May 2017 Monthly Report

Similar documents
January 2017 Monthly Report

April 2018 Monthly Report

September 2017 Monthly Report

November 2018 Monthly Report

January 2019 Monthly Report

October 2016 Monthly Report

March 2016 Monthly Report

Table of Contents. January 2016 Monthly Report

NYCBS September 2015 Monthly Report

NYCBS October 2015 Monthly Report

NYCBS December 2015 Monthly Report

NYCBS August 2015 Monthly Report

NYCBS January 2015 Monthly Report

NYCBS November 2014 Monthly Report

NYCBS December 2014 Monthly Report

NYCBS August 2014 Monthly Report

NYCBS April 2014 Monthly Report

NYCBS March 2014 Monthly Report

NYCBS January 2014 Monthly Report

NYCBS September 2013 Monthly Report

NYCBS July 2013 Monthly Report

NYCBS October 2013 Monthly Report

Planning Transit Operations and Bike Sharing Denver RTD. Bill Van Meter, Assistant General Manager, Planning March 23, 2012

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

DRAFT. Table of Contents. Background

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

GOLD COAST TRANSIT DISTRICT SHORT RANGE TRANSIT PLAN FY 2015 FY 2019 APPENDICES

Rochester Area Bike Sharing Program Study

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

REQUEST FOR PROPOSALS TULSA BIKE SHARE SYSTEM APPENDICES

1999 On-Board Sacramento Regional Transit District Survey

Village of Plainfield Design and Operational Guidelines for Outdoor Uses within the Public Right-of-Way

BICYCLE SHARING PROGRAM DEVELOPMENT. CUTR Webcast Series June 27, 2013

B. THAT Council direct staff to prepare by-law amendments to allow for Public Bike Share City-wide.

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

MASTER BICYCLE AND PEDESTRIAN PLAN

Eliminate on-street parking where it will allow for a dedicated bus only lane %

2012 Transit Study Randolph County

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

About Us. Boulder B-cycle is a community nonprofit (501c3) formed in May 2011 to implement, own and operate a public bikesharing system in Boulder.

Street Paving and Sidewalk Policy

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Draft. Lecompton. Table of Contents. Background

March 8 th. CCT riders relief was. noted as the. suggested. According corridor. CCT

Multimodal Transportation Plan

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Yale University Human Research Protection Program

TAC February 1, 2012 Prepared by Metro Bike Program

WALK- AND bike-friendly TURLOCK

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Sacramento Metropolitan Air Quality Management District. Technical Working Paper #7: On-Going Evaluation Methods

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

ADA TRANSITION PLAN. For

DRAFT. Lecompton. Table of Contents. Background

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Membership Rules & Regulations

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Chapter Four NON-INFRASTRUCTURE RECOMMENDATIONS. 5 E s. 5 E s. Education. Encouragement. Enforcement. Engineering. Evaluation

Swift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit

TRANSPORTATION & ACCESS

EAST VILLAGE SHOPPERS STUDY A SNAPSHOT OF TRAVEL AND SPENDING PATTERNS OF RESIDENTS AND VISITORS IN THE EAST VILLAGE

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

Reducing Pedestrian Delay at Half Signals in the City of Portland, OR

STONY PLAIN ROAD STREETSCAPE

Public Bike Share Schemes. 14 December 2017

Peterborough Council on Aging

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

CHAPTER 3. Transportation and Circulation

Minnesota Ballpark Authority Board Meeting Minutes October 11, 2018

43 rd Avenue, Skillman Avenue Protected Bike Lanes

GOALS, OBJECTIVES, AND RECOMMENDATIONS

February 4, Community Meeting August 2, :30 6:10 Presentation

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Next Steps Staff report to Council on October 2, 2018 to present the Whistler 2018 Transportation Action Plan Final Draft

Most Important Part of any Plan

complete streets design and construction standards public primer City of Edmonton

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

Chapter 3 DESIGN SPECIFICATIONS

Non-Motorized Transportation 7-1

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

Bicycle and Pedestrian Level of Service Evaluation

Membership Rules & Regulations

TRANSPORTATION COORDINATOR ASSOCIATION (TCA) WEBINAR. BIKE SHARE ROLLS INTO PHOENIX! November 20, 2013

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Sidewalk Cafe City of St. Petersburg City Code Chapter 16, Land Development Regulations

Market Factors and Demand Analysis. World Bank

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

TRANSPORTATION & MOBILITY

Lawrence Bike Share Feasibility Study

Notes to Benefit-Cost Analysis

Paoli Road Improvement Feasibility Study

MTA CAPITAL PROGRAM: Tri-State Transportation Campaign

Fairview and Main Local Streets Improvement Plan

ADA TRANSITION PLAN 2013

Transcription:

