WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

Similar documents
SECTION P4 SEPARATION SYSTEMS

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

SECTION P4 SEPARATION SYSTEMS

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is

SECTION P4 SEPARATION SYSTEMS

GAS COMPRESSION SYSTEM

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM

OPERATING PROCEDURES

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

3(752/(80 SPECIALTY 3(752/(80 SPECIALTY 5(17$/,1& 5(17$/,1&

Practice Exam IADC WellSharp Driller and Supervisor

SINGER MODEL 106/206-RPS-L&H

NORMAL OPERATING PROCEDURES Operating Parameter Information

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

Lockout / Tag out Program

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

LOCKOUT/TAGOUT PROGRAM

Wellhead Safety Valve Control System (Wellhead Control Panel)

Kelsow Work Instruction. Subsea Well Control Hydraulic Panel Operation

Engineered solutions for complex pressure situations

Central Washington University

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Cased-Hole Logging Environment

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

Lockout/Tagout - Control of Hazardous Energy Program

Control of Hazardous Energy Lockout / Tagout Program

Disposal/Injection Well Pressure Test Report (H-5)

2/15/06 Nora Ghobrial

Lock Out/Tag Out Control of Hazardous Energy

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Lockout/Tagout - Energy Control Program

P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE

Rhino VE CE Bulk Unloader Operator s Card

THE OSHA LOCK-OUT/TAG-OUT STANDARD

Owner's Manual Sealweld SuperSeal II Pump

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Case History. North Sea Platform Wellhead Isolation Tubing Hanger Body Seals Locking Device 20-3/4 x 13-3/8 Mandrel Neck Seal

Lockout/Tagout Training Overview. Safety Fest 2013

The scope of this document

University of Arkansas Office of Environmental Health and Safety

Service Call: Procedure for Bleeding the Hydraulic Leveling System. Tools Required: S-Wrench 1/2, 9/16, 5/8, 11/16, & 3/4 Drain Pan

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

--- III. itti A. on_ coo. & EP Department DOCUMENT NO: WOC-HSE-ST Section H005 Hydrates

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

2 Sentry MCL Installation, Operation & Maintenance

BD Cytopeia Fluidic Kit User s Guide

LO/TO LOCKOUT/TAGOUT PROGRAM

GENERAL SPECIFICATION SAFETY

Bobtail DOT 407 / 412 Vacuum

Model: 43T. Bermad Pressure Relief Valve

Reverse Osmosis System Installation Guide and Operation Manual.

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

OPERATION AND MAINTENANCE MANUAL

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING

Oil Production with BPZ System A NEW APPROACH!

Intermittent Gas Lift Utilizing a Pilot Valve

Subsea Safety Systems

Standard Operating and Maintenance Instructions for Pumping System Model PS-150

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

WW-720. Pressure Reducing Control Valve

WELL NO: BJN-8. Lower master valve

Lockout Tagout Policy

Recommended Practice for Analysis, Design, Installation, and Testing of Safety Systems for Subsea Applications

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module:

Fiat - Argentina - Wheel Aligner / Headlamp Aimer #16435

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

The Discussion of this exercise covers the following points:

49004 Relief Pressure Check Kit for H8508 Series and HW1 Series Impact Wrenches

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules

! CAUTION! ! WARNING! General Information

OPERATION MANUAL NTF-15

Genie Supreme Model 123 Installation & Operation Instructions

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

OPERATION MANUAL NTF-60 Plus

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

THE UNIVERSITY OF NORTH CAROLINA

LOCKOUT/TAGOUT PLAN August 2015

Unit 24: Applications of Pneumatics and Hydraulics

H. Control of Hazardous Energy: Lockout/Tag Out

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

SECRETARY OF THE AIR FORCE 17 APRIL 2000 LOADMASTER MAFFS CHECKLIST. Summary of Revisions: Redundant pages removed.

