ROOFING & CLADDING IN WINDY CONDITIONS

Similar documents
Wind Tunnel Testing of Crossgrip Roof Walkway Matting

School of Engineering & Technology University of Hertfordshire Hatfield, AL10 9AB. Wind Tunnel Testing of Crossgrip TPO Roof Walkway Matting

Exploring Wind Energy


5200 Lawrence Place Hyattsville, Maryland 20781, USA Toll Free: Phone: Fax:

5200 Lawrence Place Hyattsville, Maryland 20781, USA Toll Free: Phone: Fax:

The following figure shows a 4-legged silo and the involved forces in presence of wind: F vw2 :

M&EE Networking Group

Bigtopmania; Wind Load Statement; Tents / Marquees / Temporary Demountable Structures; (Updated March 14 th 2017) (Copyright Bigtopmania)

Meteorology 2/6/2017. Wind, and its Interaction with Particle Plumes. Variation of wind speed with elevation. Variation of wind speed during the day

Turbulence and How to Avoid It

It s a Breeze! Integrated Processes Observing Collecting and recording data Identifying variables Comparing and contrasting Interpreting data Relating

markilux markilux Technical Information safe timeless beautiful markilux Collection Specification markilux 1700 markilux 1700 stretch markilux

Wind Energy for Kids

Environmental Definitions and Deployment Guidance for Instructors, Coaches and Leaders

Basic Mountain Flying

SAFETY 101: FALL PROTECTION: REDUCING FALLS DURING RESIDENTIAL CONSTRUCTION: RE-ROOFING FACT SHEET

LADDERS FIXED AND PORTABLE

AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

Causes and Characteristics of Windstorms in the Las Virgenes-Malibu Region

YEAR 1 WIND. Wind and Senses Student Activity (with worksheet)

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Jumping Jack Inflatables, Operations Manual Constant air (continuous air flow) Aquatic/Pool/Waterborne inflatables (WBI)

instructors official training aid APPROVED TRAINING AID

Schooner Adventure Water and Energy

Contractor / Exhibitor Handbook

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

Reaching new heights in Fall Protection Solutions.

Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome

Health and Safety Policy

STRUCTURAL DESIGN FIGURE INTERNATIONAL BUILDING CODE 288aR

Fig 2.17: Topographic model: snow-free area (Snow boundary = red) Contour interval of 1 m.

WIND CLIPPER KTS ILLUM SCALE INC DEC CLIPPER WIND SYSTEM

Vane Sailing School Part 2

Fire Safety Hot Work Permit Policy/ Procedures

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

ESSENTIAL SAFETY RESOURCES

Type: Policy. Working at Heights Policy. Register No: Status: Public. Developed in response to: Work at Height Regs 2007

RACE MANAGEMENT POLICY GUIDELINES FOR THE FINN CLASS MAJOR CHAMPIONSHIPS 2018.

Syllabus for Licensable Work with Asbestos (Category C)

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019

(Health, Safety, and Welfare)

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Conducting An Effective. Welcome!

Risk assessment part 1 of 3

A-License Information Packet

Safe Work Method Statement

Prevention of Falls and Working at Heights

Only launch your boat once you have a clear understanding of the most up-to-date weather forecast.

UNIVERSITY OF HONG KONG LIBRARY. Hong Kong Collection

FITA Coach s Manual. CLOUT ARCHERY Module. Intermediate Level

CIVL473 Fundamentals of Steel Design

Safe work method statements

TESTING APPLICATION STANDARD (TAS)

Installation & User Manual

Dear Mr. Nicolini: Qualitative Pedestrian Level Wind Assessment Montreal Road, Ottawa GWE File No.: DTPLW

CHAPTER 10 FALL PROTECTION

Temporary load-bearing support for structural alterations or repairs

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used

Guidance on Using Temporary Suspended Access Equipment

Representation Contract

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

Safety Tips from the WorkSafe People

LED LUMINATOR FLOODLIGHT TOWER Safety, operation & maintenance instructions 110V Original instructions

Roofing Adhesive PRODUCT DESCRIPTION PRODUCT DATA. Spray Applied Insulation Adhesive for Sarnafil Roofing Systems

In an emergency the safety of all personnel and the public is of priority.

