TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

Similar documents
Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

Due to. manual. in one day. telescoping. designed to. established. 1 Pag. g v2.0

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading

PERFORMANCE CRITERIA

Operate non slewing mobile cranes (less than three tonnes capacity)

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

Operate a bridge or gantry crane (remote operation only)

Release 3. MSABLIC001 License to operate a standard boiler

MEWP - Boom Note: It is recommended that you read the Supporting Information page before you read this factsheet.

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS

TLILIC2001 Licence to Operate a Forklift Truck

Elevating Work Platforms. WP Class Assessment Information

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

Participate in a rescue operation

KG Training and Assessing. IMPORTANT! You must read this first!

LEARNER GUIDE. Transporter Safety (TRO) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

MEWP - Scissor Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Pannier Corporation Health and Safety Handbook Marking System Group Aerial Lifts Original Date: Section: Revision date: Page: 12/5/ of 11

Aerial Lift Safety Program

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

Safe Work Method Statement

SAFETY HARNESSES IN MOBILE ELEVATING WORK PLATFORMS

Prevention of Falls and Working at Heights

Safety at Work. Rules for Staying Alive

1 Respond to the 1.1 The situation is assessed in a manner that recognises that it

Who Wants To Be a MEWP Millionaire?

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

CPCS renewal test factsheet

Work Activity (e.g. Road Work): Work Location:.

A25/A26. MEWP Scissor and Boom

2016 COURSE CATALOGUE

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

LADDERS FIXED AND PORTABLE

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Guidance on Using Temporary Suspended Access Equipment

We take safety very personally at Aurecon. Safety is everybody s business, every day. Health and safety incidents are not inevitable, they are

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

List all key terms and acronyms used in the procedure, and their definitions.

Surface exploration drilling

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

Hazard Management Making your workplace safer

Working at Heights Training Checklist (Ontario Version)

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

Policy Redesign Project. Plant Safety Policy. Table of Contents

CPCCWHS1001 Prepare to work safely in the construction industry

SYDNEY TRAMWAY MUSEUM WORKING ON ELEVATED PLATFORMS PROCEDURE

Safe Work Method Statement

Aerial Lift Safety Program

Worksite Safety Update Promoting safety in roadwork

WORK METHOD STATEMENT STRUCTURAL STEEL

Application 15.1 This Part applies to every workplace where a worker works in a confined space.

8. Fall Protection Procedures WAC

GOLDEN SAFETY RULES AFT DR

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Safe Work Method Statement

Telco Antennas SWMS Working At Height Above 2m

Our commitment to safety

Lifting Operation & Lifting Equipment Procedure

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

To comply with the OHS Act, the responsible manager must carry out and document the following:

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Buchanan. Approved: John Downes

PRO Lifting Operations

SAFE WORK METHOD STATEMENT SWMS No Version

ANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America

Region: USA Language: EN Number : TB0031 Revision : B. Total Page: 3 Page n : 1 First Issue: 10/2014 Rev. Date: 10/08/2014

Scissor Lifts Course Outline

PLANT/EQUIPMENT/ASSET HAZARD REPORT

Temporary load-bearing support for structural alterations or repairs

Control of Energy - Isolation Process

SAFETY MANAGEMENT SYSTEM

LEARNER GUIDE. Asphalt Paver (AP) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

The selection and management of mobile elevating work platforms

PLANT/EQUIPMENT/ASSET HAZARD REPORT

SASOL LIFE SAVING RULES (LSRs)

Risk and Hazard Management

General maintenance engineering applications

SEMIC05 Installing mechanical equipment

Maintaining electrical equipment/systems

Plant Isolation Lock out/tag out Procedure

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

User Instructions 1790 Rail Anchor

Health & Safety Policy & Plan. Rightway Roofing.

SAFETY MANAGEMENT SYSTEM

Safe work method statements

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

S31 Opening Statement Working at Height

Manually Propelled Risk and Hazard Management

SAFETY MANAGEMENT SYSTEM

FALL PROTECTION (SAF-SPI-06)

FALL PROTECTION / ELEVATED WORK

WORKING AT HEIGHT RESOURCE BOOKLET. Working at Height 1

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Transcription:

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) Release: 1

TLILIC2005A Licence to operate a boom-type elevating work platform (boom length 11 meters or more) Modification History Not Applicable Unit Descriptor Unit Descriptor This unit specifies the outcomes required to operate a boomtype elevating work platform (boom length 11 metres or more) for licensing purposes, and involves the operation of a telescoping device, hinged device, or articulated device or any combination of these used to support a platform on which personnel, equipment and materials may be elevated to perform work. The 11 metre boom length shall be taken to mean the greater of the following: (a) The vertical distance from the floor of the platform to the surface supporting the elevating work platform with the platform at its maximum height; or (b) The nominal reach, measured horizontally from the centre point of rotation to the outer edge of the platform in its most extended position. Application of the Unit Application of the Unit This unit requires the operator to plan the work, conduct routine checks, set up elevating work platform, operate elevating work platform and shut down and secure elevating work platform. This unit is based on the requirements of the National Standard for Licensing Persons Performing High Risk Work. This unit in its current form meets state and territory licensing requirements. Any alteration will result in a unit which is not acceptable to regulators for the purpose of licensing. Licensing/Regulatory Information Refer to Unit Descriptor Approved Page 2 of 16