May 2017 Monthly Report

May 2017 Monthly Report Table of Contents Introduction... 3 Membership... 3 Ridership... 3 Environmental Impact... 4 Rebalancing Operations... 4 Station Maintenance Operations... 4 Bicycle Maintenance Operations... 4 Incident Reporting... 4 Customer Service Reporting... 4 Financial Summary... 5 Service Levels... 5 SLA 1 Station Cleaning and Inspection... 5 SLA 2 Bicycle Maintenance... 5 SLA 3 - Resolution of Station Defects Following Discovery or Notification... 6 SLA 3a - Accrual of Station Defects Following Discovery or Notification... 6 SLA 4 Resolution of Bicycle Defects Following Discovery of Notification... 6 SLA 4a Accrual of Bicycle Defects Following Discovery or Notification... 6 SLA 5 Public Safety Emergency: Station Repair, De-Installation, or Adjustment... 6 SLA 6 Station Deactivation, De-Installation, Re-Installation, and Adjustment... 7 SLA 7 Snow Removal... 7 SLA 8 Program Functionality... 7 SLA 9 Bicycle Availability... 7 SLA 10 Never-Die Stations... 8 SLA 11 Rebalancing... 8 SLA 12 Availability of Data and Reports... 8 2

May 2017 Monthly Report Introduction On average, there were 49,137 rides per day in May, with each bike used 5.36 times per day. 17,363 annual members and 66,069 casual members signed up or renewed during the month. Total annual membership stands at 128,438, including memberships purchased with Jersey City billing zip codes. There were 605 active stations at the end of the month. The average bike fleet last month was 9,174, with 9,330 bikes in the fleet on the last day of the month. Citi Bike rebalanced 117,265 bicycles in May, averaging 3,783 bicycles moved per day. Citi Bike technicians conducted 19,846 bicycle inspections and repairs throughout the month, and responded to 10 reported cases of vandalism. In May, there were 18,192 total customer service calls and 4,211 emails, with a rate of 1.19 customer service calls per 100 rides. The total revenue for the month was $3,107,741, all from membership and user fees. Membership Citi Bike members purchased or renewed 17,363 annual passes, 59,142 single-day passes, and 6,927 three-day passes in May. There were 128,438 active annual members by the end of May. Ridership There were 1,523,249 trips in May, with an average of 49,137 trips per day. The combined distance traveled for all trips was 3,803,981 miles. The average trip lasted 14.36 minutes and covered 2.50 miles. Annual members completed the majority of trips, recording 1,333,493 trips, compared to 189,756 trips by casual members. Ridership was generally higher on weekdays, but weekends were more popular among casual riders. May 17 th was the highest day for ridership this month with 65,793 rides. The most popular origins and destinations continue to be stations near large transit and tourist hubs, including the stations near Central Park, Penn Station and the Port Authority, Pershing Square, and the area around Union Square. As has been the pattern, the least frequented destination stations are in Brooklyn and Queens. 3

Environmental Impact May 2017 Monthly Report Citi Bike riders burned a total of 152,159,240 calories for the month. According to a calculation published in the 2012 MTA Sustainability Report, we find that Citi Bike offset 1,978,070 pounds of carbon in May. Rebalancing Operations Citi Bike staff rebalanced a total of 117,265 bicycles during the month of May. The Service Delivery Department utilizes box trucks, vans, contracted trikes, articulated trikes ( bike trains ), and valets to redistribute bikes system-wide. Trike service is available in the Financial District, Midtown, Lower East Side and East Village, and valet service is available in the Financial District, Flatiron, East Village, Midtown, Penn Station, and Port Authority Bus Terminal. Station Maintenance Operations There were 605 active Citi Bike stations at the end of May. Technicians made a total of 345 station visits to address dock and station field maintenance orders. There were 89 reported station malfunctions and 271 reported dock malfunctions. Docking point repairs were the most common FMO types. Station uptime for the month was 99.97%. Bicycle Maintenance Operations The bike shops at Sunset Park completed 4,807 bicycle repairs in May. 9,532 total unique bikes were checked or repaired during the month in depots or in the field. Incident Reporting In May, there were 10 reported instances of vandalism, including stickers, graffiti, and damage to stations or bicycles, which were addressed either by Citi Bike field staff or a third party cleaning vendor. There were 19 crashes reported to Customer Service by Citi Bike riders. Customer Service Reporting In May, there were 18,192 total customer service calls. The Citi Bike call center processed 16,530 calls with an abandonment rate of 8%. The overflow call center, which also takes overnight calls, processed 1,662 calls. Call volume for May was approximately 1.19 calls per 100 rides. At Citi Bike, the average time to handle a call was three minutes and thirty-four seconds with an average hold time of twelve seconds. Citi Bike also received 4,211 emails. 4

Financial Summary May 2017 Monthly Report Revenue Categories May May YTD Annual Membership $1,657,254 $5,620,867 Casual Membership $875,786 $2,161,598 Annual Overages $61,111 $255,289 Casual Overages $426,483 $1,046,883 Other Revenue $35,890 $116,169 Refunds and Discounts $(202,309) $(626,770) Taxes $253,525 $754,439 Sponsorship $- $6,305,463 Total $3,107,741 $15,633,937 Service Levels SLA 1 Station Cleaning and Inspection Description: Every Station, as well as all Bicycles present, must be cleaned, wiped down, and inspected at least one time between the first and fifteenth days of the month, and one time between the sixteenth and last days of the month. SLA 2 Bicycle Maintenance Description: Every Bicycle that appears in the Bicycle Fleet level recording each day shall have received a Bicycle Maintenance check and cleaning within the last 45 Days. 5