Open Canoe Leader Training Notes

Contractors' Code of Safe Practice

Safety File. Contract Avonbourne School Prepared By Steve Steel Date 20 th July 2008

Review of Guidelines for Cycleway Safety Fencing

White paper. Fit for Purpose. Product Testing & Performance. Constant Force post system

CONTRACTOR SAFETY INDUCTION HANDBOOK

Loads on Structures. Dead Load / Fixed Load Live Load / Imposed Load Earthquake Load Wind Load Snow Load

Don t let a fall shatter your life!

Contractor handbook. Purpose

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Forced or Mechanical Ventilation - which uses mechanical supply and/or extraction to provide fresh air and is controllable.

Health and Safety Code of Practice. SCP38 Working at Height

RPE with a UK Standard Assigned Protection Factor 10 (APF10)

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Mini. Monkey Tower. Monkey Tower Mini User Manual. Scaffolding in Seconds Version 1.1 EN 1298 IM en 01/02/2012

White paper. Fit for Purpose. Product Testing & Performance. Constant Force post system

2.0 Management Systems and Documentation

HEALTH AND SAFETY MANUAL

New Mexico Institute of Mining & Technology. Fall Protection Program

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

To comply with the OHS Act, the responsible manager must carry out and document the following:

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

PERFORMANCE MANEUVERS

Reinstatement in hot-lay bituminous materials

KEEP THIS MANUAL FOR FUTURE REFERENCE. THIS MANUAL MUST BE MADE AVAILABLE TO THE USER/ASSEMBLER AT ALL TIMES.

Energy Utilisation of Wind

Transcription:

ROOFING & CLADDING IN WINDY CONDITIONS 3rd Edition

FORWARD Roofers must always be made aware of and understand the hazards which can overtake them whenever work is attempted or continued in windy conditions. This applies particularly when working upon industrial buildings where large area sheeting materials are being handled. The risks are increased considerably when gusts occur during periods of high average wind speeds. Edge protection provides very little security when the roofer is being carried away by a flying roof sheet. A sheet in a high wind can be as out of control and as dangerous as a car on a slippery road. It is not only in industrial building that care must be taken in windy conditions. The slater and tiler cannot work in safety when leaning against a high wind and a roll of roofing underlay caught by the wind can become extremely mobile, flexible and very dangerous. In Flat Roofing, reinforced bitumen membranes and single ply membranes are equally affected and the effect of high wind upon hot bitumen when it is being poured can be extremely dangerous. The responsibility placed upon the roofing contractor is not always easily understood, when it is necessary to stop or prevent roofing activities from taking place under conditions which are often acceptable for other building activities, e.g. Bricklaying, drain laying, plastering. For the roofing contractor, there has always been a requirement for a code of practice or a practical guide, to which reference could be make to assess the effects of high wind when working at heights. This guide should provide a satisfactory means of substantiating claims for extension of time. 2 IT IS RECOMMENDED THAT A REFERENCE TO THIS PUBLICATION IS MADE IN THE COMPANY SAFETY POLICY.

CONTENTS 1. Appreciation of the Problem 5 2. Purpose of the Publication 5 3. Roofing Work 5-7 3.1 Knots or m.p.h or m/s 3.2 Sheeting and Decking 3.3 Slating and Tiling 3.4 Reinforced Bitumen Membranes (RBM) 3.5 Mastic Asphalt 3.6 Single Ply Roof Membranes 3.7 Liquid Applied Waterproofing 3.8 Insulation Boards 4. Vertical Work 7 4.1 Cladding 4.2 Slating and Tiling 5. Safety Aspects 8-9 5.1 Wind Speed Variations at Height 5.2 Wind Speed Readings Taken at Place of Work 5.3 Wind Direction 5.4 Gusting 5.5 The Principal Contractor 5.6 Working with One Common Aim 5.7 The Beaufort Scale of Mean Wind Speeds 6. Practical Aspects 10 6.1 Hand Held Wind Meters 6.2 Reading at Place of Work 6.3 Taking Wind Speed Ratings 6.4 Obtaining Average (Mean) Wind Speed 6.5 Gusting Again 6.6 Local Weather Forecasts 7. General Safety 11 7.1 Other Trades 8. Contractual Aspects and Records 11 8.1 Keeping of Records 8.2 Daily Records to Principal Contractor 9. Conclusion 11 9.1 All Working Together 3

