NYCBS October 2015 Monthly Report

Similar documents
NYCBS September 2015 Monthly Report

NYCBS December 2015 Monthly Report

NYCBS August 2015 Monthly Report

March 2016 Monthly Report

Table of Contents. January 2016 Monthly Report

October 2016 Monthly Report

January 2017 Monthly Report

May 2017 Monthly Report

April 2018 Monthly Report

September 2017 Monthly Report

NYCBS January 2015 Monthly Report

November 2018 Monthly Report

January 2019 Monthly Report

NYCBS December 2014 Monthly Report

NYCBS November 2014 Monthly Report

NYCBS August 2014 Monthly Report

NYCBS April 2014 Monthly Report

NYCBS March 2014 Monthly Report

NYCBS January 2014 Monthly Report

NYCBS September 2013 Monthly Report

NYCBS October 2013 Monthly Report

NYCBS July 2013 Monthly Report

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

BICYCLE SHARING PROGRAM DEVELOPMENT. CUTR Webcast Series June 27, 2013

Planning Transit Operations and Bike Sharing Denver RTD. Bill Van Meter, Assistant General Manager, Planning March 23, 2012

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

Multimodal Transportation Plan

Village of Plainfield Design and Operational Guidelines for Outdoor Uses within the Public Right-of-Way

REQUEST FOR PROPOSALS TULSA BIKE SHARE SYSTEM APPENDICES

Rochester Area Bike Sharing Program Study

B. THAT Council direct staff to prepare by-law amendments to allow for Public Bike Share City-wide.

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

About Us. Boulder B-cycle is a community nonprofit (501c3) formed in May 2011 to implement, own and operate a public bikesharing system in Boulder.

1999 On-Board Sacramento Regional Transit District Survey

Minnesota Ballpark Authority Board Meeting Minutes October 11, 2018

GOLD COAST TRANSIT DISTRICT SHORT RANGE TRANSIT PLAN FY 2015 FY 2019 APPENDICES

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

EAST VILLAGE SHOPPERS STUDY A SNAPSHOT OF TRAVEL AND SPENDING PATTERNS OF RESIDENTS AND VISITORS IN THE EAST VILLAGE

STONY PLAIN ROAD STREETSCAPE

DRAFT. Table of Contents. Background

Paoli Road Improvement Feasibility Study

2012 Transit Study Randolph County

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

MASTER BICYCLE AND PEDESTRIAN PLAN

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Street Paving and Sidewalk Policy

Membership Rules & Regulations

Draft. Lecompton. Table of Contents. Background

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

TRANSPORTATION & ACCESS

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

Saturday 12:00 p.m 2:00 p.m Bicycle Pedestrian

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Most Important Part of any Plan

Chapter 5 Future Transportation

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

Regional Bicycle Share Program Knight Cycle. Every Day Counts Stakeholder Partnering Session NJDOT / FHWA August 4, 2017

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

Louisiana-Mississippi Bicycle Racing Association Bylaws

DRAFT. Lecompton. Table of Contents. Background

Membership Rules & Regulations

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Bicycle and Pedestrian Level of Service Evaluation

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Is St. Louis Ready for a Bike Share System? May 14, 2014 Public Open House

ADA TRANSITION PLAN. TOWN OF DeMOTTE

TAC February 1, 2012 Prepared by Metro Bike Program

TRANSPORTATION COORDINATOR ASSOCIATION (TCA) WEBINAR. BIKE SHARE ROLLS INTO PHOENIX! November 20, 2013

Sidewalk Cafe City of St. Petersburg City Code Chapter 16, Land Development Regulations

Project Application. Project Location: Salem Drive (Federal Route 1101)

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

Community Transit Solutions for the Suburbs APTA Annual Meeting Steve Fittante, New Jersey Transit Corporation September 30, 2013

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Lawrence Bike Share Feasibility Study

Bicyclist Signing Guidelines

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Overcoming the Challenges of Winter Bike Share. Phil Goff, Sr. Associate and Director of Bike Share Services 2/3/15

