APPLICATIONS LODGED FOR MAJOR TRANSPORT UPGRADES

Similar documents
Community engagement guide May 2018

Auckland Transport s responses to feedback on proposed upgrades to the intersection of Mercari way and Don Mckinnon Drive

WHANGAREI IMPROVEMENTS

IMPROVEMENTS TO AUCKLAND S SOUTHERN MOTORWAY

Terwillegar Drive Expressway Draft Concept Plan

DYNAMIC LANES FOR AUCKLAND

About AMETI. Features and benefits. Stage One Panmure complete

CAMBRIDGE SOUTH WEST PARK & RIDE

Transport for Future Urban Growth Consultation Final report: South, North and North West

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Bristol City Council has produced a draft Bristol Transport Strategy document.

Regional Cycle Programme Update

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

Keeping you connected

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Submission Cover Sheet Mordialloc Bypass Project EES IAC

Wellington Public Transport Spine Study

Welcome to the McKenzie Interchange Project Open House!

CUERDEN TRANSPORT PROPOSALS

Congestion Management Report

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

2. Context. Existing framework. The context. The challenge. Transport Strategy

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

MARKHOUSE ROAD IMPROVEMENTS

Design Workshops Summary of all Feedback January 2017

Mill Hill Broadway Capacity Improvement

Welcome. If you have any questions or comments on the project, please contact:

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

Chelmsford City Growth Package

River Road - Proposed Road Safety Enhancement Measures

Frome Street Bicycle Route

122 Avenue: 107 Street to Fort Road

Route 29 Solutions Projects

Bus and Transit Lane Review Update

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Highway 217 Corridor Study. Phase I Overview Report

Copenhagen Cycling Map. Red Lines Cycling facilities

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Richmond-Adelaide Cycle Tracks

Washington DC Section of ITE Project Briefing

SH1 Western Belfast Bypass Transportation Assessment

Nottingham Cycle City Frequently Asked Questions

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Auckland Council Finance & Performance Committee Presentation

9. Parking Supporting Statement

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Welcome. Welcome to the second open house on the Downtown Transportation Study.

Land Transport Rule Setting of Speed Limits 2017

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Bay to Bay Boulevard Complete Streets Project

SH3 Waitara to Bell Block

RAA Submission to: The City of Adelaide Draft Integrated Movement Strategy Moving Adelaide

PETONE TO GRENADA LINK ROAD OPTIONS NORTH OF TAWA

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

ECONOMY PEOPLE ENVIRONMENT

Congestion Management Report

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Regional Bus Priority

Diagonal cycle crossing for signalised intersection. Axel Wilke ViaStrada Matthew Hinton Maunsell Daniel Newcombe Auckland City Council

Guide to travelling to and around Panmure April 2013

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Auckland Transport Monthly Indicators Report 2018/19

Auckland Transport Monthly Indicators Report 2018/19

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Public Event 1 Community Workshops

Tonight is for you. Learn everything you can. Share all your ideas.

About the AMETI transport projects

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

M6 Junction 10 Public Consultation

Strategy for Walking & Cycling Action Plan

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Readington Road (C.R. 637) Construction

US 1 Express Lanes Public Kick-Off Meeting

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

1. Provide a dedicated westbound approach bus lane at the intersection;

Feedback form. Let s get started. Waihi to Tauranga Corridor. You can

APPENDIX D. May 22, 2002 Open House Summary and Materials

Lea Bridge Road A street for everyone Tell us

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Geary Corridor Bus Rapid Transit

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

MILTON ROAD LLF PROJECT UPDATE

Proposed Project I 35 from Denton to Cooke County Line

Attachment A: Traffic Mitigation Measures

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Urban Street Design and Development

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Transcription:

PROJECT UPDATE February 2017 APPLICATIONS LODGED FOR MAJOR TRANSPORT UPGRADES Applications lodged and concept design complete for the Northern Corridor Improvements Project We re now one step closer towards beginning construction on one of Auckland s major transport projects after applications have been lodged with the Environmental Protection Authority (EPA) December 2016 in readiness for a hearing. This is a milestone for the project team who have been completing applications and concept designs for a suite of transport improvements on Auckland s Northern Motorway (SH1) and Upper Harbour Highway (SH18). The Northern Corridor Improvements include building extra lanes in both directions on SH1 between Upper Harbour Highway (Constellation) and Oteha Valley Road to reduce congestion and improve travel times. The project also includes a new direct motorway-to-motorway link from SH1 to SH18 to make it faster and easier to travel between the west and the north and access the Western Ring Route (see side story). The popular Northern Busway will be extended to provide a direct, uninterrupted route for buses up to Albany Bus Station. A new shared walking and cycling path will be built alongside the new Busway Extension from Oteha Valley Road in Albany, to Constellation Drive and then across and along SH18, connecting to the existing paths on Albany Highway. Locally, both the Constellation and Caribbean Drive intersections will be improved with additional lanes, and there will be a new bridge to connect Paul Matthews Road to Caribbean Drive, along with new motorway ramps to SH18. Pending statutory approvals later this year, we re on track to begin construction in 2018/2019. MORE TRAVEL OPTIONS The Northern Corridor Improvements Project (NCI project) is part of the Western Ring Route (WRR), a direct motorway route from the North Shore, to the west and south and Auckland Airport. The 2.4km Waterview Tunnel between Pt Chevalier and Mt Roskill is the largest section of the Western Ring Route, and is due to open in April 2017. Check out the NZTA website for more information on the Western Ring Route.

NEW TRANSPORT CONNECTIONS: HOW THEY WILL HELP YOUR JOURNEY Albany Expressway ALBANY Existing Paul Matthews Rd New Paul Matthews Rd Upper Harbour Highway Constellation Drive Caribbean Dr New Motorway Connection Northern Busway extension Walking & Cycling path CONSTELLATION DID YOU KNOW The NCI project is part of a bigger plan to provide an alternative motorway route through Auckland, known as the Western Ring Route (WRR). Once it s built, if you want to travel from Northland/Albany-Upper Harbour/Greenhithe to and from the western suburbs, Waterview Tunnel, Manukau and the Airport, you will be able to use the new motorway connection and stay on the motorway all the way. Having two options for motorway travel through the region using SH1 or the WRR means you can make choices at different times of day to decide which route is faster or more convenient. Travel information to advise on the best route to take will be available online and updated in real time on Variable Message Signs (VMS) along the motorway. The NCI project will also assist the surrounding Albany-Upper Harbour local road network. Traffic is expected to reduce on many local roads between 10-24% - including through the busy Constellation Drive interchange*. Bus services using the new Northern Busway extension will also be faster and more reliable, as they won t be held up in peak periods by roads and traffic lights. THE NCI PROJECT WILL HELP MOVE PEOPLE AND FREIGHT MORE EFFICIENTLY ON THE MOTORWAY, NORTHERN BUSWAY, AND SURROUNDING LOCAL ROADS AND WALKING AND CYCLING PATHS More lanes on SH1 will help ease congestion for both commuters and freight, even as the city grows. Buses can travel on the new Busway extension to avoid the need to merge with on/off ramp and motorway traffic. New shared walking and cycling paths will enable people to choose other, more active ways to get around. Two busy motorway/road interchanges will be improved. The existing roundabout at the Greville Road interchange will be upgraded and the Upper Harbour Highway/Constellation Drive interchange will have additional turning lanes and improved light phasing to reduce queuing on the off-ramps in the evening peaks. Traffic volumes will reduce significantly through the Upper Harbour Highway/Constellation Drive interchange, with a predicted 12,000 vehicles a day instead using the new motorway connection*. Several local road layouts will also be redesigned and made more efficient. Paul Matthews Road will be extended with a bridge over the new SH18 motorway, with new direct on and off-ramps to SH18 providing easy access to and from this important industrial hub. The Caribbean Drive intersection with Upper Harbour Highway/the new Paul Matthews Road will be widened, with additional lanes to improve this busy area. Drivers travelling east-west through these local road areas will experience faster journeys in peak times as a result, while regional travellers or freight using the new motorway connection to bypass the interchange and head north or west will also notice significant time savings*. *All time savings and figures are based on predicted traffic volumes in 2031. These predictions are sourced from the traffic assessment reports lodged in the NCI project s resource consent package.