DESIGN AND PLANNING OF ROOFING WORKS A fundamental principle behind good roofing design is protection of the contents and inhabitants against wind forces. When wind strikes a building, it creates a positive pressure on the windward face and negative pressure over the roof and in the lee of the building. Distribution of pressure over a complete roof is far from uniform, still less the roof on a partially constructed building as all designers are aware. Particular consideration should be given by designers to relating the roof system to the terrain, location and sometimes the season in which roof construction is anticipated to take place so that the roof can be constructed in a safe and efficient manner. When designing a roof structure or covering, it is imperative that the issue of buildability is raised. At design stage, all Designers have a legal duty to reduce all risks that may be imposed upon operatives who construct, maintain or demolish roof structures. The responsibility placed upon the roofing contractor is not always easily understood, when it is necessary to stop or prevent roofing activities from taking place under conditions which are often acceptable for other building activities, e.g. Bricklaying, drain laying, plastering. To enable the preparation of the guide to take place, information was gathered from member companies. In collating and evaluating the information, technical assistance has been given to the Committee by The Met Office, the Building Research Establishment and the Health & Safety Executive; this publication is the result. The information contained in this document should be read in conjunction with the NFRC Safety Passport which covers many Health and Safety issues of site activities. HSE publication Health and Safety in Roofwork HSG 33, ISBN 0717614255 provides industry guidance and valuable information to anyone involved in Roofwork; whether a Designer, Contractor or Roofer. This guidance while not compulsory provides suggested courses of action when planning and undertaking roofing and following the guidance will normally be enough to comply with the law. Additional guidance can also be found in HSE information sheets and NFRC Profiled Sheet Roofing and Cladding The Guide to Design and Best Practice, which provides further advice relevant to industrial sheeting projects. 4

1. APPRECIATION OF THE PROBLEM The problems which arise when a Roofing Contractor is expected to continue to work on, Site under windy conditions are not always appreciated by the Architect, Engineer, Principal Contractor, Developer, Tenant or Client. 2. PURPOSE OF THE PUBLICATION The purpose of this publication is to lay down conditions under which working is not practicable or possible from the point of view of complying with current Safety Standards applied by the Health & Safety Executive. From detailed investigations the following recommendations are made. 3. ROOFING WORK 3.1 Miles Per Hour, Knots, Metres per Second and the Beaufort Scale The Table 1 below gives comparable speeds. M.P.H KNOTS METRES/ SEC FORCE 17 15 7.7 4 23 20 10.3 5 26 23 11.8 6 29 25 12.9 6 35 30 15.5 7 3.2 Sheeting and Decking a) All laying or handling of profiled single skin sheets at roof level should cease when the (average) mean wind speed reaches 23 mph (gusting to 35 mph or over). b) All laying or handling of sheets, longer than 5 m, at roof level should cease when the (average) mean wind speeds reach 17 mph (gusting to 26 mph or over). c) Where multi-skin constructions are in progress, all laying or handling of lightweight materials such as glassfibre, insulation boards, liner trays, etc., at roof level should cease when the mean wind speed reaches 17 mph (gusting to 26 mph or over). d) Special consideration must be given to the laying and handling of sheets exceeding 20 m in length. The above maximum wind speeds may be too high, as the surface area of the sheet may make it unwieldy in lower wind speeds. 5

3.3 Slating and Tiling a) All laying or handling of slates, tiles, battens and felt at roof level should cease when the (average) mean wind speed reaches 23 mph (gusting to 35 mph or over). b) When handling rolls of felt at roof level, extreme care should be taken when the mean wind speeds are in the region of 17 mph (gusting to 26 mph or over). 3.4 Reinforced Bitumen Membranes (RBM) a) All laying or handling of membranes and hot bitumen at roof level should cease when the mean wind speeds reach 23 mph (gusting to 35 mph or over). b) When handling rolls of lightweight membranes and/or working with hot bitumen extreme care is necessary when the wind speeds are in the region of 17 mph (gusting to 26 mph or over). 3.5 Mastic Asphalt a) All laying or handling of mastic asphalt at roof level should cease when the mean wind speed reaches 23 mph (gusting to 35 mph or over). b) All laying or handling of felt, Insulation boards or hot bitumen at roof level should cease when the mean wind speed reaches 23 mph (gusting to 35 mph or over). c) When handling rolls of lightweight felt and /or working with hot bitumen, extreme care is necessary when the mean wind speed is in the region of 17 mph (gusting to 26 mph or over). 3.6 Single Ply Roof Membranes a) All laying or handling of single ply membranes should cease when the mean speed reaches 23 mph (gusting to 35 mph or over). b) Laying or handling of lightweight vapour control layers and (inverted roofs only) water-flow reducing layers should cease when the roof level mean wind speeds reaches 17 mph (gusting to 26 mph or over). Decking panels of steel or timber composite (plywood or Oriented Strand Board) must not be laid when the roof level mean wind speeds reach 23 mph (gusting to 35 mph or over). Note that the load on a 2.4 m x 1.2 m sheet of plywood at 14 m/s (31 mph) is approximately 38 kg. 3.7 Liquid Applied Waterproofing All laying or handling of liquid applied systems at roof level should cease when the roof level mean wind speeds reaches 17 mph (gusting to 26 mph or over). 6