STAFF REPORT SAUSALITO CITY COUNCIL

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

BSR GPTC Z TR GM References and Reporting Page 1 of 8

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Bike Share Expansion P LANS A ND P ROGRAMS C OMMITTEE J UNE 1 6,

Chapter 3 DESIGN SPECIFICATIONS

Non-Motorized Transportation 7-1

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

WALK- AND bike-friendly TURLOCK

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Macon Tennis Association 2017 Championship Year League Regulations

RULES & REGULATIONS PERTAINING TO THE ADMINISTRATION OF A BICYCLE SHARE PERMIT PROGRAM BY PUBLIC WORKS. Effective Date: October 2, 2017

Chapter Four NON-INFRASTRUCTURE RECOMMENDATIONS. 5 E s. 5 E s. Education. Encouragement. Enforcement. Engineering. Evaluation

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

TRANSPORTATION & MOBILITY

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

TASCOSA GOLF CLUB MEMBERSHIP PLAN

City of Lima Bicycle Parking Guide

Set of plans containing details for game day operations of the Ballpark. Plans set forth the responsibilities and the specific actions of:

Transcription:

NYCBS

Table of Contents 1. Introduction... 3 2. Membership... 3 3. Ridership... 3 4. Environmental Impact... 4 5. Rebalancing Operations... 4 6. Station Maintenance Operations... 4 7. Bicycle Maintenance Operations... 4 8. Incident Reporting... 4 9. Customer Service Reporting... 4 10. Financial Summary... 5 11. Service Levels... 5 Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 2

1. Introduction NYCBS has continued to have high ridership in October due to good weather throughout the month. In October, Citi Bike riders took 1,212,269 trips and traveled a total of 2,505,898 miles. There were an average of 39,105 rides per day. On average, each bicycle in the system had approximately 5.31 rides per day. 9,949 annual members and 49,605 casual members signed up or renewed during the month. Total annual membership stands at 90,585, including memberships purchased from Jersey City billing zip codes. There were 450 active stations at the end of the month. Our average number of active bikes was 7,359. Fleet size at the end of the month was 7,080. NYCBS rebalanced 91,507 bicycles in October, averaging 2,952 bicycles moved per day. In October, there were 3,563 bicycle maintenance issues that were addressed through in-shop maintenance. There were 8 reported cases of vandalism (including graffiti) to the stations and bicycles. In October, there were 27,575 total customer service calls and 4,128 emails. We had approximately 2.27 customer service calls per 100 rides. The total revenue for October was $4,323,937. Of this total, $2,305,187 was from membership and user fees and $2,018,750 was from sponsorship. Year to date revenue was $32,142,954, at the end of the month, with $20,190,268 from membership and user fees, and $11,952,686 from sponsorship. 2. Membership Citi Bike had 9,949 annual members sign up or renew during the month of October. There were 45,545 one day memberships in October and 4,060 seven day memberships purchased. 3. Ridership There were 1,212,269 trips in October. Annual members accounted for the majority of trips, recording 1,065,761 trips vs. 146,508 trips for casual members. Citi Bike riders traveled a total of 2,505,898 miles with an average of 2.07 miles per trip. Ridership was generally higher on weekdays, but casual ridership was highest on weekends. October 8 th was the highest day for ridership with 50,178 rides. The most popular origins and destinations continue to be stations near large transit and tourist hubs, including the stations near Central Park, Penn Station and the Port Authority, Pershing Square, and the area around Union Square. As has been the pattern, the least frequented destination stations are in Brooklyn. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 3

