QRAE II Quick Reference Covers Diffusion & Pump Models with Firmware Version 3.12 and higher

Similar documents
Using the UltraRAE. Firmware 2.35

SDM-2012 Docking Station Standalone Configuration Operator s Manual

RM-80 respiration monitor

FireHawk M7 Interface Module Software Instructions OPERATION AND INSTRUCTIONS

Portable Gas Monitor GX User Maintenance Manual (H4-0050)

WELCOME TO THE REVOLUTION

CONSUMER MODEL INSTALLATION GUIDE

GasLab SAN-102 Micro Oxygen Monitor User Manual

Gas-Detection Instruments

Portable Gas Monitor GX Operating Manual

Columbus Instruments

Portable Gas Monitor GX Operating Manual

Portable Multi-Gas Monitor RX-8500/RX-8700 Operating Manual (PT0-136)

ECHO MANUAL WARNING. L B A ltim e te rs. ECHO is a trademark of LB Altimeters, Denmark

MASK INTEGRITY TEST ACCESSORY (MITA) MODEL 8120

CALIBRATION KIT. Instruction Manual

Dilution Manual Cannonball 3 Multi Gas Detector

#LZ400 LEAKALYZER. Water Loss Sensor INSTRUCTION MANUAL Country Dr. #190 St. Paul, MN

OxyScan Graphic. Operating Instructions. UMS Micro-oxygen sensor 501. Microprocessor instrument

GasLab SAN-102 Micro Oxygen Monitor User Manual

DIGITAL AUTOMATIC TYRE INFLATOR

Portable Gas Monitor GX Operating Manual (PT0-098)

2018 National Metal and Nonmetal Mine Rescue Contest. Technician Team Competition Written Test (Dräger BG-4) Good Luck!

Approach. S3 Owner s Manual. May _0B Printed in Taiwan

G100 RANGE G100, G110, AND G150 OPERATING MANUAL

Optical Interferometric Gas Concentration Meter FI-8000 Operating Manual (PT3-052)

Discovery HP-TGA 75/750. Site Preparation Guide

RAM 9025-XP Operation Manual

Operating Instructions Part No

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

HumiSys HF High Flow RH Generator

Optical Interferometric Gas Concentration Meter FI-8000 Operating Manual (PT3-052)

GM Series Dual-Block Multi-Function Gas Control Valves

G100 Range. Operating Manual

Revision: 23 March 2008 (nk)

Because every life has a purpose. MSA Z GARD S Sensor Calibration Procedure

Met One E-BAM Particulate Monitor

Quick Start Guide. A. Hardware installation B. Software installation C. Start the software for the first time D. Do your first measurement

Calibration Requirements for Direct Reading Confined Space Gas Detectors

GA-300 Gas Analyzer. Technical Note. Overview. Front Panel. iworx Systems, Inc. GA-300

COMBAT SWIM BOARD. RJE International, Inc. RJE International January 16, TAC-300 Revision 4

Technology. In the My Files [My Files] submenu you can store all the programs that you have made on the NXT or downloaded from your computer.

Race Screen: Figure 2: Race Screen. Figure 3: Race Screen with Top Bulb Lock

Documentation Beats Confrontation in Gas Detection

Dräger X-dock Frequently Asked Questions

BGA244 Binary Gas Analyzer

GasClam Instrument User Manual V1.5

IRwin Methane Leak Detector. Innovation makes the difference

RGC-IR Remote Gas Calibrator for IR400

PERSONAL GAS MONITOR MODEL GM460

MP15 Jockey Pump Controller

Overview. Front Panel: Keypad and Display

COMBAT SWIM BOARD. RJE International, Inc. RJE International Feb 1, TAC-300 Revision 6

User Manual. Portable Balances PL-E

c) Loss of product or replacement when units are being serviced All of these are factors that need to be considered by the user.

Operating manual for the pressure transducer unit CCS 1000

Model Description

RAM Operation Manual

TEL/jlRE" Introduction. Display Features and Modes. Startup Procedure. Power-Up Procedure. Adjustment Modes

Vers Gas Generator. Release III INSTRUCTION MANUAL. Advanced Calibration Designs, Inc.

Quick Start Guide LIQ-QSG-499ACL-03, Rev I July Rosemount 499ACL-03. Monochloramine Sensor

Oxygen Meter User Manual

G200 Analyzer Range. Operating Manual

AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP

RAM 4021-DPX Operation Manual

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Precision Hydrogen (All B&W Screen Models)

GasSense NDIR User Manual

Calibration and Bump Test Requirements for Direct Reading Portable Gas Monitors

Bante821 Portable Dissolved Oxygen Meter Instruction Manual

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

HART Communications Board

This multi-functional device allows the determination of up to six quality parameters with only one measurement:

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

GNX Wind. Owner s Manual

Operating Manual. SUPREMA Calibration. Software for Fire and Gas Warning Units. Order No.: /01. MSAsafety.com

