GENERAL. 1. Description

Similar documents
CURBSIDE ACTIVITY DESIGN

ROUNDABOUTS/TRAFFIC CIRCLES

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

PART A: IDENTIFICATION/LOCATION

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Roadways. Roadways III.

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Americans with Disabilities Act and Curb Ramps

S T A T I O N A R E A P L A N

9. TRANSIT ACCOMMODATIONS

complete streets design and construction standards public primer City of Edmonton

9. TRANSIT ACCOMMODATIONS

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

5. RUNNINGWAY GUIDELINES

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Active Transportation Facility Glossary

NJDOT Complete Streets Checklist

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II. North Glebe Road to 38 th Street N

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

INDOT Complete Streets Guideline & Policy

Segment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification:

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

ADA Training Standard Plans

ADA Technical Frequently Asked Questions

Chapter 2: Standards for Access, Non-Motorized, and Transit

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

District 4 Transit Facilities Guidelines

Chapter 10: Pedestrian Facility Design. ACCESS MINNEAPOLIS Design Guidelines for Streets & Sidewalks

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA VOLUME I - YEAR 2010 REVISIONS

Figure 5-1 Complete Street Zones. Roadside. May include frontage, pedestrian throughway, furnishings and curbside areas.

Off-road Trails. Guidance

Route 47 (North Main Street) Reconstruction

Preparing a Curb Ramp Project. December 15, 2010

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

ADA Operations Contact Info

INDEX. Geometric Design Guide for Canadian Roads INDEX

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

12A Accessible Sidewalk Requirements

PUBLIC REALM MASTER PLAN

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Copenhagen Cycling Map. Red Lines Cycling facilities

WORK ZONE TRAFFIC CONTROL PROCEDURES

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Shared Use Path Design

Site Improvements

On Road Bikeways Part 1: Bicycle Lane Design

SECTION 14: LANDSCAPING AND BEAUTIFICATION

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

GRTC PULSE. Arriving June 24, May 30, Overview by: Carrie Rose Pace Greater Richmond Transit Company Director of Communications

12A Accessible Sidewalk Requirements. 12A Protruding Objects

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

CALL-TO-ARTISTS. Issue Request for Qualifications. Artist Designed Bike Racks Downtown Investment District, Lancaster, PA

Driveway Design Criteria

10.0 CURB EXTENSIONS GUIDELINE

Unit Five : Driving In Neighborhoods

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

Eliminate on-street parking where it will allow for a dedicated bus only lane %

COMPLETE STREETS DURING CONSTRUCTION

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

MBTA Key Bus Route Improvement Program. Community Meeting Route 1 - Boston

What Is a Complete Street?

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Restoration Requirements

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

Chapter 6: Along the Street

Accommodating Pedestrians in the Work Zone

Van Ness Avenue Bus Rapid Transit

Arts Center Rail Station Accessibility Assessment

Steps to Conducting a Complete Streets Assessment

RZC Appendix 8A Marymoor Subarea Street Requirements

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

Tonight is for you. Learn everything you can. Share all your ideas.

Field Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)

Chapter 3 DESIGN SPECIFICATIONS

2.0 LANE WIDTHS GUIDELINE

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Planning Regionally With Transit

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

1.3 Pedestrian Environments

Prince George s County plans, policies, and projects

Section 7 Complete Green Street Guidelines DRAFT

Transcription:

GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Bus Stops in the design and construction of elements for Arlington County Horizontal Design Standards. This standard meets the County s guiding principles for increasing pedestrian safety and accessibility, decreasing county infrastructure costs and balancing the use of the Right-of- Way between all modes of transportation. 2. Related Arlington County Standards A. Arlington County Construction Standards and Specifications B. Arlington County Horizontal Standards H-3.3 Curb Extensions C. Arlington County Horizontal Standards H-X.X Sidewalks D. Arlington County Horizontal Standards H-X.X On Street Parking E. Arlington County Master Transportation Plan 3. Applicable Standards and Specifications A. Americans with Disabilities Act - Accessibility Guidelines for Building and Facilities (ADAAG) B. American with Disabilities Accessibility Guidelines for Public Rights-of-Way (PROWAG) 4. Quality Assurance A. Reserved 5. Submittals A. Design and placement of all bus stops shall be approved by both the DES Transit Bureau Chief and DES Transportation Engineering and Operations (TE&O) Bureau Chief DESIGN CONSIDERATIONS A. Purpose The purpose of a bus stop is to provide a safe, accessible, easily identifiable, and comfortable area for waiting, boarding, and alighting of bus passengers 1

B. Definitions 1. Bus Stop - A bus stop is an area used for the waiting, boarding and alighting of bus passengers, and the roadway area needed for the bus to service the stop. Bus stops typically include the street and curb space, sidewalk area, signing, and associated amenities for bus passengers. There are four general placement types for bus stops: a. Near side bus stop is located in advance of an intersection, before the crosswalk, in the direction of travel. b. Far side bus stop is located immediately beyond an intersection, past the crosswalk, in the direction of travel. c. Mid Block bus stop is located between intersections. d. Off Street bus stop is not located on the street. 2. Elements a. Signs post and sign panel (Flag) indicating the presence of a bus stop and used by the bus operator to gauge where to stop the vehicle. Also used to convey information to passengers. b. Boarding area an ADA compliant paved surface adjacent to the sign used by boarding passengers to enter the bus. c. Waiting area typically a paved surface within or adjacent to the pedestrian clear zone used for waiting passengers. The boarding area may be included within the waiting area. If provided bus stop amenities are located within the waiting area. d. Transit vehicle areas i. Stopping area The portion of the roadway used by the bus to stop and wait for the boarding and alighting of passengers. This can include in-lane stopping areas where the bus remains within the active travel lane including bicycle lanes. On street parking restrictions may be required. ii. Moving area The portion of the roadway used by the bus to approach and depart the bus stop. On street parking restrictions may be required if a curb extension is not present e. Back door alighting area - typically a paved surface within or adjacent to the pedestrian clear zone used by passengers exiting the rear doors of a bus. f. Bus pad - The bus pad is a concrete pavement area within the roadway at the bus stopping area to bring greater durability and longevity to the roadway pavement under frequent braking action by buses. A bus pad is not always an included element. 3. Amenities structures or devices that may be included at a bus stop for passenger comfort. a. Shelter A free standing structure including a roof at a minimum and may include weather protection panels on the front, rear and sides. A shelter is placed within the waiting area. b. Seating A structure located at a bus stop for passenger comfort. Seating may consist of either a bench or lean bar. 2

c. Lighting Lights located within or adjacent to the waiting area that are not part of the street lighting system. d. Heating may be provided for passenger environmental comfort or to melt ice and snow. e. Information Systems A static and or dynamic system providing additional passenger information. f. Fare Vending Equipment An electronic device used for the dispensing of transit fare media. g. Trash Receptacle A container for the deposit of trash or recyclables either free standing or mounted to a shelter. h. Bike Parking a structure, device or accommodation for the storage of bicycles. i. Publication Vending Area - area used for the distribution and vending of periodicals. C. Applicability PLACEMENT DESIGN These standards apply to all public transportation bus stops that in whole or in part occupy public rights-of-way or dedicated easements. A. Placement 1. The placement of a bus stop shall be determined through consultation with the TE&O and Transit Bureau chiefs to ensure compatibility and consistency with County transportation planning and operations. 2. Consideration for the placement of a bus stop include: a. Ridership demand, especially for seniors and persons with disabilities b. Bus routing and operations c. Vertical and horizontal sight distance d. Presence of sidewalks e. Available right-of-way f. Signalization and marked crosswalks g. Obstructions, such as utility poles, structures, and significant trees h. Adjacent property use i. Curb space use j. Traffic operations and safety k. Placement of nearby bus stops A. Elements 1. Signs Sign post shall be placed a minimum of 2 from back of curb. Sign panels shall be installed no lower than 7 from the bottom of the panel to the sidewalk. 3