Pre-Requisites Not Applicable Employability Skills Information Employability Skills This unit contains employability skills. Elements and Performance Criteria Pre-Content Elements describe the essential outcomes of a unit of competency Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge and/or the range statement. Assessment of performance is to be consistent with the evidence guide. Approved Page 3 of 16

Elements and Performance Criteria ELEMENT PERFORMANCE CRITERIA 1. Plan work 1.1 Potential workplace hazards are identified 1.2 Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment 1.3 Elevating work platform is appropriate for the task 1.4 Appropriate communication methods are identified 2. Conduct routine checks 2.1 Service logbook for elevating work platform is checked for compliance 2.2 Elevating work platform is visually checked for any defects or damage according to procedures 2.3 Routine pre-operational checks are carried out according to procedures 2.4 Safety equipment is inspected according to procedures 2.5 Elevating work platform is accessed in a safe manner 2.6 Fit safety equipment and secure to platform according to procedures 2.7 All controls are located and identified 2.8 Elevating work platform is started according to procedures 2.9 All safety devices are identified and tested according to procedures 2.10 Post-start operational checks are carried out according to procedures 2.11 All communication equipment is checked (where applicable) 2.12 All defects and damage are reported and recorded in according to procedures, and appropriate action is taken 3. Set up elevating work platform 4. Operate elevating work platform 3.1 Ground suitability is inspected and checked 3.2 Elevating work platform is driven to or located at work area according to procedures (where applicable) 3.3 Elevating work platform is positioned for work application and stability according to procedures 3.4 Appropriate hazard prevention/control measures are applied to the work area according to procedures 3.5 Work gear and tools are stowed and secured 4.1 Elevating work platform is operated using all relevant plant movements according to procedures and the appropriate standards 4.2 Elevating work platform is mobiled using best mobile Approved Page 4 of 16

ELEMENT PERFORMANCE CRITERIA practice and appropriate procedures 4.3 Elevated working platform operations are monitored constantly ensuring safety of personnel and stability 4.4 Unplanned and/or unsafe situations are responded to in line with procedures Approved Page 5 of 16

ELEMENT 5 Shut down and secure elevating work platform PERFORMANCE CRITERIA 5.1 Elevating work platform is lowered and stowed according to procedures 5.2 All relevant motion locks and brakes are applied (where applicable) 5.3 Safety equipment is disconnected from platform 5.4 Egress from elevated work platform is conducted according to procedures 5.5 Outriggers/stabilisers are stowed and secured according to procedures (where applicable) 5.6 Plates or packing are stowed and secured (where applicable) 5.7 Elevating work platform is shut down according to procedures 5.8 Routine post-operational checks are carried out according to procedures 5.9 All defects and damage are reported and recorded according to procedures, and appropriate action is taken Required Skills and Knowledge REQUIRED SKILLS AND KNOWLEDGE This describes the essential skills and knowledge and their level required for this unit. Required skills: Accurately record and maintain information relating to elevating work platform operations Assess ground conditions to confirm that the site is suitable (e.g. firm, level and safe) to extend and travel the elevating work platform Complete the positioning, stabilising, set up of elevating work platforms, including the use of outriggers/stabilisers and packing Operate mobile elevating work platform using best mobile practice Use communication skills at a level sufficient to communicate with other site personnel Operate and control an elevating work platform including all functions to their maximum extension within the safe working (rated) capacity Apply risk assessment and hazard control strategies, including hierarchy of control as applied to the positioning and safe operation of the elevating work platform (particular awareness of the risks associated with overhead powerlines/electrical cables, ground conditions, wind, pedestrians and tipping) Approved Page 6 of 16

REQUIRED SKILLS AND KNOWLEDGE Use and interpret manufacturer's specifications and data Identify problems and equipment faults and where practicable demonstrate appropriate response procedures Approved Page 7 of 16

REQUIRED SKILLS AND KNOWLEDGE Required knowledge: Appropriate mathematical procedures for estimation of loads, to ensure that the elevating work platform is not overloaded Commonwealth, state or territory OH&S legislation, standards and codes of practice relevant to the full range of processes for conducting elevating work platform operations Ability to read and comprehend manufacturer's instructions, procedures and safety signs Understanding of elevating work platform operations and operating techniques Emergency procedures and safety equipment, including the use of safety harness, energy absorber, lanyard and anchor points Understanding of organisational and workplace standards, requirements, policies and procedures for conducting elevating work platform operations Understanding of the hierarchy of hazard identification and control Procedures for the recording, reporting and maintenance of workplace records and information, including the use of the service logbook Typical routine problems encountered in the process and with equipment and adjustments required for correction Evidence Guide EVIDENCE GUIDE The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package. Overview of assessment Successful assessment of this unit meets the competency requirement of the National Standard for Licensing Persons Performing High Risk Work. State/territory OH&S regulators have mandated the use of Assessment Instruments and Instructions for Assessment for this unit which have been endorsed by the national body responsible for OH&S matters. Critical aspects for assessment and evidence required to demonstrate competency in this unit Compliance with OH&S licensing legislation. Emergency procedures and safety equipment, including the use of safety harnesses, energy absorbers, lanyard and anchor points. Assessment of ground conditions to confirm that the site is suitable (e.g. firm, level and safe) to extend and travel the elevating work platform. Approved Page 8 of 16