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Sensepoint XCD. Calibration Guide

Verification Of Calibration for Direct-Reading Portable Gas Monitors

GEM 2000 GAS ANALYZER & EXTRACTION MONITOR OPERATION MANUAL

STANDARD OPERATING PROCEDURES DIVISION OF COMPARATIVE MEDICINE UNIVERSITY OF SOUTH FLORIDA

G200 RANGE G200 AND G210 OPERATING MANUAL

Dräger RZ 7000 Test Equipment

Instruction Manual Dräger MSI P7 and MSI P7 plus

Laboratory Mortar Mixer (Testing)

BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL

OPERATION MANUAL DIVE CALIPER NOT SCALE / IF IN DOUBT ASK* *ALL UNITS IN MM/DEGREES UNLESS SPECIF. Dive Caliper General DC-051

Mount Holyoke College. Confined Space Program

Diver-Office. Getting Started Guide. 2007, Schlumberger Water Services

PTG100 Precision Test Gauge

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

Ultima. X Series Gas Monitor

Portable Toxic Gas Monitor SC Operating Manual (PT0-105)

Additel 761 Automated Pressure Calibrators

OPERATING INSTRUCTIONS FOR

Bante810 Benchtop Dissolved Oxygen Meter Instruction Manual

RK-IR Sample Draw Aspirator Adapter Operator s Manual

The. «Modular Alliance» Gas Generators. ALLIANCE, the partnership that keeps the gas flowing. One step ahead!

G4 Permissible Multi Gas Monitor

OPERATING INSTRUCTIONS FOR PRO HE HELIUM ANALYZER DANGER

Transcription:

QRAE II Quick Reference Covers Diffusion & Pump Models with Firmware Version 3.12 and higher

WARNINGS Use only RAE Systems rechargeable battery pack part number 020-3402-000, or alkaline battery pack part number 020-3403-000. Use only DURACELL MN1500 batteries with alkaline battery pack. This instrument has not been tested in an explosive gas/air atmosphere having an oxygen concentration greater than 21%. Substitution of components may impair suitability for intrinsic safety. Recharge batteries only in non-hazardous locations. Do not connect the serial communication port in a hazardous location. STATIC HAZARD: Clean only with a damp cloth. For safety reasons this equipment must be operated and serviced by qualified personnel only. Read and understand instruction manual completely before operating or servicing. Only the combustible gas detection portion of this instrument has been assessed for performance. All newly purchased RAE Systems instruments should be bump tested by exposing the sensor(s) to known concentration calibration gas before the instrument is put into service, and later, prior to each use. A bump test is defined as a brief exposure of the monitor to the calibration gas and the sensors to show response and trigger the lowest alarm set point for each sensor. The QRAEII Multi Gas detector must be calibrated if it does not pass a Bump Test, or at least once every 180 days, depending on use and sensor exposure to poisons and contaminants. Calibration intervals and bump test procedures may vary due to national legislation. When using an H 2 S sensor in a QRAE II, RAE Systems recommends using RAE calibration gas cylinders with a 4 gas mix containing 10 ppm H 2 S, 50 ppm CO, 50% LEL Methane, and 18% Oxygen. Any rapid up-scale reading followed by a declining or erratic reading may indicate a gas concentration beyond upper scale limit which may be hazardous.

Important This Quick Reference provides operational information for the QRAE II. It is not intended as a substitute for the User s Guide. The User s Guide must be carefully read by all individuals who have or will have the responsibility of using, maintaining, or servicing this product. The product will perform as designed only if it is used, maintained, and serviced in accordance with the manufacturer s instructions. Standard Contents QRAE II Calibration Adapter (diffusion model only) Water Trap Filter (pump model only) Quick Start Guide Alkaline Battery Adapter CD-ROM with User's Guide and related materials, ProRAE Studio Software Package for Windows 2000, NT and XP (Rechargeable version only) Charging/download cradle with computer interface cable (Rechargeable version only) AC/DC Adapter with international plugs (Rechargeable version only) Lithium-Ion battery pack 1

Setting Up The Charging Cradle Before charging the rechargeable Li-ion battery, you must set up the charging cradle. Its AC/DC adapter is designed for use anywhere in the world and is able to handle voltages between 100 VAC and 240 VAC at either 50 Hz or 60 Hz. It comes with several plugs that snap into place on the base of the AC/DC adapter. 1. Remove the plastic spacer piece from adapter s receptacle. 2. Select the correct plug for your region. 3. Tilt the plug into the adapter s receptacle, aligning the small ledge with the cutout inside the receptacle. 4. Connect the adapter s plug to the receptacle on the back of the cradle. 5. If you need to remove the plug, slide the capture plate to release the plug, and tilt out the plug from the receptacle. 2

