I-395 Express Lanes Northern Extension Project Public Hearings

Similar documents
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Washington DC Section of ITE Project Briefing

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Public Information Meeting

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

The following item was handed out at the December 6, 2018 NVTC Meeting.

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

Commuter Connections Regional TDM Marketing Group Meeting

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

I-66 Corridor Improvements Route 15 to I-495. November 2014

City of Fairfax, Virginia City Council Work Session

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

Fairfax County Parkway Widening Fairfax County

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

101 Corridor Managed Lanes

I-105 ExpressLanes Project

Public Information and Participation Comments

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

Capital Beltway HOT Lanes Project

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

VIRGINIA RAILWAY EXPRESS

Project Description Form 8EE

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

County of Fairfax, Virginia. Department of Transportation

395 Express Lanes Extension

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

What if YOU could help plan Northern Virginia s transportation future?

Transit and Rail Funding in the Commonwealth

DRAFT. Memo. Range of the Alternatives Considered in the EIS

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

Transportation Management Program Office Newsletter J U L Y

Preliminary Transportation Analysis

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

ITEM 15 Notice March 29, 2017

I-95/Temple Avenue Improvements Project Colonial Heights, VA

US 1 Express Lanes Public Kick-Off Meeting

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

2045 Long Range Transportation Plan. Summary of Draft

FM #: ETDM #: 11241

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Capital Beltway HOT Lanes - Frequently Asked Questions

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

Route 29 Solutions Projects

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Public Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

ARRENTON RANSPORTATION

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Highway 217 Corridor Study. Phase I Overview Report

Executive Summary June 2015

Shockoe Bottom Preliminary Traffic and Parking Analysis

Appendix D: Concept Screening

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

TECHNICAL MEMORANDUM. Introduction. Neighborhood Traffic Analysis. Vehicular Travel Times. Mitch Bonanno. Vornado/Charles E. Smith.

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

I-95 Transit/ TDM Study. LRTP Advisory Committee Meeting April 20, 2017

Alternatives Development Technical Report

Chapter 2: Alternatives

Foothill Expressway Improvements Between El Monte and San Antonio

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

North Coast Corridor:

Roundabout Feasibility Memorandum

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Regional Transportation Needs Within Southeastern Wisconsin

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Crystal City Citizen Review Council Meeting. July 10, 2013

Project Description Form 6V

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Joshua Jester, E.I., Florida Department of Transportation, District One

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Public Opinion about Transportation Issues in Northern Virginia

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Giles Run Connector Road

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Transcription:

I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of Transportation 1

Purpose of Tonight s Meeting Provide information and gain public input: Draft Environmental Assessment (EA) Design concepts including Eads Street improvement concept Key traffic findings Overall project update and schedule Opportunities to provide formal comments for the public record: Submit written comments on the comment sheet Provide oral comments following the presentation or to a court reporter

Existing Conditions Purpose and Need Lack of capacity and congestion on I-395 between Edsall Road and Washington DC Access challenges at the Pentagon Lack of capacity on Eads Street ramp Develop a transportation solution that: Reduces congestion Provides additional travel choices Improves travel predictability Improves roadway safety 3

Project Background Comprehensive Agreement executed in 2012 with 95 Express Lanes, LLC (95 Express) for 95 Express Lanes contemplated potential future development of the Northern Express Lanes in the I-395 corridor In November 2015, VDOT and 95 Express signed a Development Framework Agreement outlining roles and responsibilities The toll project will provide a long-term transit investment through an annual transit payment from toll revenues (at $15 Million minimum, escalated annually) 4

Atlantic Gateway: Partnering to Unlock the I-95 Corridor (FASTLANE/TIGER Grants) Virginia selected to receive $165 million dollar federal grant to improve more than 50 miles of the I-95/I-395 Corridor from Fredericksburg to the Pentagon. Extend I-95/I-395 Express Lanes North to the Pentagon (~ 7 miles) South to Fredericksburg (~ 10 miles) Improve commuter rail service on VRE and Amtrak Construct Third track in Fairfax County (~ 8 miles) Design Improvements to Long Bridge (Potomac Crossing) (~ 6 miles) Increase capacity on I-95/I-395 General Purpose Lanes Widen I-395 between Duke Street and Edsall Road Add new lanes across Rappahannock Expand bus service and commuter parking spaces in the corridor 5

Project Scope Expand and convert the two existing reversible High Occupancy Vehicle (HOV) lanes to three managed High Occupancy Toll (HOT) or Express Lanes for approximately eight miles from Edsall Road to the vicinity of Eads Street near the Pentagon Provide improved connections between the proposed I-395 Express Lanes and Eads Street Install signage, toll systems, and an Active Traffic Management System Provide sound walls 6

Typical Section 7

Express Lanes Access All existing access points to remain the same except for Eads Street Interchange Capacity and operational improvements at Eads Street Interchange under evaluation Seminary Road South facing ramp remains limited to HOV-only at all times 8