3.8 Insulation Boards The handling of insulation boards on a roof in windy conditions is especially dangerous as the as the board will act as a sail to catch the wind and could cause serious injury to the operative and the public work involving the handling of insulation boards should cease as soon as the boards become difficult or dangerous to handle. This may well be lower than the 17 mph that applies to other materials. 4. VERTICAL WORK 4.1 Cladding a) All fixing or handling of sheets more than 2 m above ground level should cease when the mean wind speed reaches 23 mph (gusting to 35 mph or over). b) All fixing or handling of sheets longer than 5 m when more than 2m above ground level should cease when the mean wind speeds reach 17 mph (gusting to 26 mph or over). c) Where multi-skin constructions are in progress all fixing or handling of lightweight materials such as glassfibre, Insulation boards, liner trays etc., more than 2 m above ground level should cease when the mean wind speeds reach 17 mph (gusting to 26 mph or over). d) Special consideration must be given when fixing or handling cladding sheets that are of exceptional length. The above maximum speed may be too high, as the surface area of the sheet may make it unwieldy in lower wind speeds. 4.2 Slating and Tiling a) Provided that this work is carried out from a safe working platform or safe scaffolding it should be possible to afford additional protection at the position of work which should render the limitations of working in windy conditions less significant than in the roofing situation. Although every situation should be considered individually as local conditions may increase the hazards. b) Where work is exposed and protection is not possible, then it will be necessary to apply the recommendations given under sections 3.3(a) and (b). 7

5. SAFETY ASPECTS 5.1 Wind Speed Variations at Height Fixing operatives must be made fully aware of the variations of wind speeds relative to the height at which work is being carried out. It is quite normal for wind speeds at ground level to be relatively low compared with wind speeds at other heights. 5.2 Wind Speed Readings Taken at Place of Work Bearing in mind the comments in 5.1, it is imperative that wind speed readings are taken at the actual place of work (e.g. at the eaves, at the ridge, 20 m high up the side elevation of a high structure, etc.) and the decisions taken in view of the conditions that prevail at that location. 5.3 Wind Direction Particular attention should also be given to the wind direction; there are many instances where surrounding buildings can create particular wind problems due to: a) additional wind pressure b) additional wind suction c) gusting winds higher than normal d) eddies or whirlpool effects e) aircraft vortex effects in proximity to airports, (e.g. greater vigilance required when landing and take off patterns change). In situations such as the above more time should be spent in assessing wind speeds as they apply /prevail at that location. 5.4 Gusting Companies must ensure that the fixers are made fully aware that gusts of wind can be significantly higher than the average wind speed (up to 1½ times the average speed in open, level country and as much as twice the average speed in city centres). 5.5 The Principal Contractor Companies should make sure that the Principal Contractor understands, before any work commences, the order in which the workforce will carry out the operations required in relation to the prevailing winds on site. 5.6 Working With One Common Aim It is in the very best interest of the industry and in particular for the safety of the operatives, that everyone works together with one common aim to apply these minimum standards, which are agreed as reasonable by the Health & Safety Executive and the Building Research Establishment. 8

