FireHalt TM Flexible Cavity Fire Barrier Systems

Similar documents
USG Ceiling Solutions. LOGIX Integrated Ceiling Systems INSTALLATION GUIDE

Women s Shirt Measure your best fitting shirt

Basket for Janice. by Beth Hester. GH Productions, Inc. The Basket Maker s Catalog

INSTALLATION & OPERATION MANUAL AORCS ATLAS OPERATING ROOM CEILING SYSTEM. Redefine your comfort zone.

Garment Styles Design Choices Modifications Measuring Guide

Domed Ceilings and Barrel Vaults

Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder

Stevenson Projects Building the Hull Top Deck and Bulkheads

RATLINER Assembly Instructions.

WFO-*P Series Floor Diffuser - Plenum installation and maintenance instructions

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Turks Head Walking Stick Part 3: Knot Construction Third and Final Pass

Wooden Dummy Construction

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

Hoist Ring Forged Hoist Ring Machined Hoist Ring (Metric) Hoist Ring Swivel Shoulder Eyebolts JD Weld-On Alloy Lifting

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

Body - May vary in shape, body beads may be present, and is constructed of electrolytic tinplate (ETP).

Butler Tactical Parachute Systems, LLC

Swing Your Partner. by Beth Hester. GH Productions, Inc. The Basket Maker's Catalog

Start: Stand with feet slightly wider than hip-width and knees bent in a slight squat position.

CBP LPU- 40 Flotation Collar User s Manual

IIHF GOALKEEPER EQUIPMENT MEASUREMENT STANDARDS

rondo aluminium components

IIHF GOALTENDER EQUIPMENT MEASUREMENT STANDARDS

Installation Guide Wall Mounted Angled Flagpole

Rope making machine VERSION 3.1. ShipWorkshop.com

INSTALLATION INSTRUCTIONS v1.7

LPU- 40 Flotation Collar

Single and Triple Rain Barrel Setup

Trampoline Installation Instructions

Boat Boat Loader Fitting Instructions

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

NAVIGATOR PROP BUILDING INSTRUCTIONS & PHOTOS

Ramp Hand-railing System. Complies with Building Regulations. Lockinex. ea i, ea u i

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

Start by crossing the two sticks or dowels at perpendicular or 90 degree angles.

INSTALLATION AND USAGE HANDBOOK

Melon-Shaped Egg Basket

PoolLock Easy Pool Cover

Design Guide. balloons.com

2. Crease halfway, making a mark. 5. Use mark from previous step to make this valleyfold. 8. Mountain in half. 9. Crease and unfold.

Features. Points to observe during use. SRT SRTB SRT-C Ratchets Pawls. Gears. Spur. Helical. Gears. Internal. Gears. Racks

California Building Code Effective January 2014 HOUSING ACCESSIBILITY BATHING FACILITIES Title 24, Part A

Combination Breathing Apparatus

Step 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the seam joint is.

Import Bike Rack OEM INSTALLATION MANUAL

Precision Duct Systems 4570 Commerce Cir SW Atlanta, GA Phone (404)

RANGER PROP BUILDING INSTRUCTIONS & PHOTOS

Straightaway 130. Sliding & Folding Door Systems. Product Overview. Features. Technical Specifications. Coburn Product Data Sheet

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Precision Rotary Ball Screw

Apple Basket with Swing Handle

Dynamic Cone Penetrometer SL970. Impact Test Equipment Ltd & User Guide. User Guide

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

SECTION 10iS: TAILCONE

Bob's Card Models and [Resources]

OCEAN - Wellness Line

Structural Design of Tank Weighing Systems

Make Your Own Bundled canes Revision Date: May 2014

Installation and Operating Instructions for Automotive Winch Synthetic Rope

BASIN AND WALL MIXER INSTALLATION INSTRUCTIONS

Infant Swing ( )

MSA Confined Space Entry Equipment

5 Training Sessions UNDER 12

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

F-1279-R UPPER RIGHT SKIN F-1280-R RIGHT SIDE SKIN F-1281-R LOWER RIGHT SKIN F-1208-R FUSELAGE FRAME

Constitution Instructions

IIHF Goaltender Equipment Measurement Standards

General Information. Related Documents Have the Operator Manual at hand for drill movements M Operator, CTA4000HD. Notations and Conventions

VK/VP SERIES : Sealless Vertical Pump. Assembling Instructions 2010

BUTTERFLY VALVES. Toll Free (877) - ICFLUID -2-

3M Liqui-Cel EXF-10x28 Series Membrane Contactor with ANSI or JIS Connections with Integrated End Caps

Troyer s Gourd Rack 8 unit F R H O P

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

LESSON 12: STATIONARY MOVEMENTS WITH THE M-1903 RIFLE

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

Intro: by firechim on October 3, 2013

U STAND INSTALLATION INSTRUCTIONS

GUIDE TO LAYING ARTIFICIAL GRASS

Trampoline & Enclosure Assembly Instructions

MEASURING INSTRUCTIONS Step-by-Step. Lazy-L Pools. Step #1: Measure the Width (A) and the Length (B)

Cat Fence Installation Instructions for Regular and Snow Protection Kits with Extra Posts. List of items shown

Practice 1 ALBERTA LACROSSE ASSOCIATION FULL YEAR PRACTICE PLANS PEE WEE. 5:30 Warm Up and Stretch. Emphasis on Sound Basics of the Overhand Pass!