WW-720. Pressure Reducing Control Valve

Temperature Controllers

Title: Control of Hazardous Energy Lockout / Tagout Program

Control of Hazardous Energy Program (Lockout/Tagout)

Waterous Relief Valve

Transcription:

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS The Wellheads, Flowlines and Gas Lift Injection Systems are designed to facilitate production from the reservoir to the platform s process systems. New completions, re-completions and changes in flow characteristics may cause frequent changes in the design and status of these systems. Thus, all personnel responsible for performing procedures listed in this Operating Procedures Section should be familiar with the following information, which is frequently updated in the platform s monitoring, testing and permit documents. Flowing Wells Shut-In Tubing Pressures (SITP) Flowing Tubing Pressures (FTP) Flowline segments on each well Gas Lift status of each well Operating ranges for each well Type of production for each well System each well flows to Maximum working pressure of all components Type of SCSSV (self-equalizing or not) Wireline retrievable Storm Chokes Wireline retrievable PB Valves Rev: 0 Date: 12/30/11 Page 1 of 5 CA 43 A

A. PRE-STARTUP PROCEDURE NOTICE: Refer to Preliminary Considerations in SECTION 3, PART A before beginning any start-up procedures. 1. Open the SCSSV (Surface Controlled Sub-surface Safety Valve) a. Verify that the manual wing valves and/or manual chokes are closed before opening SCSSV b. Ensure the SCSSV block valve on wellhead tree is open c. Verify that the Well Control Panel supply is at correct pressure d. Verify adequate level in the SCSSV hydraulic reservoir e. Verify ESD/TSE loops throughout facility have been charged up (pressurized) f. Verify the SCSSV selector valve is turned to Open for all wells that you want to place SCSSV in-service g. Pull the Pull to Reset Hydraulics relay at the Well Control Panel h. Verify that the hydraulic pump comes on and applies pressure equal to 1500# more than the well s SITP Adjust hydraulic pressure as necessary using regulator on Well Panel WARNING: SCSSV pressure should not exceed the wellhead tree MAWP. 2. Open manual Master Valve on the tree (if necessary) 3. Verify that the manual wing valves and/or manual chokes are closed 4. Open the Wellhead SSV/SDVs a. Bypass (and flag) pilots and open Wellhead Surface Safety Valves using the manual reset relay(s) at the Well Control Panel WARNING: Any operating parameter that is monitored by a safety device must be continuously monitored at all times while the safety device(s) are in bypass. The bypassed safety devices (indicators) must be flagged while in bypass and reset as they come in-service. REFER TO: Section 3 Part A for further details on bypassed devices. 5. Verify gas lift valve is open at wellhead injection line Rev: 0 Date: 12/30/11 Page 2 of 5 CA 43 A

6. Check the SITP (shut in tubing pressure) to determine if the SCSSV is open or closed a. If necessary, use a high-pressure pump (source) to apply pressure from the surface to equalize the SCSSV NOTE: Personnel should become familiar with the type of down-hole safety valve installed in each well: SCSSV is self-equalizing or requires pressure to be applied from the surface to equalize or SSCSV (storm choke) is installed. Rev: 0 Date: 12/30/11 Page 3 of 5 CA 43 A

B. START-UP PROCEDURES 1. Open an individual well for flow a. Open the manual wing valves or manual chokes in small increments over time (15 minute intervals) to pressurize the system b. Monitor pressures throughout the system c. Place the PSHL for the well flowline in-service when devices clear 2. Complete individual well start-up a. Verify production on the individual well has been increased to its normal operating range 3. Multiple well start-up a. Open additional wells to flow using the above outlined individual well procedures until full production is achieved 4. Immediately begin using Normal Operating Procedures to continue monitoring system REFER TO: SECTION 5, PART A Rev: 0 Date: 12/30/11 Page 4 of 5 CA 43 A

C. SHUT-DOWN PROCEDURES WARNING: These procedures apply when either a single well is to be shut-down or wells for a single separation system will be shut-down. If the wells to be shut-in will result in a platform shut-in, refer to Section 4 for the proper procedures. NOTICE: Refer to Preliminary Considerations in SECTION 4, PART A before beginning any shut-down procedures. 1. Close the manual wing valve(s) at the wellhead(s) 2. If necessary, push to close manual reset relay(s) at the Well Control Panel to close SSV/SDVs 3. Isolate each wellhead and flowline as necessary a. Close the manual master valve b. Close gas lift injection valve at wellhead c. Turn SCSSV selector to Close at the Well Control Panel d. Close the flowline header valves and flag them out of service 4. Depressurize each wellhead and flowline as necessary a. Slowly open a needle valve to bleed pressure to atmosphere and/or drain liquids into proper container between closed wellhead valves WARNING: Use appropriate fluid collection when draining components. NOTICE: If shut-down was performed as preparation for maintenance work, or if the cause of the shutdown requires corrective action/repair, continue with Lock Out/Tag Out (LO/TO) Procedures REFER TO: Fieldwood Safe Work Practices for LO/TO (Section D Chapter 5) (can be found on the Fieldwood SEMS Portal) Rev: 0 Date: 12/30/11 Page 5 of 5 CA 43 A