U.S. Army Corps of Engineers

Similar documents
Estimated on-the-ground start and end dates: 1 June October 2018

U.S. Army Corps of Engineers (USACE) P.O. Box 428 Smithville, MO

DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP)

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

JadEco, LLC PO BOX 445 Shannon, IL 61078

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Pickwick Lake 2018 REEL FACTS Trevor Knight Fisheries Biologist (662)

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

LAKE TANEYCOMO 2012 ANNUAL LAKE REPORT. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region

Leech Lake Update 5/20/2009 Walker Area Fisheries Office State Hwy. 371 NW Walker, MN

TABLE ROCK LAKE 2014 ANNUAL LAKE REPORT. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region

Quemahoning Reservoir

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Lake Seminole. and Waters Bordering Georgia and Alabama

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

Overview of Recreational Pond Management

Previous Stocking Black crappie. Channel catfish. Cutbow. Rainbow trout. Saugeye Black crappie. Channel catfish. Cutbow.

Regulations. Grabbling season May 1 July 15; only wooden structures allowed.

FISHERIES MANAGEMENT. Georgia Freshwater Fisheries. Department of Natural Resources Wildlife Resources Division

During the mid-to-late 1980s

Lake information report

Busse Reservoir South Lateral Pool Population Survey

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Critical Habitat. Those who contributed to this research are:

CARL BLACKWELL LAKE MANAGEMENT PLAN

2015 Annual Report. February 15, 2016

Aquatic Plant Management and Importance to Sport Fisheries

Introduction: JadEco, LLC PO BOX 445 Shannon, IL 61078

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Tunica Cutoff 2018 REEL FACTS Keith Meals Fisheries Biologist

Arrowhead Lake Population Survey

Management Plan for the Obey River Trout Fishery

SKIATOOK LAKE MANAGEMENT PLAN

Michigan Dept. of Natural Resources Status of the Fishery Resource Report Page 1. Weber Lake Cheboygan County, T34N, R3W, Sec.

OKLAHOMA BASS TOURNAMENTS 2011 ANNUAL REPORT

CITY OF MADISON PROPOSED PROJECT. Wingra Park Shoreline Repair

Maple Lake Population Survey

Go Fish Education Center

Current Status and Management Recommendations for the Fishery in the Cloverleaf Chain of Lakes

About Rend Lake Marina:

Pennsylvania Fish & Boat Commission Biologist Report. Wilmore Dam. Cambria County. May 2011 Trap Net, Electrofishing and Hoop Net Survey

LAKE TANEYCOMO 2011 ANNUAL LAKE REPORT

Pascagoula River Marsh 2018 REEL FACTS Stephen Brown Fisheries Biologist

Tampier Lake Population Survey

HARBOR INFRASTRUCTURE INVENTORIES Lorain Harbor, Ohio

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Kemper County Lake 2019 Reel Facts Trevor Knight Fisheries Biologist (662)

Lake information report

Crawford Reservoir. FISH SURVEY AND MANAGEMENT INFORMATION Eric Gardunio, Fish Biologist Montrose Service Center

Nicholas Brown. 31 Bennett Rd Wolfeboro NH Application submitted

North Carolina Wildlife Resources Commission Agency Overview. Appropriations Subcommittee on Natural and Economic Resources February 22, 2011

Quarry Lakes Fisheries Report EBRPD Fisheries Department. Joe Sullivan Fisheries Resource Analyst Peter Alexander Fisheries Program Manager

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

An Assessment of the Fish Community in Lake Acworth

Pascagoula River Marsh 2017 REEL FACTS Stephen Brown Fisheries Biologist

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

BASS LAKE PLANNING UNIT Willow Creek Watershed

Ross Barnett Reservoir 2019

Cedar Bluff District Fisheries Kansas Department of Wildlife, Parks, and Tourism Fisheries Section

2016 Field Survey Oneida Lake / Three Mile Bay WMA SLELO-PRISM Early Detection Surveillance

OKLAHOMA BASS TOURNAMENTS

RHODE ISLAND. Foundation. P.O. Box 1465, Coventry, Rhode Island FAX:

Columbia Lake Dam Removal Project

Ross Barnett Reservoir 2018

Of the following, which best describes you?

Area Fish Stocking. Area Happenings

Prewitt Reservoir LAST UPDATED: JANUARY 2016 FISH SURVEY AND MANAGEMENT DATA Mandi Brandt - Aquatic Biologist (Brush)

Rolling Knolls Pond Population Survey

HOT SPRINGS VILLAGE LAKES

FINAL Caples Lake Fisheries Management Plan. Version 4.0

Keep it Clean Report 2018

Claytor Lake View of the Claytor Lake dam from Claytor Lake State Park s boat ramp.

REEL FACTS. Regulations. Limblines Fishing with limblines and set hooks is prohibited at Lake Washington.