Bull s-eye Levels and Screw-On Levels

SASK-A-POLE OWNERS AND USERS MANUAL

Overhead Irrigation Installation Guide DOM Copyright First Tunnels Ltd 2012.

Rigging it Right. Presented by Ron Barwick Service Manager for Half Hitch Hosted by: Bob Fowler

INSTRUCTIONS FOR CHAIN LINK INSTALLATION

User s manual for the SC32 and SC96 form-fitting recording chamber and microdrive systems

Shifting Lever. RAPIDFIRE Plus 11-speed

Chapter 8 Darts and pleats

200 / 300 Upgrade Kits

Basic Rowing Technique

Available Sizes (Both width and height are available in the 10mm unit.) Pull Cord Type (with limit stopper) 300~2000mm 400~2000mm 400~2000mm 6m 2

A-FRAME RESIN IN & OUT FLIP UP LADDER

Home Batting Cage. Assembly Instructions

ABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR U SERIAL No

Aliphatic Resin Wood Glue. 18" Fabric Parachute Part #PNC50 Part # Part #11700 Part #J0016. Launch Lug

Transcription:

ILLUSTRATION OF A FITTED ARRIER C VERTICAL SEAM A TOP FIX D SIDE FIX CUFF HORIZONTAL SEAM HORIZONTAL PLEAT E OTTOM FIX KEY NOTES AND TIPS TO REMEMER 1 All galvanised angle fitting should be continuous by overlapping a minimum of 300mm. 2 Staples used should be a minimum 12mm, galvanised. 3 Allow a 100mm overlap for the side fixing on the first piece. 4 Loose fixing the top fix allows for the vertical seam to be made. CUTTING THE ARRIER TO LENGTH efore cutting the barrier to length allow: a b c 100mm overlap for the top fix. 100mm overlap for the bottom fix. 100mm for the penetrations. (see relevant section) Page 1

QUICK REFERENCE 1 AFTER CUTTING THE ARRIER TO THE REQUIRED LENGTH, LOOSE FIX THE ARRIER TO THE TOP PERIMETER. 2 WORK THE ARRIER AROUND ANY SERVICE PENETRATIONS WITH HORIZONTAL AND PLEAT SEAMS. 3 FORM THE VERTICAL JOINT. 4 COMPLETE THE SIDE FIX. 5 FIT SUSEQUENT LENGTHS OF ARRIER AS REQUIRED. 6 COMPLETE THE TOP FIX. 7 COMPLETE THE OTTOM FIX. * Cuffs can be fitted as work progresses or upon completion. TOP FIX DETAIL 50mm galvanised stud is fixed to the soffit, the barrier is loose fixed to the stud. To complete the top fix a section of galvanised angle (25mm x 25mm x 0.5mm) is fixed to the stud, with self-drilling screws, trapping and securing the barrier with a 100mm overlap. A 1 Soffit 2 Suitable fixings @ 250 centres 3 100mm material overlap 4 Galvanised angle - 25mm x 25mm x 0.5mm 5 Self drill & tap screws 6 Galvanised stud - 50mm section 7 arrier Page 2

SERVICE PENETRATIONS Where a service or services penetrate the barrier a hole will be formed and require to be sealed. The operation is simple and effective with the use of a FireHalt Cuff. The first operation is to work the barrier around the penetration. The second operation is to cuff the penetration. Operation One: CUTTING & REJOINING THE ARRIER 1 Working from the short edge of the barrier, cut the barrier, 50mm below the horizontal centre of the penetration, from the edge to the vertical centre of the penetration. (drawing 1). 2 Feather cut a hole for the size of the penetration. (drawing 2). 3 Feed the barrier over and around the penetration smoothing the feathered sections toward the face. Lift the barrier to form a 50mm deep pleat extending from the uncut edge to the penetration hole. Staple the pleat in position. Pull the edges of the cut side together and form a horizontal seam. Work the barrier tight against the penetration with staple fixings smoothing out the feathered sections toward the face. (drawing 3). 1 2 A horizontal pleat seam is formed on the uncut side of the barrier (see seaming section). 3 A horizontal seam is formed on the cut side of the barrier (see seaming section). Page 3

SERVICE PENETRATIONS Operation Two: FITTING THE FIREHALT CUFF 1 The cuffs are a standard 1000mm and can be cut to size to suit the penetration circumference. When cutting the cuff to size ensure that a tab (120mm) is created on the cut edge of the flange. (drawing 4). 2 To determine the length required, wrap the cuff around the penetration to create a tight fit, add a further 70mm for seaming and cut. (circumference plus 70mm). 3 Wrap the cuff around the penetration working it so that the edges are in line with the horizontal seam. Staple the barrel of the cuff at 50mm centres to create a tight fit, leaving 100mm unstapled at the barrier end. (drawing 5). 4 Press the cuff flange against the barrier and fold the flange over the pleat seam. Secure with 12mm staples. (drawing 6). 5 Tuck the feathered sections under the cuff barrel and staple the remainder of the barrel seam for a tight fit with 12mm staples 6 Lay the upper flange tab over the horizontal seam and secure with two 12mm staples. Pull the lower flange tab over the horizontal seam and secure with two 12mm staples (drawing 7). 5 6 7 4 Page 4

