Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

Similar documents
State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

The I-85 Express Lanes Project NASCIO Recognition Award Nomination

Highway 217 Corridor Study. Phase I Overview Report

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

Capital Beltway HOT Lanes - Frequently Asked Questions

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

4.1 Evaluation Criteria

Public Information and Participation Comments

Comment cards and s were received and compiled. Major Concerns/Comments

IH 85 EXPRESS LANES ATLANTA, GA USDOT Congestion Reduction Demonstration Program Grant ($110M)

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Traffic Congestion in Houston. Presented by Bill King

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Freeway System Considerations

5. RUNNINGWAY GUIDELINES

I-66 Corridor Improvements Route 15 to I-495. November 2014

Bicycle Master Plan Goals, Strategies, and Policies

Key objectives of the survey were to gain a better understanding of:

Commuter Connections Regional TDM Marketing Group Meeting

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

92% COMMUTING IN THE METRO. Congested Roadways Mode Share. Roadway Congestion & Mode Share

11,000. P.M. Peak Hour Vehicles/Hour 10,000 9,000 8,000. Year

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

North Coast Corridor:

I-635 LBJ EAST PROJECT

Congestion Evaluation Best Practices

Strategies to keep people and goods moving in and through Seattle

Appendix T-2: Transportation Facilities Inventory

I-35W Solutions Alliance Project Update July 13, 2017

395 Express Lanes Extension

Washington DC Section of ITE Project Briefing

Public Hearing Tarrant County. October 11 th, 2012

Improving Mobility Without Building More Lanes

MnPASS System Today and the Future

An Easier Commute. Learn how to use I-77 Express to save you time.

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

2009 URBAN MOBILITY REPORT: Six Congestion Reduction Strategies and Their. Effects on Mobility

DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY

North Shore Transportation Improvement Strategy

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Exhibit ES1: Project Study Area Introduction

Maryland State Highway Mobility Report. Morteza Tadayon

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Preliminary Transportation Analysis

Santa Clara I-280 CORRIDOR STUDY

APPENDIX D. May 22, 2002 Open House Summary and Materials

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

Technical Working Group November 15, 2017

101 Corridor Managed Lanes

I-105 Corridor Sustainability Study (CSS)

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Toll Rate Public Hearing

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

MOVEABLE BARRIER. Congestion Management Solutions

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Managed Lanes: A Popular and Effective Urban Solution. Ed Regan Presented by Susan Buse

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

2011 Countywide Attitudinal and Awareness Survey Results

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Managing Dulles Rail Construction in Tysons Corner

Welcome to the McKenzie Interchange Project Open House!

Highway 17 Transportation Improvement Study

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation?

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Charlotte Region Fast Lanes Study Phase III

Community Task Force November 15, 2017

Northwest Corridor Project (I-75/I-575) Agenda. Brief Project History. Stakeholder Briefing January 27, Brief Project history

LOOP 360 IMPROVEMENT STUDY

Transportation Master Plan Advisory Task Force

CPC Parking Lot Riverside Drive. Transportation Rationale

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

How To Encourage More Efficient Transportation in Brazilian Cities

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

Albany Shaker Road Corridor Study Public Meeting # 2

WILMAPCO Public Opinion Survey Summary of Results

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

The Bay Bridge Corridor Congestion Study

York Region Population and Employment Growth

DRAFT. Memo. Range of the Alternatives Considered in the EIS

National Capital Region Congestion Report

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Providing an Efficient and Multi-modal Transportation System

Transcription:

Congestion Reducing Activities Toby Carr GDOT Director of Planning April 10, 2014

GDOT Performance Dashboard Congestion

Congestion Relief Strategies 511 HEROS RTOP

Highway Emergency Response Operators (H.E.R.O.)

