Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water.

Similar documents
It has almost been a hundred

Perched Box Caisson Overview. January 2014

Capt. Daley's Sea Stories

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services

Palm Beach State College. Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN

Ballast. Stability Lab Experiment. Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat.

Three Lines of Defence

With a team of highly qualified divers Vision offers a wide range of services including;

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico

UMass Boston Waterfront at a glance

Commercial Diving & Marine Services CAPABILITY STATEMENT.

CONTACT US 24/7 T E THE NETHERLANDS / ROTTERDAM T SINGAPORE / SINGAPORE T

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

Working Near, On or Above Water

Member Resource. Specification No.:CSDA-SA-117. Aptitude Test Member Resource No.: CSDA-MR-001 Effective Date: April 20, 2015 Revised: Title:

FALL PROTECTION AND RESCUE PLAN NS-MAYPORT BLDG RENOVATION PROJECT. (Revised Copy 11/19/2010)

An Ocean of Possibility

NOTICE OF PROPOSED CLASSIFICATION ACTIONS BY THE HUMAN RESOURCES DIRECTOR

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge

EXHIBIT A FALL PROTECTION POLICY

Gold Coast Barges-Vessel Information Sheet Vessel Name: 'ICEBREAKER'

1.0 PURPOSE AND NEED

Sensor Platform Project Marine Trials Bidders Conference. Fundy Ocean Research Center for Energy fundyforce.ca

OVERALL SURVEY: A survey intended to report on the overall condition of the hull structure and determine the extent of additional close-up surveys.

Rates and Charges Operative from 1st January 2019

SITE SPECIFIC SAFETY PLAN (SSSP)

SOLAR CONSTRUCTION SAFETY REVIEW QUESTIONS

NAVSEA STANDARD ITEM. 1.1 Title: Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

APPENDIX C DIVING. Section I. General

Scaffold-Less Rail Installation

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

Tug of War. Plasma Rope with Spectra Fiber Wins Battle for Strongest Towline in the Sea

Dynamic Positioning: Method for Disaster Prevention and Risk Management

LEGACY II TM STARTING PLATFORMS

ROCKSOLID SINGLE POST ANCHOR

2012 INDUSTRY DAY Society of American Military Engineers - Omaha Post

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Section Decanting Response Tool

New Jersey Division of Fish, Game and Wildlife Excerpts from REEF NEWS 1998

Installation and Operation Instruction Manual

2015 HDR, Inc., all rights reserved.

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Raising a Yagi Using A Tram Without the Need for Tag Lines

RESULTS FROM PARACHUTE SEA ANCHOR DRAG TESTS FOR A SPACE CAPSULE, Jan. 10, 2013

SILICA EXPOSURE CONTROL PLAN

OSHA's New Silica Rule Everything You Need to Know. Defined. Respirable Crystalline Silica Dust

Entry Level Assessment Blueprint Fundamentals of Construction

CHAPTER 6 OFFSHORE OPERATIONS

CHAPTER 44 NAVY DIVER (ND) NAVPERS A CH-70

GUARDIAN FALL PROTECTION

Barricades and Falling Object Protection Plans

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Section Decanting Response Tool

Environmental Health and Safety 2018 Catalog CONTENT :: COMPLIANCE :: TECHNOLOGY

ROOFING FALL PROTECTION 27.I

SOP GEN-007X Crane and Winch Operations

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FATAL AND SEVERE RISK PROGRAM

P O L Y I N F O R M Providing industrial and environmental safety

FITNESS, SAFETY & MEDICAL SUPPLIES

IMCA Competence Assessment Portfolio April 2016

3/4 SafeClaw Anchorage Connectors

Boat Restricted Zone (BRZ) Project Standing Order. The Dalles Navigation Lock & Dam

CHAPTER 4: INSPECTION PROCEDURES APPLICABLE TO VESSEL TYPES, CLASSES, AND CATEGORIES

Fall Protection at the Top of the Quarry Face

Cook Inlet pipeline crossing is about making the best choices

MOORING INFORMATION FOR BOAT OWNERS AT RGYC

The most versatile Fall Protection EVER

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

OSHA s Respirable Crystalline Silica Standard for Construction. OSHA Cranes & Derricks Subpart CC

Authors API Technical Report

DIVING SERVICES UK COMMERCIAL & RESCUE DIVING CONTRACTORS

(a) Calculate the speed of the sphere as it passes through the lowest point of its path.