Franklin County Ranch Hunting, Fishing, Recreation, Cattle Hardwoods, Lakes, Ponds, Waterfowl Habitat, Pastures

May 12, Dear Superintendent Kimball:

Engbretson Underwater Photography Traits of Ineffective Cribs

Bode Lake - South Population Survey

SOONER LAKE MANAGEMENT PLAN

North Carolina Wildlife Resources Commission. Gordon Myers Executive Director North Carolina Wildlife Resources Commission

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Starry Stonewort (Nitellopsis obtusa) Removal Using Diver Assisted Suction Harvesting

Wampum Lake Population Survey

Exploring the relationship between native smallmouth bass and invasive mussels in the Huron Erie Corridor

NE Region 2017 Fishing opener report

Reflections on a Decade of Habitat Restoration Efforts in the St. Clair Detroit Rivers System

DOWNLOAD OR READ : THE TROUT FISHERMEN PDF EBOOK EPUB MOBI

Recreational Saltwater Fishing Industry Trends and Economic Impact January 2007

Fall Fishing in the White Mountains By Diane Tilton, AZGFD

O Malley s Ponds Population Survey

Guide to McDuffie PFA

Osprey Point Fort Meade, Florida

Lee E. Harris, Ph.D., P.E. Assoc. Professor of Ocean Engineering. Doug Bowlus and Ashley Naimaster Ocean Engineering Graduate Students

2014 Lake Shelbyville Eco-Meet

LOGAN MARTIN RESERVOIR MANAGEMENT REPORT. Prepared by. E. Daniel Catchings District Fisheries Supervisor

Lake Taneycomo Fisheries Management. Shane Bush : Fisheries Management Biologist

Chattahoochee River Restoration

Green Lake Population Survey

Summary of 2012 DNR and Partners Fisheries Surveys in St. Clair/Lake Erie and Fishery Forecast for 2013

Transcription:

A. U.S. Army Corps of Engineers Kevin Parsons, Natural Resources Specialist 500 Resource Management Drive West Point, GA 31833 706-645-2937 Kevin.M.Parsons@usace.army.mil B. Underwater Structure Enhancement for West Point Project West Point Lake, Southern Appalachians Region 3 rd Congressional District of Georgia June 1, 2016 September 30, 2016 Georgia Department of Natural Resources, Georgia BASS Nation, Troup County High FFA C. 1. The purpose of this project is to enhance the underwater structure, or lack thereof, by planting American Water-willow as well as adding artificial habitat and fish attractors to various locations around West Point Lake (WPL). Currently, WPL has limited structure for fish species to utilize. While there is moderate structure around the lake this can be improved upon greatly. The plan for WPL, with the help of the Georgia Department of Natural Resources (GA DNR) and the Georgia BASS Nation (GBN), is to plant 25 American Water-willow sites. American Water-willow is a perennial non-invasive plant that is native to Georgia. It is a rooted plant that grows in shallow water usually from the shoreline out to about five feet deep. It provides great habitat for juvenile and adult fish of many species and can help stabilize shorelines. Once it is established it can spread to other areas from seed or by breaking loose and rooting elsewhere. This will help establish new areas of habitat. Once the America Water-willows are planted, they will be wired down to prevent them from being uprooted until they are established. Several sites have already been planted and around 70% have taken root and are doing well. The GA DNR has planted American Water-willow on several Georgia Power Lakes, which include Lake Oconee and Lake Jackson, and on Lake Richard B. Russell which is a Corp of Engineers lake. GA DNR has had great success on these bodies of water. The second part of this project is to build around 200 fish attractors out of bamboo, five gallon buckets, and concrete with the help of volunteers from Troup County High FFA Organization. Once the attractors are built, they will be taken by boat to designated locations that need structure added to them. Some of these areas are marked with buoys that read Fish Attractor on the side, while other areas need to be marked with new fish

attractor buoys. Each area designated will support approximately three to five surface acres at depths around 20 to 30 feet. 2. This project has three main goals. The first goal is to provide fish species with needed habitat that will enhance the fish population. Second, planting Water-willow and installing fish attractors will help entice more fishermen to utilize WPL and help the local economy. The third goal of this project is to have local high school students volunteer which will stimulate students interest in the outdoors and natural resource management and encourages them to consider careers related to natural resources. Several high school bass fishing teams have already volunteered with planting Water-willow on West Point Lake. In addition, the Troup County High FFA has assisted rangers in the construction of artificial habitat. To monitor the sites, down and side scan sonar will be used to check fish numbers around the structures at least once a month for a one year period. Sonar will also be used to determine if additional structure needs to be added to the sites. D. 3. By having local high school students volunteer they will have a better knowledge and understanding of fish behavior and habitat requirements. Students will also be able to fulfill requirements for organizations that they are members of, such as FFA. Since WPL is considered by many to be a fishing lake, the addition of attractors will only encourage more fishermen to visit the area. As a result the local economy will benefit from these fishermen staying in hotels around the area, staying in campgrounds, buying bait and tackle, groceries, fuel, purchasing fishing licenses, and eating at local restaurants. A 2007 study found that WPL attributes $535 million each year to the region s economy and is the biggest tourist attraction in the area. 4. Sites that do not have buoys to mark them will be marked so. This way fishermen and boaters in general, will be aware of underwater structure on WPL. The sites will be monitored to determine if and additional structure is needed on a yearly basis. 5. No special permits are required. 6. The start of this project is June 1, 2016 and is to be completed before September 30, 2016. These dates are flexible depending on the allocation of funds and award date. 1. An amount of $6000.00 is requested for the purchase of Water-willow plants, buoys, concrete, and buckets. 2. Categories Reservoir Fisheries Habitat Partnership Personnel Staff Partner Contribution Amount Type of Contribution (cash or in-kind) Timeline (anticipated date of expenditures)