Regional Traffic Operations Program Phase 1 June 9, 2010 Phase 2 October 27, 2010 Phase 3 January 4, 2013 Phase 4 October 15, 2013 1000 Signals $14 million per year total 25 Corridors Traffic Signal Maintenance and Repair Issues Regional Focus Mainline Priority Cross Jurisdictional Actively Manage Traffic Flow

RTOP Benefits DRAFT Spring 2013 comparison to baseline Reduced number of stops by 4% Reduced stopped time delay by.1% Traffic volumes increased by 10.8%

Traffic Signal Optimization Metro Signal Timing (2008 2013) 1,364 intersections retimed (Metro Atlanta) Total savings of $101,160,000 Cost/benefit of 24.30 over entire project Statewide Traffic Signal Optimization (2014) Signal systems on State Routes across Georgia Partnerships with local maintaining agencies Continuation of existing optimization through STIP years

Operational Improvement Program Program Overview DRAFT Total Projects: 80 (2009 2014) LET to Construction: 39 Average Delay Reduction: 49% - Bottleneck Mitigation Projects - Quick Fix federally funded projects to improve operations with limited scope and reduced costs - Innovative Design Alternatives strongly encouraged

Other Strategies Implemented Navigator/511 Cameras, electronic message signs, vehicle detection Ramp Meters Regulate Access onto the freeway Flex Shoulder Lanes GA400 Allows traffic to use right shoulder during peak morning rush hour Flashing Yellow Arrow Reduction in Left Turn Crashes

GA Commute Options: Get More by Driving Less Carpooling Free service to match carpoolers Employer Services Program Consultation, Ride matching for employees, Tax Benefits, Teleworking Guaranteed Ride Home Service Vanpools Find or start a vanpool Transit Provide Traveler Information Commute Options provides incentives for switching from driving alone to another option

Metro Atlanta Commuter Patterns Source: 2010 Center for Transportation and the Environment study conducted on behalf of the Georgia Department of Transportation

Georgia Commute Options Participant Commuter Patterns 20% increase since 2007 in the number of commuters using alt modes 3+ days per week. Source: 2010 Center for Transportation and the Environment study conducted on behalf of the Georgia Department of Transportation

GCO Reduces Congestion

Georgia Commute Options Daily Results Serves 1,600 Georgia employers and property managers Reduces 1.1 million miles of vehicle travel daily in metro Atlanta Eliminates 550 tons of air pollution daily in metro Atlanta Saves participants $500,000 in direct savings on gas and vehicle expenses, daily in metro Atlanta

Overview Identify bottleneck areas on limited access highways Identify and evaluate potential low cost improvements Quick implementation 6 months to 5 years Document a prioritized list of operational projects

Identification of Bottleneck Locations Data Inputs User Inputs Speeds &counts Bus drivers Aerial congestion survey Unit operators GDOT TMC staff GPS speeds & duration of congestion Public & Private Stakeholders

Causes of Bottlenecks High volumes Weaving Lane drops/additions Last minute decision making Lack of storage on ramps and/or high turn volumes Tight turning radii and/or steep grade on ramps Frontage road access Limited access facility terminates at signalized intersection

Current Activities Active Traffic Management (ATM)

Possible Activities Intersection Improvements at Ramp Terminals Option 2: Provide SB right turn arrow & re-stripe taper From Option 1: Prohibit left turn at Ivan Allen Jr Blvd Option 3: Add 2 nd right turn lane from Ivan Allen Jr Blvd to Williams St Ramp Meter Bypass Lane For Transit Option 4: Allow 2 nd right turn/thru lane Option 1: Left turns would shift to W Peachtree Pl

Strategies Under Evaluation by Cost Range Number of Projects Being Considered by Cost Range 71 projects <$1m $1m $5m $5 $10m >$10m 1 project totaling less than $160 million 11 projects 20 projects 39 projects

MLIP Will Update 2009 Atlanta Regional Managed Lane System Plan (MLSP) First regional managed lanes plan in the country In 2009, there were no priced managed lanes in the Atlanta region (only HOV lanes) Identified $16 billion in managed lane projects

New Assumptions All new limited access capacity in metro Atlanta will likely be tolled Remove HOV2+ to HOT3+ conversions from plans Eliminate assumptions of long term concession agreements Evaluate lower cost managed lane treatments, where possible

Questions? 511 HEROS RTOP