HORIZONTAL JOINTS Horizontal joints are formed to extend the length of the barrier in a way that maintains the barriers overall performance. The horizontal joint is also used, in conjunction with a pleat seam for penetrations. The seam is achieved by pulling adjacent barrier edges together and stapling them into position. FIREHALT GOLD Double Safe Seam 1 Pull the two edges together to create a seam 50mm deep. 2 Staple the seam at 100mm centres with 12mm staples. This row of staples being 50mm in from the edge. 3 Insert a second row of 12mm staples 25mm in from the edge, midway between the first row of staples and the edge, at 100mm centres. The second row of staples being offset from the first row by 50mm. 4 The Double Safe Horizontal Seam is now complete. FIREHALT SF Turn ack Seam 1 Pull the two edges together to create a seam 50mm deep. 2 Staple the seam at 500mm centres with 12mm staples. This row of staples being 50mm in from the edge. 3 Turn back the barrier at 25mm and staple at 100mm centres with 12mm staples midway into the seam (12.5mm). 4 The Turn ack Horizontal Seam is now complete. Page 5

HORIZONTAL PLEATS Pleat seams are formed to keep the barrier length level on either side of a penetration. The short side, having been cut, will require a 50mm Horizontal Seam as detailed above. This will take 100mm out of the barrier length. To keep the barrier level a similar length needs to be taken from the other side. This is achieved by forming a 50mm pleat. This also takes 100mm out of the length of the barrier. FIREHALT GOLD Pleat Seam 1 Pull up the barrier and form a pleat 50mm in depth on the opposite side to the cut barrier. The crown of the pleat should be in line with the horizontal centre line of the penetration. 2 Staple the seam at 100mm centres with 12mm staples. This row being 50mm in from the crown of the pleat. 3 Insert a second row of 12mm staples 25mm in from the crown of the pleat, midway between the first row and the crown of the pleat, at 100mm centres. The second row of staples being offset by 50mm. 4 The Pleat Seam is now complete, which will balance the length of the barrier. FIREHALT SF Pleat Seam 1 Pull up the barrier and form a pleat 50mm in depth on the opposite side to the cut barrier. The crown of the pleat should be in line with the horizontal centre line of the penetration. 2 Staple the seam at 500mm centres with 12mm staples. This row of staples being 50mm in from the crown of the pleat. 3 Turn back the barrier at 25mm and staple at 100mm centres with 12mm staples midway into the seam (12.5mm). 4 The Pleat Seam is now formed which will balance the length of the barrier after a penetration. Page 6

VERTICAL JOINTS C Vertical joints are formed to extend the width of the barrier in a way that maintains the barriers overall performance. This is achieved by pulling adjacent barrier edges together and stapling them in position. FIREHALT GOLD Double Safe Seam 1 Pull the two edges together to create a seam 50mm deep. 2 Staple the seam at 100mm centres with 12mm staples. This row being 50mm in from the edge. 3 Insert a second row of staples 25mm in from the edge, midway between the first row of staples and the edge, at 100mm centres. The second row of staples being offset from the first row by 50mm. 4 The Double Safe Vertical Seam is now complete. FIREHALT SF Turn ack Seam 1 Pull the two edges together to create a seam 50mm deep. 2 Staple the seam at 500mm centres with 12mm staples. This row of staples being 50mm in from the edge. 3 Turn back the barrier 25mm and staple at 100mm centres with 12mm staples midway into the seam (12.5mm). 4 The Turn ack Vertical Seam is now complete. Page 7

SIDE FIX D The side fix secures the outer edge of the barrier to the main or secondary structure. SIDE FIX FIREHALT GOLD & FIREHALT SF 1 Leaving a 100mm overlap, trap the outer edge of the barrier between the main and secondary structure and a section of galvanised angle (25mm x 25mm x 0.5mm) with suitable fixings, at 250mm centres. 2 The galvanised angle should be continuous. If joined the overlap should be a minimum of 300mm ensuring a fix is made through the join area. Side fixing detail Page 8

OTTOM FIX E The bottom fix secures the lower edge of the barrier to the main or secondary structure. OTTOM FIX FIREHALT GOLD & FIREHALT SF Standard fixing: Drawing 1E 1 Creating a 100mm overlap, trap the lower edge of the barrier between the structure and a section of galvanised angle (25mm x 25mm x 0.5mm) with suitable fixings, at 250mm centres. 2 The galvanised angle should be continuous. If joined the overlap should be a minimum of 300mm ensuring a fix is made through the join. IE Fixing to a suspended ceiling: Drawing 2E 2E 1 Lay the bottom edge of the barrier adjacent to the T. 2 Creating a 100mm overlap, fix the barrier to the bulb of the T with wide headed, self-drilling screws at 200mm centres. Page 9