2. Boarding area This area shall be 5 wide (parallel to curb) and 8 long(transverse to curb), connected to the pedestrian clear zone, located adjacent to the bus stop sign and may extend into the pedestrian clear zone. This area shall remain obstacle free. The maximum slope perpendicular to the curb shall be 2 percent. 3. Transit vehicle areas a. Stopping area This area shall be 40 long. If a bus pad is included it shall be a minimum of 40 long and the full width of the active lane width. b. Moving areas i. For near side bus stops this area shall be 60 long and located before the stopping area. (The stopping area plus moving area is 100 long.) ii. For far side bus stops this area shall be 30 long located after the stopping iii. area. (The stopping area plus moving area is 70 long.) For mid block bus stops this area shall be 90 long with 60 located before and 30 after the stopping area. (The stopping area plus moving area is 130 long.) c. Back door alighting area this area shall begin 14 from the sign and end 28' from the sign and shall be connected to the pedestrian clear zone. This area shall remain obstacle free. 4. Bus stops on curb extensions a. The minimum tangent length of a curb extension is 40 feet. Refer to Arlington County Horizontal Standards H-3.3 Curb Extensions for further information. B. Amenities 1. Shelter - The County has two standard styles of bus shelters. a. Type 1 Traditional Bus Shelter i. 12 long x 5 wide x 7 high ii. 12 long x 4 wide x 7 high iii. 10 long x 3 wide x 7 high for use in constrained settings b. Type 2 Modern Styled Bus Shelter i. 16 long x 5 wide x 7 high ii. 12 long x 5 wide x 7 high iii. 10 long x 3 wide x 7 high for use in constrained settings Bus shelter placement shall follow the layout options shown in Drawing No. BS- 1.0. In cases where recommended layouts are not feasible, bus shelters shall be positioned in such a way to maintain. a. Clear 5 wide route from the waiting area inside the shelter to the boarding area. b. Clear 5 wide route from the back door alighting area to the pedestrian clear zone. 4

2. Seating a. Seating shall be placed on a paved surface. This surface shall include a 3 x 4 area for wheelchair use and may be part of the backdoor alighting area. b. Seating placed outdoors shall not encroach upon the boarding area or the pedestrian clear zone. c. Seating placed within shelters shall not encroach upon the ADA accessibility of the shelter. An area 3 wide and the depth of the shelter shall be provided for wheelchair use within the shelter. d. It is preferred that seating not be placed closer than 3 from the curb or 6 from the curb if a travel lane is directly adjacent to the curb. 3. Lighting and Information Systems a. On a case by case basis two 2-inch HDPE conduits may be placed as required for future uses. 4. Trash receptacles Receptacles are required at all bus stops that have shelters. Trash receptacles are preferred at all bus stops. Only County approved trash receptacles shall be installed. In some locations blast resistant designs may be desirable. Trash receptacles shall not infringe upon the boarding area or the pedestrian clear zone. 5. Publication Vending Area A 2 x 6 concrete pad may be provided on a case by case basis. Vending storage shall not be located within the boarding area, back door alighting area, shelters, or the pedestrian clear zone. 6. Bus Pad - A bus pad may be included at bus stops with high frequency of service, e.g. greater than four buses per hour. C. Materials 1. The standard material used for bus stops is poured in place concrete. 2. Materials other than poured in place concrete may be used in limited installations on a case by case basis. 3. All alternate materials shall be ADA compliant. 4. Bus pads Shall be 10 thick reinforced concrete with welded wire fabric 6 x 6 W2.9 x W2.9 over a 6 aggregate base. 5

DETAILS 6

7