May 2017 Monthly Report SLA 3 - Resolution of Station Defects Following Discovery or Notification Description: Instances of deficient, damaged, or unclean Station components, or adverse conditions caused to the surrounding public property by the presence of the Station must be timely resolved following Discovery or Notification. Station Defects fall into the following severity classes, based on whether they are: (i) Defects Impacting the Area Surrounding Station (must be resolved within 24 hours); (ii) Defects Impacting the Usability of Entire Station (must be resolved within 48 hours); (iii) Defects Impacting the Usability of Specific Dock(s) (must be resolved within 48 hours); (iv) Defects Impacting the Appearance of Station (must be resolved within 72 hours). Performance Rate: (i) 99.33%; (ii) 100%; (iii) 98.87%; (iv) 97.25% SLA 3a - Accrual of Station Defects Following Discovery or Notification Description: Every individual instance of a deficient, damaged, or unclean Station component must be resolved within 7 Days of Discovery or Notification. Station Defects fall into the severity classes listed in SLA #3, above. Performance Rate: (i) 100%; (ii) 100%; (iii) 98.89%; (iv) 97.44% SLA 4 Resolution of Bicycle Defects Following Discovery of Notification Description: Instances of deficient, damaged, or unclean Bicycles, or adverse conditions caused to the surrounding public property by the presence of Bicycles must be timely resolved following Discovery or Notification. For the purposes of this SLA, Wrenching of Bicycle by a user will constitute Notification, and removal of Bicycle from service by Citi Bike will constitute resolution of defect. Defects related to Bicycles must be resolved within 48 hours if Bicycle is Wrenched, or 96 hours if Bicycle is not Wrenched. Performance Rate: 98.78% SLA 4a Accrual of Bicycle Defects Following Discovery or Notification Description: Every individual instance of a deficient, damaged, or unclean Bicycle must be resolved within 7 Days of Discovery or Notification. Performance Rate: 99.98% SLA 5 Public Safety Emergency: Station Repair, De-Installation, or Adjustment Description: In the event of a Public Safety Emergency, a Station must be repaired, De- Installed, or Adjusted as soon as possible, but no later than 12 hours after Notification. Stations De-Installed for Public Safety Emergencies must be reinstalled within 72 hours after the end of the Public Safety Emergency, as determined by DOT. 6

May 2017 Monthly Report SLA 6 Station Deactivation, De-Installation, Re-Installation, and Adjustment Description: As directed by DOT, Citi Bike must perform: (i) Station Deactivation(s); (ii) Station De-Installation(s); (iii) Station Re-Installation(s); (iv) Station Adjustment(s). DOT will provide a minimum of 48 hours advance notice prior to any of the above, except in instances where the continued presence/activity of the Station has been determined to pose a threat to public safety. Deactivated Stations must be reactivated within 24 hours of direction from DOT. De-Installed or Adjusted Stations must be reinstalled or Readjusted to their original configurations within 72 hours of direction from DOT. SLA 7 Snow Removal Description: Following snow events, Citi Bike must remove snow within 12 hours so as to maintain: (i) Parallel pedestrian clear path adjacent to Stations located on sidewalks and in plazas; and (ii) Perpendicular pedestrian paths through Stations where gaps in Docks provide pedestrian access. SLA 8 Program Functionality Description: The Program is completely unavailable, such that no Program user can dock, undock, and Wrench Bicycles as intended, exclusive of planned Program outages for upgrades and maintenance as agreed upon by Citi Bike and DOT and Program outages caused by an Event of Force Majeure. SLA 9 Bicycle Availability Description: This Bicycle Availability requirement is met if the monthly average Bicycle Fleet Level, recorded once each Day of the month between the hours of 11:00 AM and 3:00 PM, meets or exceeds the required Bicycle Fleet Level. 7

SLA 10 Never-Die Stations May 2017 Monthly Report Description: The minutes of Station Outage at each Never-Die Station shall not exceed three (3) percent of Station-minutes at that Station between the hours of 6:00AM and 12:00AM per month. This SLA shall be adjusted or suspended during snow events and at times when the City has implemented an emergency suspension of alternate side parking following a snow event. Performance Rate: 89.45% SLA 11 Rebalancing Description: No individual Station Outage shall continue for longer than 4 hours. Damages will not accrue between the hours of 10:00PM and 6:00AM. Performance Rate: 94.07% SLA 12 Availability of Data and Reports Description: (i) Real-time Program data (i.e., JSON feed) will be accurate and available to the public at all times. In addition, the following data sources will be furnished to DOT: (ii) Real-time, read-only access to data as per the Functional Specifications; (iii) Real-time, read-only access to any databases or other record-keeping sources used by Citi Bike to manage and operate the Program, including but not limited to all data sources required to determine compliance with the service levels incorporated herein; and (iv) A monthly report as required by Appendix G, "Reporting Requirements." Performance Rate: (i) 100%; (ii): 100%; (iii) 100%; (iv): 100% 8