5.7 The Beaufort Scale of Mean Wind Speeds For general information, set out in Table 2 are the relationships and descriptions of wind forces on The Beaufort Scale, at 10 m above ground level. These relate to mean wind speeds. Description Force 0 - Calm Calm; smoke rises vertical Force 1 - Light Air Direction of wind shown by smoke drift, but not by wind vanes. Force 2 - Light Breeze Wind felt on face; leaves rustle; ordinary vanes moved by wind. Force 3 - Gentle Breeze Leaves and small twigs in constant motion; wind extends light flag. Min m.p.h Max Min knots Max m/ sec. Min Max 0 1 0 1 - - 1 3 2 4 7 5.5 8 12 10 1 3 2 4 6 5 7 10 8.5 0.5 1.8 1.1 1.9 3.3 2.6 3.4 5.4 4.4 Force 4 - Moderate Breeze 13 18 11 16 5.5 7.9 Raises dust and loose paper; small branches are moved. Special care should be taken handling/ fixing materials over 5 m long - approaching critical limit. Care should be given when handling light weight insulation 15.5 13.5 6.7 materials. Force 5 - Fresh Breeze 19 24 17 21 8 11 Small trees in leaf begin to sway; crested wavelets form on inland water. Special care should be taken in roof and vertical work. Mean wind speed approaching critical limit when all work must cease. 21.5 19 9.5 Force 6 - Strong Breeze 25 31 22 27 11.1 14.1 Large branches in motion; whistling heard in telegraph wires, umbrellas used with difficulty. No fixing work anywhere should be in 28 24.5 12.6 progress. 9

6. PRACTICAL ASPECTS 6.1 Hand Held Wind Meters (anemometer) In order to ascertain wind speeds it is recommended that Supervisors and Foremen are provided with hand held wind meters. There are a variety of wind meters on the market. 6.2 Readings at Place of Work Reference to paragraphs 5.2 and 5.3 indicate that wind speed readings should be taken at the place of work. This is imperative; see comments in 5.1 wind speeds relative to height. 6.3 Taking Wind Speed Readings Care must be taken to ensure that the manufacturer s Instructions are fully observed for the instrument in use. 6.4 Obtaining Average (Mean) Wind Speeds In use, the windmeter is held with its axis vertical at arm s length and with the arm at right angles to the wind direction to ensure that the disturbance of the airflow, caused by the observer s body, is reduced as much as possible. At least two readings of mean wind speed (each reading being taken over at least 15 seconds) should be taken within the overall period of observation. When the readings differ by less than 10 mph the average is recorded. Should the readings differ by more than 10 mph then a third reading should be taken and the average of all three readings recorded as the mean wind speed. 6.5 Gusting Again Gusting can be 50% - 100% higher than average (mean) and due allowance must be made when laying or handling materials at any height 2 m or more above ground level. Maximum gusting speeds should be recorded during each reading. 6.6 Local Weather Forecasts The local area weather forecast can be obtained from Weathercall (an automatic telephone service) supplied by the Met Office. The forecast can be used for guidance about prospects for the day s work (and up to 5 days ahead) and whether it will be necessary to make any wind speed checks on site. Further information is available at www. metoffice.gov.uk. This information, however, should only be used for guidance. 10

7. GENERAL SAFETY 7.1 Other Trades Operatives must be made aware that when handling materials at height in windy conditions, there is an added responsibility to make sure that materials being handled and fixed cannot be blown from the roof creating safety hazards for other persons at ground level. Unfixed material left unattended should be secured. It should be remembered that sheet material blown from a roof can, in high winds, land on the ground at a considerable distance from the point at which it left the roof. 8. CONTRACTUAL ASPECTS AND RECORDS 8.1 Keeping of Records It is necessary to make sure the roofing operatives keep wind records as described whenever they cannot work for these reasons. The operatives should be issued with printed forms in duplicate, onto which can be recorded the date, the time, the number of fixers standing, wind conditions at both ground and roof level, and finally a signature. For an example, see table 2. 8.2 Daily Records to Principal Contractor A copy of the form referred to in 8.1 should be given to the site agent on the day following the day in question, with the remaining copy being sent into the roofing contractor s office. 9. CONCLUSION 9.1 All Working Together If the whole construction industry can work together on the subject of Safety in Windy Conditions, apply the rules laid down, prepare the documentations suggested, then the result is bound to be fewer accidents due to windy conditions, an increase in safety awareness and a general contractual benefit for all concerned. Health and safety concerns and Construction Safety should take precedence over normal contract conditions. The National Federation of Roofing Contractors does not accept any responsibility for any situations which may arise following the recommendations and suggestions given in this publication. This booklet is published in the belief that it meets an need in the roofing industry. It is intended to assist roofers in their tasks by serving to identify the wind conditions which make roofing work both impractical and hazardous to the safety of roofs, site personnel and members of the public. 11