WHAT S PLANNED KEY State highway ALBANY MCCLYMONTS RD OTEHA VALLEY RD SPENCER RD BRIDGE The Northern Busway will be extended from Constellation Bus Station, further north to Albany Bus Station. New state highway Walking and cycling shared path Busway extension Bus station ALBANY HIGHWAY 5km of shared walking and cycling path alongside SH1 and SH18. ALBANY EXPRESSWAY Extra motorway lanes on SH1 in both directions between Upper Harbour Highway (Constellation) and Greville Rd. GREVILLE RD Main road Secondary road ROSEDALE RD INDICATIVE TIMELINE 2017 Statutory approvals 2018 Construction start 2021/22 Construction complete Paul Matthews Rd will be a bridge over the new SH18 motorway lanes, with direct access to and from Constellation Dr, Caribbean Dr and the new SH18 ramps. BUSH RD PAUL MATTHEWS RD Direct motorway-tomotorway connection between the Northern Motorway (SH1) and Upper Harbour Highway (SH18) for traffic heading north and west. CONSTELLATION DR ALBANY HIGHWAY CONSTELLATION New SH18 motorway lanes connect to the existing SH18 motorway lanes at Albany Highway. UNSWORTH DR CARIBBEAN DR Local traffic will continue to use Constellation Dr and Caribbean Dr with upgrades planned at both intersections. SUNSET RD CITY CENTRE SHARED PATH BUSWAY SH1 SOUTHBOUND SH1 NORTHBOUND Typical cross-section of SH1 north of Rosedale Rd showing the proposed motorway lanes, Busway Extension and shared walking and cycling path.

NEWS & UPDATES WATCH OUR NEW VIDEO ANIMATION A video is now available on our website showing an animated fly-through of the project. Check it out at www.nzta.govt.nz/auckland-northern-corridor NEW SIGNS INSTALLED A new Western Ring Route logo and directional system has been installed across Auckland motorways, including our project area on the SH18 Upper Harbour Highway. In preparation for the opening of the Waterview Tunnel in April, the signs will help guide motorists and provide consistent information about the general direction they re travelling in. NEW BUS INVESTIGATIONS The preferred option for a new bus station location is still under investigation with our partner Auckland Transport more details will be included in our next update. The bus station is not included in the main NCI project but is being progressed in parallel. SHARED WALKING AND CYCLING CONNECTIONS The NCI project includes over 5km of shared walking and cycling paths which will run from Oteha Valley Road to Constellation Drive and then across and along SH18, joining up to the new cycle path on Albany Highway. Frequent access will be provided to the path (at least every 500 metres), connecting this new route to the existing local network. There will be plenty of space for walkers and cyclists with the shared path being 5-metres wide in most places (a 3-metre wide shared path with a 1-metre shoulder on either side). The path will be well lit at night with lots of connection points to provide safe access from the path in the event of an emergency. The access points will be ramps with a slight gradient to make it safe and easy for everyone to enjoy the path. WHAT TO EXPECT DURING CONSTRUCTION Construction is scheduled to begin in 2018/2019, and we re planning ahead to identify and manage potential disruption to neighbouring residents and customers using the local roads, motorways, buses, and walking and cycling paths. All affected property owners have been contacted by our project team to discuss the design and what it means to them. If you think your property is affected and haven t heard from us, please feel free to get in touch. A level of disruption is inevitable as we build such a big project, however successful and early planning will ensure the least inconvenience during construction. More information on what to expect will be included in our next update. PROPOSED UNSWORTH BRIDGE UPDATE Last year we consulted with the local community on a proposed local bridge connection from Unsworth Drive to Omega Street. While feedback from many community members was in support of the proposal; ongoing expert investigations determined that a bridge in this location is likely to encourage traffic, including trucks, to travel through this suburban neighbourhood. Design options for a bridge in this location also showed significant safety risks for motorists, pedestrians and cyclists. Therefore the Transport Agency has decided not to pursue the bridge proposal as part of the project. GEOTECH INVESTIGATIONS UNDERWAY You may have spotted members of our team wearing their high-visibility vests out on-site recently along SH1 and SH18. We ve been undertaking some early investigations to assess ground conditions so we know what to expect during construction. This will help inform our next stage of detailed planning.