EVIDENCE GUIDE Risk assessment and hazard control strategies, including hierarchy of control as applied to the positioning and safe operation of the elevating work platform (particular awareness of the risks associated with overhead powerlines/electrical cables, ground conditions, wind, pedestrians and tipping). Appropriate procedures for estimation of loads, to ensure that the elevating work platform is not overloaded. Positioning and operation of the elevating work platform to ensure that the safest lift is performed. Approved Page 9 of 16

EVIDENCE GUIDE Context of and specific resources for assessment Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the endorsed Assessment Instrument. Assessment of performance must be undertaken either in the workplace or in a realistically simulated workplace. Assessors must ensure that the assessment in the workplace is organised to ensure that all the required equipment and materials and a suitable working area is made available to suit the assessment and the workplace. Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints. Assessment is to comply with relevant appropriate standard requirements. Applicants must have access to: Personal Protective Equipment (PPE) for the purpose of the Performance Assessment appropriate safety equipment in safe condition appropriate elevated working platform and associated equipment in safe condition communication equipment (e.g. two-way radios, mobile phones etc.) where applicable. Method of assessment Assessment must be conducted using the endorsed Assessment Instruments. These Instruments provide advice on their application. The use of 'simulators' in the assessment of this unit of competency is not acceptable. Assessment may be in conjunction with the assessment of other units of competency. Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge. Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstances, but is able to be transferred to other circumstances. Guidance information for assessment Further information about endorsed Assessment Instruments may be obtained from state/territory OH&S regulators. Approved Page 10 of 16

Range Statement RANGE STATEMENT The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Hazards Hazard control measures Appropriate standards Elevating work platform ground stability (e.g. ground condition, recently filled trenches, slopes) overhead hazards (e.g. powerlines, service pipes, trees, buildings etc.) insufficient lighting traffic (e.g. pedestrians, vehicles, plant) environmental conditions (e.g. wind, lightning, storms, etc.) other specific hazards (e.g. tidal areas, chainsaws, pressure washers, dangerous materials) Refers to the systematic process of eliminating or reducing the risk to personnel and property through the application of controls It includes the application of the hierarchy of control - the six-step preference of control measures to manage and control risk: 1. elimination 2. substitution 3. isolation 4. engineering control measures 5. using safe work practices 6. personal protective equipment codes of practice legislation Australian Standards manufacturer's specifications industry standards (where applicable) The operation of a telescoping device, hinged device, or articulated device or any combination of these used to support a platform on which personnel, equipment and Approved Page 11 of 16

RANGE STATEMENT materials may be elevated to perform work. Excluded from this definition are platforms of less than 11 metres boom length. The 11 metre boom length shall be taken to mean the greater of the following: (a) The vertical distance from the floor of the platform to the surface supporting the elevating work platform with the platform at its maximum height; or (b) The nominal reach, measured horizontally from the centre point of rotation to the outer edge of the platform in its most extended position Approved Page 12 of 16

RANGE STATEMENT Communication method Service logbook Procedures Safety equipment Safety devices Communication equipment Ground suitability verbal and non-verbal language written instructions signage hand signals listening questioning to confirm understanding appropriate worksite protocol any logbook service book history record system where the service and maintenance history is kept manufacturer's guidelines (instructions, specifications, operators manual or checklists) industry operating procedures workplace procedures (work instructions, operating procedures, checklists) safety harness energy absorber lanyard anchor points horns/sirens audible and visual reversing devices operator restraint devices (platform gate) lights (where applicable) two-way radios mobile phone rough uneven ground backfilled ground soft soils Approved Page 13 of 16

RANGE STATEMENT hard compacted soil rock bitumen concrete Approved Page 14 of 16

RANGE STATEMENT Stability Hazard prevention/control measures Relevant plant movements Best mobile practice Unplanned and/or unsafe situations Shut down deploying outriggers establishing correct size plates or packing correctly positioning plates or packing safety tags on electrical switches/isolators insulated powerlines safety observer used inside exclusion zone disconnected power traffic barricades and controls illumination requirements pedestrian controls trench covers movement of obstructions personal protective equipment suitable area for set-up suitable firm and stable standing raising boom lowering boom slewing hinging articulating telescoping minimum speed gentle acceleration and braking minimum boom/jib length avoiding ground depressions May include but not be limited to: loss of power failure of controls contact with overhead electrical conductors damage caused by contact with obstructions illness of personnel Approved Page 15 of 16

RANGE STATEMENT retracting boom/jib (where applicable) folding boom/jib into the transport position retracting outriggers/stabilisers idling engine to stabilise temperature turning off engine (where applicable) removing key from ignition (where applicable) Unit Sector(s) Not Applicable Approved Page 16 of 16