Fall and Slip Prevention Test. 1. Fall protection is required in construction at and on scaffolds at.

Safety in Precast Erection

ROCKSOLID DUAL POST ANCHOR

Take the high road to ensure underground safety.

1 SafeClaw Anchorage Connectors

Fall Prevention Program

Conducting An Effective. Welcome!

APPENDIX G FEASIBILITY STUDY

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1

Taking Safety & Professionalism to New Heights!

Special projects are mainly capital equipment purchases and improvements to the inlet. Most improvements are cost shared with FDEP and FIND.

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

STANDARD OPERATING PROCEDURE Vessel Preparation and Deployment Process Okaloosa County, Florida

Fall Protection Introduction

Louisiana Energy Workforce Outlook. Stephen R. Barnes, PhD

{ } Jack Holland Page 1 of DOC

Safety Flash. IMCA Safety Flash 10/09 July Compact Fluorescent Lights Interfering with Communications Equipment

8. Fall Protection Procedures WAC

2016 OFFSHORE TRAINING AND ASSESSMENT SERVICES

Getting a. Bridge Built

Transcription:

Break in the Bahamas Cutters Head to the Caribbean to Wire Saw Sunken Pier A 25-foot by 25-foot steel pier section had sunk into the water.

CONCRETE CASES Divers were used to inspect the damaged structure and set up the cuts. On May 25, 2012, a large pier at a busy oil terminal in the Caribbean was struck by a tanker, causing severe damage to the structure. Part of the pier s dolphin platform was left protruding approximately 5 feet from the water while the rest had sank below the surface. Three months later, the situation worsened when Hurricane Isaac blew through and caused the entire pier to sink around 6 feet below water level. Millions of dollars were being lost while the pier was not in use, so it was important the owner quickly removed and replaced it. In addition, the structure had become much harder to spot by passing ships, making it more suseptable to collisions. Two CSDA contractors joined forces to provide a solution that would not only remove the damaged structure from the water quickly, but in a way that was safer than other demolition methods and preserved the natural environment around the sunken pier. Bahamas Oil Refining Company International Limited (BORCO) is the largest storage terminal facility in the Caribbean, with the ability to store, blend, transship and bunker fuel oil, crude oil and various petroleum products. Located off the southern tip of Grand Bahama Island in Freeport, the facility has a storage capacity of 21.6 million barrels.

A wire saw was positioned on a work platform 25 feet above the water. BORCO provides services for shipping trade from all over the world, so when the Cape Bari an 810-foot-long tanker hit the pier, the company began losing millions of dollars while the damaged pier was out of commission. A solution was needed and fast. Bahama Industrial Technologies (BIT) was approached by BORCO to act as general contractor for the job. BIT began searching for a company that had the equipment and expertise to cut underwater and remove the sunken damaged sections of the pier deck. The general contractor invited CSDA member ABC Concrete Cutting South Florida, located in Pompano Beach, to visit the terminal and come up with a plan to remove the sections. After performing a review of the site, ABC concluded that it would need additional resources for the job. The contractor reached out to fellow CSDA member Cutting Edge Services Corporation of Batavia, Ohio, and the two companies combined expertise to complete the work. Skip Aston [owner of ABC Concrete Cutting South Florida] and I go way back and hold each other in high regard, said Tim Beckman, owner of Cutting Edge Services Corp. He wanted our underwater wire saw expertise to supplement his team s work above the water, so we were happy to enter into the joint venture. The submerged pier was unstable and the bottom sat approximately 30 feet below the surface of the water. The top of the section would break the surface during low tide and be around 6 feet below surface at high tide. The damaged section consisted of a 1.5-inch-thick steel plate measuring 25 feet by 25 feet. The plate needed to be cut into three sections for a barge-mounted crane to lift it from the water and place on a work platform for disposal. The plate was connected to six 3-foot-high I beams, so cuts had to be made through each one to free the sections. The ABC/Cutting Edge joint venture planned to deploy a diamond wire saw system to cut the damaged pier sections. The remote-operated saw would allow divers to stay a safe distance from the unstable structure, while mobilization and setup times were much quicker than other methods. BIT had attempted to use underwater torches to cut the structure, but the process took too long and the financial losses for BORCO were mounting. A diving vessel with six divers and two crew members from Orion Marine was employed to support the work of the joint venture. Each day consisted of a 20-minute boat ride to the pier, where a work platform and crane barge were anchored in place. A modified WS25 wire saw from