THANK YOU FOR YOUR FEEDBACK We are grateful for the feedback received during our most recent consultation period, which ran from June to August 2016. Your valuable comments have been reviewed by the team and helped inform the concept design that has been lodged: YOU ADVISED US THAT: Keep impacts to local roads to a minimum during construction SO, WE HAVE: Designed our plans and timelines to ensure the least amount of disruption to drivers and public transport users, and committed to early and effective Improve the Greville Rd Interchange I m worried the project won t help with congestion around the Constellation interchange and along Upper Harbour Highway Improvements are needed at Caribbean Dr to reduce queuing There was general support for the proposed Unsworth Bridge link, however many of you also raised concerns about safety, increased traffic and industrial rat-running. You were keen for us to continue our investigations. We d like more walking and cycling opportunities and connections on the shared path Having wide shared walking and cycling paths is important to us We support a new walking and cycling bridge across SH1 at Spencer Rd, Albany In urban design feedback Use native planting where possible Make bridges and walls interesting Improve the treatment of stormwater run-off in our area We support an additional bus station to service the Busway Extension Improved the interchange layout and changed the roundabout on the eastern Greville Rd side to an intersection, with traffic signals to improve safety and reduce queuing. Confirmed a series of local road improvements that will improve journey times. Improvements include an upgraded intersection at Caribbean Dr/Paul Matthews Rd with direct access to on and off-ramps to SH18; improved traffic light phasing; and the addition of another left-turning lane on the SH1 off-ramp to Upper Harbour Highway heading west. The biggest improvement will come from the new motorway connection itself - thousands of cars a day will be removed from the Constellation interchange and will remain on the new motorway, heading north and west. Confirmed that Caribbean Dr will be widened with additional turning lanes to relieve pressure and reduce queuing. The new direct motorway to motorway link between SH1 and SH18 will also reduce traffic at the Caribbean Dr intersection many motorists will stay on the new link rather than using the local roads. The project team looked at this proposal in detail and assessed predicted traffic volumes, safety impacts and design challenges. The outcomes of these assessments and your concerns led us to a decision not include the bridge as part of the NCI Project. The predicted increase in traffic volumes was too high for this suburban environment, and there are safety issues with the visibility, stopping distances and gradients of the bridge for motorists, pedestrians and cyclists. More than 12 access points from local roads or reserves have been added to the design. We have been working closely with Auckland Transport to agree a 3-metre wide shared path, with 1-metre wide shoulders on either side along most of the route, to improve safety and passing distances. At least 12 local road access points are included. Proposed a new walking and cycling bridge across SH1 that will link the East Coast Bays/ Pine Hill over to Albany metro centre (from Spencer Rd to Corinthian Drive, close to the North Ridge Plaza). This will be progressed in parallel to the NCI project. Included extensive native planting in the project s Urban Landscape and Design Framework (ULDF), focusing on eco-sourced, native planted areas. We will work closely with our urban designers and iwi to incorporate artwork and other features to enhance the local environment and project area. Incorporated effective stormwater management treatment methods, including swales and wetlands to improve the current stormwater quality and enhance the local environment. We are continuing to investigate options for a new bus station located along the new Busway Extension, to be delivered in parallel with the NCI Project.

UNDERSTANDING THE STATUTORY APPROVAL PROCESS Notices of Requirement (NoRs) and resource consent applications were lodged with the Environmental Protection Authority (EPA) on 14 December 2016. As with other projects previously lodged with the EPA, the Minister for the Environment then considers whether the project is a matter of national significance and decides if it should be referred to a Board of Inquiry (BOI), Environment Court or referred to the local authority for consideration. The appropriate submission, evidence and hearing processes then follow. Should the Minister decide the applications are to be referred to a Board of Inquiry, the EPA publicly notifies the applications and a 4 week submission period commences. Key dates and more information will be announced on the EPA website after the Minister s announcement on www.epa.govt.nz/northerncorridor IN THE EVENT THAT A BOI TAKES PLACE, SUBMITTERS CAN CHOOSE Making a written submission. Making a written submission and speaking at the hearing. Submitters can do this themselves or have someone speak for them if evidence on oath is given. They can also get together with other submitters who have similar views. Making a written submission and presenting evidence through an expert witness. A witness may be an independent expert in a technical area, for example a planner who can interpret a plan. We are holding drop-in information days at the NCI Project Hub in March so you can learn more about the process and view the technical reports and drawings. These information days will be advertised on our website and in the North Shore Times. TYPICAL BOARD OF INQUIRY PROCESS LODGEMENT WITH EPA Dec 2016 EPA PUBLIC NOTIFICATION & SUBMISSIONS CAN BE MADE Feb-March 2017 HEARING Mid 2017 DRAFT DECISION FINAL DECISION Late 2017 APPEALS TO HIGH COURT (IF ANY) IMPLEMENTATION & MONITORING To request a translation of this newsletter, please email Kia whiwhi i tētahi whakamāoritanga o tēnei pānui, tēnā īmēra mai ki 如需该简报翻译版, 请发送电子邮件至 : 본뉴스레터의번역문을원하실경우, 아래주소로이메일을보내주시기바랍니다. Produced by the Northern Corridor Improvements project team, at the NZ Transport Agency. Phone 0800 NCI PROJECT, or email Sign up to our e-newsletter or find out more at www.nzta.govt.nz/auckland-northern-corridor