4. Environmental Impact Citi Bike riders traveled 2,505,898 miles in the month of October. Citi Bike riders burned a total of 100,235,920 calories for the month. Using our calculation, we find that Citi Bike offset 1,303,067 pounds of carbon in October. 5. Rebalancing Operations NYCBS staff rebalanced a total of 91,507 bicycles during the month of October. In addition to our truck rebalancing, re-balancers using bicycle trailers moved bicycles near Grand Central Station, the Financial District, the Lower East Side, and the East Village. 6. Station Maintenance Operations There were 450 active Citi Bike stations at the end of October. Technicians made a total of 862 station visits to address dock and station field maintenance orders. There were 102 reported station malfunctions and 1,121 reported dock malfunctions. Reboots, battery swaps, and docking point repairs were the most common FMO types. Station uptime for the month was 99.93%. 7. Bicycle Maintenance Operations The bike shops at the Farley Building and Sunset Park completed 3,563 bicycle repairs in October. 7,847 total unique bikes were checked or repaired during the month. 8. Incident Reporting In October, there were 8 reported instances of vandalism to bikes and stations, including stickers, graffiti, and damage to stations or bicycles, which were addressed either by NYCBS field staff or a third party cleaning vendor. There were 10 crashes reported to Customer Service by Citi Bike Riders. 9. Customer Service Reporting In October, there were 27,575 total customer service calls in October. The NYCBS call center processed 23,682 calls with an abandonment rate of 3.50%. The overflow call center, which also takes overnight calls, processed 3,893 calls. Call volume for October was approximately 2.27 calls per 100 rides. At NYCBS, the average time to handle a call was four minutes and fifty-six seconds with an average hold time of sixteen seconds. NYCBS also received 4,128 emails. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 4

10. Financial Summary Revenue Categories October October YTD Membership: Annual $1,111,386.53 $11,216,362.51 Membership: Daily $452,355.77 $3,432,011.58 Membership: Weekly $101,912.00 $779,738.84 Overages: Annual $317,922.08 $1,046,963.20 Overages: Casual $552,377.32 $3,419,432.33 Other revenue $128,512.15 $459,918.08 Refunds and Discounts $(548,032.03) $(1,940,212.71) Taxes $188,753.42 $1,776,054.35 Sponsorship $2,305,187.23 $20,190,268.17 Total $4,323,937.23 $32,142,954.17 11. Service Levels Name 1 Station Cleaning and Inspection 2 Bicycle Maintenance 2a Bicycle Maintenance: Accrual Agreement Every Station, as well as all Bicycles present, must be cleaned, wiped down, and inspected at least one time between the first and fifteenth days of the month, and one time between the sixteenth and last days of the month. Every Bicycle in the Bicycle fleet (any Bicycle that appears in a Bicycle Fleet Level recording at least one time during the month) shall receive a Bicycle Maintenance check and cleaning at least once every calendar month. Prior to the earlier of completion of the implementation of the Ability to lock down bikes (with visual indicator) in the Remote Functionality Section of Appendix or 12 months from the Effective Date, 95 percent of Bicycles in the Bicycle fleet will receive a Bicycle maintenance check and cleaning at least once every calendar month. A Bicycle in the Bicycle Fleet that has not received at least one Bicycle Maintenance check and cleaning during a period of one calendar month plus seven days, except: Prior to the earlier of completion of implementation of the Ability to lock down bikes (with visual indicator) in the Remote Functionality Section of Appendix or 12 months from the Effective Date, a Bicycle in the Bicycle Fleet that has not received at least one Bicycle Performance Level goal 99.89% of the time. goal 99.94% of the time. NYCBS checked 99.94% of the Bicycle Fleet within two months and seven days. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 5