CONCRETE CASES Each wire saw pull cut took around six hours to complete. Diamond Products was positioned on the work platform, standing 25 feet above the water. Divers entered the water and captured video to allow ABC/ Cutting Edge to assess the situation and create a game plan for the cutting work. Instructions were then given to the divers for the installation of the underwater pulleys, while the cutting team set up pulley stands on the work platform. Custom-fitted fenders were attached to some pulleys to prevent the wire from jumping off while cutting underwater. With the saw and pulley runs in place, divers began creating starting notches for the pulls using pneumatic power grinders. These notches were necessary, as the sunken plate was at a skewed angle underwater, making it difficult for the wire to get a bite on the steel. Diamond wire was run around the system, positioned in the notch and tensioned for the commencement of cutting. Crane rigging was also attached to the cut sections so that they could be lifted from the water once cut free. ABC/Cutting Edge used 140 feet of 10.3-millimeter-diameter (0.4 inches) wire from Tyrolit and ran the saw with 2,800 psi of pressure. Once the equipment and wire run was set up, each pull cut took approximately six hours to complete. Work commenced on September 10 and finished on October 1. Ships continued to dock at nearby piers while cutting was performed.

Notches were made in the steel to help the diamond wire get a bite on the structure.

Cut sections were loaded on to work barges by crane for disposal. The cut sections had spent months underwater in a damaged state. Joe Bland was ABC s project manager for the BROCO job. We selected Cutting Edge to take the lead on this project due to their vast underwater wire sawing experience, which worked out extremely well for everyone involved. More importantly, there was a mutual trust and respect between the two companies. This insured the project was completed in a timely fashion, to the best of our abilities and to the satisfaction of the customer. Working in the middle of the Caribbean may sound like an idillyc job location, but it was not without its problems. The team from ABC/ Cutting Edge experienced delays when rough, 6-foot seas interfered with the initial setup of the equipment and made the underwater environment very difficult for divers to operate. Working underwater generally makes for a challenging jobsite, whether it be due to the speed of setup or the movement of damaged structures as was the case with this job. Another challenge was the removal of one particular

One cut section required two cranes to stabilize it during removal.

section that was positioned directly underneath the existing structure. This section had to be rigged to two cranes to safely remove it from the water without colliding with work barges. Divers had all necessary PPE and workers on the platform were supplied with floatation devices, lanyards and harnesses. All personnel on the jobsite were briefed on the equipment and safety rails were put in place to prevent falls into the water. Gas detecting equipment was also used to ensure safe levels while cutting. I was extremely satisfied with the outcome of the job, concluded Bland. BIT was very pleased with our rapid response and our expedited mobilization. From the time that we looked at this job, we were able to mobilize and get all of our equipment through customs within a two week period. REVIEW AND COMMENT ON THIS ARTICLE AT: WWW.concreteopenings.com/FORUM.CFM Company Profile ABC Concrete Cutting South Florida is a division of Ohio Concrete Sawing and Drilling, Inc. and is based in Pompano Beach, Florida. The Florida division has been a CSDA member company since 2010, while the parent company has been a member for 31 years. ABC Concrete Cutting South Florida has 23 operators and 30 trucks. The company offers the concrete cutting services of core drilling, slab sawing, hand sawing wall sawing, grooving and grinding, polishing and crushing. Cutting Edge Services Corporation has been in business for over 15 years and is based in Batavia, Ohio. Support operations are located in Houston and Richland, Washington. The company offers primary services of engineered solutions, diamond wire sawing, underwater cutting and core drilling. Cutting Edge has been a member of CSDA since 1997, employs CSDA Certified Operators and is Level 1 Certified through the association s Company Certification Program. Resources General Contractor: Bahamas Industrial Technologies Sawing and Drilling Contractors: ABC Concrete Cutting South Florida Pompano Beach, Florida Phone: 954-523-4848 Email: joebland@abccutting.com Website: www.abccutting.com Cutting Edge Services Corporation Batavia, Ohio Phone: 513-388-0199 Email: beckman@cuttingedgeservices.com Website: www.cuttingedgeservices.com Methods Used: Wire Sawing