Eads Street Interchange and Pentagon Multimodal Improvements 9

Environmental Assessment Findings Environmental Resource Property Impacts Environmental Justice Land Use, Community Facilities, and Recreational Resources Cultural Resources Air Quality Noise Wetlands and Streams Floodplains Wildlife and Habitat Resource Summary No relocations or displacements. 5.3 acres of right of way acquisition and/or easements. No disproportionate impacts. No substantial impacts. No adverse effect. 5.91 acres of property may be impacted by noise barriers. No adverse impacts to ambient air quality and no violation of NAAQS. Impact to 2,857 noise-sensitive receptors. 8.1 miles of barriers have preliminarily been identified as being feasible and reasonable. Impacts to 0.004 acres of wetlands. Impacts to 0.09 acres of 100-year floodplains and 0.01 acres of 500-year floodplains. Minimal Impact. Threatened, Endangered, and Special Status Species No adverse effects to the Northern Long Eared Bat and the Dwarf Wedgemussel. Anadromous Fish Use areas mapped downstream of the study area may require time-of-year restrictions. 8 sites of elevated environmental concern. Sites will be managed and handled in accordance with Hazardous Materials federal, state, and local procedures. Minimal impacts since the proposed improvements are to an existing facility within existing right of way Indirect and Cumulative Effects in an environment that is highly developed. If right of way impacts occur to historic properties, the Section 4(f) use would likely be considered a de Section 4(f) minimis impact. 10

Noise Barriers within Alexandria Red barriers have been previously approved for construction as part of the I-395 southbound lane widening between Duke St. and Edsall Rd. 11

Noise Barriers within Arlington 12

Noise Barriers Under Construction Sample Completed Noise Barriers 13

Traffic Operations Results I-395 Travel Times Arterial Operations Minutes Minutes 60 40 20 0 60 40 20 0 Northbound I-395 - AM Peak Existing GP 2040 No Build GP 2040 Build GP 6-7 AM 7-8 AM 8-9 AM 9-10 AM Southbound I-395 - PM Peak Existing GP 2040 No Build GP 2040 Build GP 3-4 PM 4-5 PM 5-6 PM 6-7 PM 55 intersections evaluated Reduced number of intersections operating at LOS E/F Eads Street Interchange Improvements eliminates several deficient intersections 2 intersections have a LOS degradation to D or E in PM peak hour Average 6 8 minute travel time reduction 15% reduction in travel times 14 14

Northbound I-395 North of Glebe Road Origins AM Peak 15

Northbound I-395 North of Glebe Road Destinations AM Peak 16

I-95/I-395 Transit and TDM Study DRPT is leading the development of a new I-95/I-395 Transit/Transportation Demand Management (TDM) Study in coordination with key stakeholders including: Cities of Alexandria and Fredericksburg Arlington, Fairfax, Prince William, Spotsylvania and Stafford Counties Northern Virginia Transportation Commission (NVTC) Potomac and Rappahannock Transportation Commission (PRTC) VRE and WMATA 17

Project study area extends from the southern terminus of the I-95 Express Lanes (at Garrisonville Road) north to the Potomac River and includes: Parallel commuting corridors Alternative modes of travel Transit/TDM services, programs, or facilities that are being studied include those that: Use I-95 and/or I-395 and serve work destinations within the study area inside the Beltway (including downtown DC) Increase person throughput but do not use I-95 or I-395 Provide direct access to services in the corridor that increase person throughput or travel choices in the study area I-95/I-395 Transit/TDM Study Area and Markets 18

Existing Peak Period Travel In the A.M. peak period, there are 65,000 persons carried in 40,000 vehicles northbound 54% of the person trips are on the HOV lanes Transit vehicles are less than 1% of the vehicles but carry 12% of trips 19

Project Benefits Move More People 35-50% increase in traffic volumes in HOT lanes; relieves General Purpose lanes Move more than 13,000 more people in PM peak (north of Glebe Rd) Reduce Congestion Average 6 to 8 minute travel time reduction in General Purpose Lanes 15% reduction in travel times in General Purpose lanes Increasing capacity on I-395 reduces diversion of traffic to arterial roadways Expand Travel Choices Promote HOV throughout the day (currently no incentive to HOV during off-peak) Allow all motorists to continue north on the HOT lanes at Turkeycock Run or enter the southbound HOT lanes exiting DC Increase Reliability Reduce congestion in HOT lanes before and after current HOV restricted periods Improve Safety Increased capacity will reduce the potential for congestion-related crashes Increase safety at Eads Street interchange (eliminate southbound weave) Noise Mitigation Provide opportunities along corridor to mitigation noise 20

Key Milestones Key Milestones Begin Dates Public Outreach and Technical Coordination Ongoing Begin NEPA Environmental Assessment January 2016 Begin Transit/TDM Study April 2016 Public Information Meetings April 11 and 13, 2016 Public Meetings and Hearings October 24 and 26, 2016 October 27 (395 Widening) November 30, 2016 Regional Long-Range Plan Decision November 2016 Final Transit/TDM Study December 2016 Final NEPA Decision January 2017 Begin Construction 2017 Project Completion 2019 21

How to Provide Comments COMMENTS MUST BE RECEIVED BY DECEMBER 12, 2016 At the Public Hearings Submit written comments on the comment sheet Provide comments following the formal presentation or individually to the court reporter Mail Mail written comments to VDOT Northern Virginia District, Attn: Amanda Baxter, 4975 Alliance Drive, Fairfax, VA 22030 Email Email your comments or questions to 395expresslanes@VDOT.Virginia.gov Please reference I-395 Express Lanes Northern Extension in the subject line of all correspondence 22

I-395 South Widening Duke Street to Edsall Road I-395 Widen Southbound I-395 from 3 lanes to 4 lanes between Duke Street and Edsall Road Edsall Road Interchange Replace existing Edsall Westbound to I-395 Southbound Loop Ramp with new signalized intersection Duke Street Interchange Replace existing I-395 Southbound to Duke Eastbound Loop Ramp with new signalized intersection 23

Thank you Virginiadot.org/395express For more information and to sign up for updates 24