Volunteers Fringe Travel Equipment* Supplies $6,000.00 Cash June 2, 2016 Contractual Other US Army Corps of Engineers Personnel Staff $3,840.00 In-kind July 10, 2016 Volunteers Fringe Travel Equipment* Supplies Contractual Other Georgia Department of Natural Resources Personnel $960.00 In-kind July 25, 2016 Staff Volunteers Fringe Travel Equipment* Supplies Contractual Other GA BASS Nation Personnel Staff Volunteers $3,000.00 In-kind July 25, 2016 Fringe Travel Equipment* Supplies Contractual Other Troup High FFA Personnel Staff Volunteers $1,800.00 In-kind September 15, 2016 Fringe Travel Equipment*

Supplies Total $15,600.00 3. An amount of $3500.00 is being requested to purchase ten Fish Attractor buoys which will cost approximately $350.00 each, which includes shipping costs, totaling $3500.00. An additional $260.00 is needed to purchase 75, 80 lb bags of Quickcrete at $3.29 per bag plus tax. Around $740.00 will be used for fuel for the barge that will be used to take attractors to their site. The remaining balance will be used to purchase additional buckets to the stock of buckets already present. 4. An amount of $1500.00 is requested for the purchase of Water willow plants.

The yellow pins represent the location of the fish attractor sites.

Water-willow planting sites are designated with yellow pins.

Water-willow planting sites are designated with yellow pins.

West Point Lake Fish Attractor Coordinates Fish Attractor Latitude Longitude Comments MC-01 N 32 57' 00.7" 25.2" Maple Cr., Large structure, natural materials. MC-02 N 32 56' 59.1" 08.9" Maple Cr., Large structure, natural materials. MC-03 N 32 57' 09.4" 52.5" Maple Cr., Large structure, natural materials. MC-04 N 32 57' 34.7" 10.9" Maple Cr., Large structure, natural materials. MC-05 N 32 56' 33.2" 44.2" Maple Cr., Large structure, natural materials. MC-06 N 32 56' 39.6" 47.0" Maple Cr., Large structure, natural materials. BV-01 N 32 57' 12.6" W 85 12' 32.5" Burnt Village, Large structure, natural materials. RC-01 N 33 01' 51.6" 37.3" Main River, Smaller structure, artificial materials. RC-02 N 33 02' 14.2" 00.9" Main River, Smaller structure, artificial materials. RC-03 N 33 02' 44.3" 00.2" Main River, Smaller structure, artificial materials. RC-04 N 33 02' 54.8" W 85 08' 28.4" Main River, Smaller structure, artificial materials. RC-05 N 33 03' 18.0" W 85 07' 21.6" Main River, Smaller structure, artificial materials. RC-06 N 33 03' 27.0" W 85 06' 56.3" Main River, Smaller structure, artificial materials. RC-07 N 33 03' 50.5" W 85 07' 43.8" Main River, Large structure, Unknown materials RC-08 N 33 03' 45.0" W 85 08' 17.9" Smaller structure comprised of artificial materials. WWC-01 N 33 04' 20.9" W 85 08' 34.6" Whitewater cr., Large structure, Unknown materials WWC-02 N 33 03' 38.5" 54.2" Whitewater cr., Smaller structure, artificial materials. RC-09 N 33 01' 37.2" 40.44" Between Pyne Rd. boat ramp and HWY 109. RC-10 N 33 01' 7.56" 44.28" Out from 2nd dock at Pyne Rd park. WC-01 N 33 01' 9.48" 10.68" Wilson Creek. South of beach at Pyne Rd park. WC-02 N 33 00' 40.14" 56.16" Wilson Creek. Near island out from Pyne Rd Park. RC-11 N 33 00' 52.02" 55.26" Out from shoals at Whitetail Ridge Campground RC-12 N 33 00' 14.16" 43.26" Out from Glass Bridge Park. RC-13 N 33 00' 3.96" 33.12" Out from Glass Bridge Park. Southern most part.

EC-01 EC-02 YJ-01 YJ-02 N 32 59' 49.26" N 32 59' 29.58" N 33 04' 30.82" N 33 05' 23.63" 18.96" In Rainbow Creek near Earl Cook Boat ramp. 35.46" Out from Earl Cook Beach. W 85 05' 06.63" Main Channel of Yellowjacket Creek W 85 03' 59.64" Yellowjacket Creek and Dixie Creek Intersection 4. Below are pictures of the current water willow habitat project currently being done by the Georgia BASS Nation, U.S. Army Corps of Engineers, and the Georgia Department of Natural Resources. We would like to expand on this project for several more years to provide critical shoreline habitat for juvenile fish species.