue Sainte-Catherine Ouest Montréal (Québec) H3B 1G2 www.bonjourquebec.com/signalisation Resource persons: Jacinthe Dumoulin Danielle Lavoie MINISTÈRE DES TRANSPORTS Service des technologies d exploitation 700, boulevard René-Lévesque Est, 22 th Floor Québec (Québec) G1R 5H1 Resource person: Michel Masse, P. Eng. 9.2 ATR ASSOCIÉES DU QUÉBEC The ATR associées du Québec manage contracts for off-highway bikeway signs. They also oversee the manufacture, installation and maintenance of signs, all according to standards established by the ministère des Transports. ATR associées du Québec Office 300, 3333, boulevard du Souvenir Laval (Québec) H7V 1X1 Tel. : (450) 686-8358 Resource person: Isabelle McCann 11

9.3 REGIONAL TOURIST ASSOCIATIONS TOURISME ABITIBI-TÉMISCAMINQUE 170, avenue Principale, Office 103 Rouyn-Noranda (Québec) J9X 4P7 Tel: (819) 762-8181 TOURISME BAS-SAINT-LAURENT 148, rue Fraser Rivière-du-Loup (Québec) G5R 1C8 Tel: (418) 867-1272 TOURISME CANTONS-DE-L EST 20, rue Don-Bosco Sud Sherbrooke (Québec) J1L 1W4 Tel: (819) 820-2020 TOURISME CENTRE-DU-QUÉBEC 20, boulevard Carignan Ouest Princeville (Québec) G6L 4M4 Tel: (819) 364-7177 TOURISME CHARLEVOIX 495, boulevard de Comporté P.O. Box 275 La Malbaie (Québec) G5A 1T8 Tel: (418) 665-4454 TOURISME CHAUDIÈRE-APPALACHES 800, autoroute Jean-Lesage Saint-Nicolas (Québec) G7A 1C9 Tel: (418) 831-4411 ASSOCIATION TOURISTIQUE DE DUPLESSIS 312, avenue Brochu Sept-îles (Québec) G4R 2W6 Tel: (418) 962-0808 TOURISME GASPÉSIE 357, route de la Mer Sainte-Flavie (Québec) G0J 2L0 Tel: (418) 775-2223 ASSOCIATION TOURISTIQUE DES ÎLES-DE-LA-MADELEINE 128, Chemin du Débarcadère P.O. Box 1028 Cap-aux-Meules G0B 1B0 Tel: (418) 986-2245 TOURISME LANAUDIÈRE 3645, rue Queen, C.P. 1210 Rawdon (Québec) J0K 1S0 Tel: (450) 834-2535 ASSOCIATION TOURISTIQUE DES LAURENTIDES 14142, rue de la Chapelle Mirabel (Québec) J7J 2C8 Tel: (450) 436-8532 TOURISME LAVAL 2900, boulevard Saint-Martin Ouest Laval (Québec) H7T 2J2 Tel: (450) 682-5522 12

ASSOCIATION TOURISTIQUE DE MANICOUAGAN Bureau 304, 337, boulevard La Salle Baie-Comeau (Québec) G4Z 2Z1 Tel: (418) 294-2876 TOURISME MAURICIE 777, 4 e Rue Shawinigan (Québec) G9N 1H1 Tel: (819) 536-3334 TOURISME OUTAOUAIS 103, rue Laurier Hull (Québec) J8X 3V8 Tel: (819) 778-2222 OFFICE DU TOURISME ET DES CONGRÈS DE QUÉBEC 399, rue Saint-Joseph Est, 2 nd Floor Québec (Québec) G1K 8E2 Tel: (418) 522-3511 TOURISME MONTÉRÉGIE 11, chemin Marieville Rougemont (Québec) J0L 1M0 Tel: (450) 469-0069 TOURISME SAGUENAY LAC-SAINT-JEAN 455, rue Racine Est, Office 101 Chicoutimi (Québec) G7H 1T5 Tel: (418) 543-9778 TOURISME MONTRÉAL 1555, rue Peel, bureau 600 Montréal (Québec) H3A 3L8 Tel: (514) 844-5400 TOURISME BAIE-JAMES 166, boulevard Springer Chapais (Québec) G0W 1H0 Tel: (418) 745-3979 13

Appendix 1 SIGNS FOR OFF-HIGHWAY BIKEWAYS COST SCHEDULE (effective July 1, 2001) Type of sign Dimensions (mm) New contract 1 Annual Five-year 2 Sign on major highway signs (green) (Type I-535) 1200 x 1200 $84 $420 900 x 900 $50 $250 Self-standing signs on highways (Type I-535 + I-240-P) 1200 x 1800 900 x 1350 $126 $630 $87 $435 Sign installed on highway ramp or any other road (Type I-535 + I-240-P) 600 x 900 $47 $235 1 Costs are indexed according to the CPI on April 1 each year. 2 A 25% discount is applicable to the second renewal of a contract. 14

Notes 15

16 Notes

Produced by: Tourisme Québec Ministère des Transports