Name 3 Resolution of Station Defects Following Discovery or Notification 3a Accrual of Station Defects Following Discovery or Notification 4 Resolution of Bicycle Defects Following Discovery or Notification 4a Accrual of Bicycle Defects Following Discovery or Notification 5 Public Safety Emergency: Station Repair, De- Installation, Agreement Maintenance check and cleaning during a period of two calendar months plus seven days. Instances of deficient, damaged, or unclean Station components, or adverse conditions caused to the surrounding public property by the presence of the Station must be timely resolved following Discovery or Notification. Station Defects fall into the following severity classes, based on whether they are: (i) Defects Impacting the Area Surrounding Station (must be resolved within 24 hours); (ii) Defects Impacting the Usability of Entire Station (must be resolved within 48 hours); (iii) Defects Impacting the Usability of Specific Dock(s); (iv) Defects Impacting the Appearance of Station (must be resolved within 72 hours). Every individual instance of a deficient, damaged, or unclean Station component must be resolved within 7 Days of Discovery or Notification. Station Defects fall into the severity classes listed in SLA #3, above. Instances of deficient, damaged, or unclean Bicycles, or adverse conditions caused to the surrounding public property by the presence of Bicycles must be timely resolved following Discovery or Notification. For the purposes of this SLA, Wrenching of Bicycle by a user will constitute Notification, and removal of Bicycle from service by NYCBS will constitute resolution of defect. Defects related to Bicycles must be resolved within 48 hours if Bicycle is Wrenched, or 96 hours if Bicycle is not Wrenched. Every individual instance of a deficient, damaged, or unclean Bicycle must be resolved within 7 Days of Discovery or Notification. In the event of a Public Safety Emergency, a Station must be repaired, De- Installed, or Adjusted as soon as possible, but no later than 12 hours after Notification. Stations De- Installed for Public Safety Emergencies must be reinstalled within 72 hours after the end of the Public Safety Emergency, as determined by DOT. Performance Level NYCBS met SLA 3(i) at 81.25%, SLA 3(ii) at 99.00%, SLA 3(iii) at 99.11%, and SLA 3(iv) at 71.15%. NYCBS met SLA 3(i) at 100% SLA 3(ii) at 100%, SLA 3(iii) at 100%, and SLA 3(iv) at 88.46%. goal 87.84% of the time. goal 99.88% of the time. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 6

Name or Adjustment 6 Station Deactivation, De- Installation, Re- Installation, and Adjustment 7 Snow Removal 8 Program Functionality 9 Bicycle Availability 10 Never- Die Stations Agreement As directed by DOT, NYCBS must perform: (i) Station Deactivation(s); (ii) Station De- Installation(s); (iii) Station Re- Installation(s); (iv) Station Adjustment(s). DOT will provide a minimum of 48 hours advance notice prior to any of the above, except in instances where the continued presence/activity of the Station has been determined to pose a threat to public safety. Deactivated Stations must be reactivated within 24 hours of direction from DOT. De- Installed or Adjusted Stations must be reinstalled or Readjusted to their original configurations within 72 hours of direction from DOT. Following snow events, NYCBS must remove snow within 12 hours so as to maintain: (i) Parallel pedestrian clear path adjacent to Stations located on sidewalks and in plazas; and (ii) Perpendicular pedestrian paths through Stations where gaps in Docks provide pedestrian access. The Program is completely unavailable, such that no Program user can dock, undock, and Wrench Bicycles as intended, exclusive of planned Program outages for upgrades and maintenance as agreed upon by NYCBS and DOT and Program outages caused by an Event of Force Majeure. This Bicycle Availability requirement is met if the monthly average Bicycle Fleet Level, recorded once each Day of the month between the hours of 11:00 AM and 3:00 PM, meets or exceeds the required Bicycle Fleet Level. The minutes of Station Outage at each Never- Die Station shall not exceed three (3) percent of Station- minutes at that Station between the hours of 6:00AM and 12:00AM per month. This SLA shall be adjusted or suspended during snow events and at times when the City has implemented an emergency suspension of alternate side parking following a snow event. Performance Level There were no snow events in October. Average Bicycle Fleet Level exceeded the required Bicycle Fleet Level; NYCBS Never-Die Stations were available 96.89% of the time to users within active time. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 7

Name Agreement 11 Rebalancing No individual Station Outage shall continue for longer than 4 hours. Damages will not accrue between the hours of 10:00PM and 6:00AM. 12 Availability of Data and Reports (i) Real- time Program data (i.e., JSON feed) will be accurate and available to the public at all times. In addition, the following data sources will be furnished to DOT: (ii) Real- time, read- only access to data as per the Functional Specifications; (iii) Real- time, read- only access to any databases or other record- keeping sources used by NYCBS to manage and operate the Program, including but not limited to all data sources required to determine compliance with the service levels incorporated herein; and (iv) A monthly report as required by Appendix G, "Reporting Requirements." Performance Level NYCBS station outages during active time were resolved within 4 hours 95.97% of the time. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 8