Charging The Battery Always charge the QRAE II before use. To charge the QRAE II: 1. Plug the AC/DC adapter into the QRAE II s cradle. 2. Plug the AC/DC adapter into the wall outlet. 3. Place the QRAE II into the cradle and press down until the charging LED glows. Red charging LED: Unit charging Green charging LED: Unit charged Cradle Note: A full recharge of the Li-ion battery typically requires six hours. Charging LED Turning The QRAE II On Hold down [MODE] for 2 seconds. When starting up, the QRAE II simultaneously turns the backlight on and off, beeps once, blinks once, and vibrates. It performs diagnostics and tells you current settings. Turning The QRAE II Off Press and hold [MODE]. In 2 seconds, a 5-second countdown to shutoff begins. You must hold your finger on the key for the entire shutoff process. If you remove your finger from the key during the countdown, the shutoff operation is canceled and the QRAE II continues normal operation. 3

User Interface The QRAE II s user interface consists of the display, LEDs, an alarm transducer, and two keys, labeled [MODE] and [Y/+]. The LCD display provides visual feedback that includes time, sensor mode, battery condition, and datalog enable/disable status. Display [MODE] key Gas inlets (diffusion model) Gas inlet (pump model) Calibration Adapter (diffusion model) LEDs Alarm [Y/+] key User Interface Icons Icon Indication Battery Voltage low (flashing) Battery Low alarm triggered Battery fully charged Battery charging Alkaline Battery Adapter in use Alkaline Battery cannot be charged Datalogging active (flashing) Datalog memory full Inlet Fingertightened screw Pump running Pump blocked (blinks on and off) 4

Everyday Use With the QRAE II turned off, press and hold [MODE]. When the display turns on, release the key. The QRAE II is now in the normal operating mode (Normal Mode). Note: For more information on Normal Mode, refer to the QRAE II User s Guide. 5

Bump Testing And Calibration RAE Systems recommends that a bump test be performed on the QRAE II before the monitor is put into service, and later, prior to each use. A bump test is defined as a brief exposure of the monitor to the calibration gas and the sensors to show response and trigger the lowest alarm set point for each sensor. The QRAE II Multi Gas detector must be calibrated if it does not pass a Bump Test, or at least once every 180 days, depending on use and sensor exposure to poisons and contaminants. Calibration intervals and bump test procedures may vary due to national legislation. When using an H 2 S sensor in a QRAE II, RAE Systems recommends using RAE calibration gas cylinders with a 4 gas mix containing 10 ppm H 2 S, 50 ppm CO, 50% LEL Methane, and 18% Oxygen. Important! Make sure you have the correct calibration gas in the correct concentration. Also make sure that the calibration gas is not beyond its Best when used by date, which is stamped on the cylinder s label. The following diagram shows Programming Mode s five submenus and how to navigate through them. Note: Press [MODE] to navigate from one menu choice to the next and [Y/+] to make selections. 1. If the QRAE II is off, turn it on (hold down [MODE] for 2 seconds). 2. After startup, press and hold both keys. 3. Press the [MODE] key to advance to OK. 4. Press [Y/+]. The QRAE II is now in Programming Mode s Calibrate Monitor submenu. Note: Refer to the QRAE II User s Guide for information on password-protected QRAE IIs. 6

Refer to Navigating The Calibration Submenus on page 8 7

Navigating The Calibration Submenus The submenus and actions are shown in the following diagram: 8

Calibrating The QRAE II Calibration is covered in detail in the section Calibrating The QRAE II, in the QRAE II User s Guide. Diffusion Model 1. Place calibration adapter over filter area. 2. Finger-tighten screw to fasten calibration adapter. 3. Attach hose from calibration gas source. 4. Open calibration gas regulator and start calibration. 5. Remove the calibration adapter. Pump Model 1. Connect hose to inlet. 2. Attach hose to calibration gas. 3. Open gas regulator and start calibration. 4. Remove hose. 9

Zero (Fresh Air) Calibration This procedure determines the zero point of the sensor calibration curve. Expose the inlet to a clean air source with 20.9% oxygen and without any organic, toxic or combustible gas impurities. This Zero Air can be from a cylinder, clean ambient air, or ambient air purified through a charcoal filter. Caution! If your QRAE II is a diffusion model, do not use the Calibration Adapter while performing zero calibration in fresh air. 1. If the QRAE II is off, turn it on (hold down [MODE] for 2 seconds). 2. After startup, press and hold both keys. 3. At Calibrate Monitor, press [Y/+]. The display should show: Fresh Air Calibration? 4. Press Y+ to start calibration. Calibration is performed automatically (there is a 30-second countdown). When the zero calibration is successful, the display should show a reading of 20.9 for the oxygen sensor and 0 for all other sensors. 10

Multiple Sensor Calibration Select a sensor to calibrate by pressing [MODE] until the sensor s name is highlighted. Then press [Y/+] to toggle the selection on (indicated by an asterisk, *) or off (no asterisk). To select other sensors to calibrate, press [MODE] until you reach the sensor you want to select. Then press [Y/+]. After you have selected all the sensors you want calibrated, it is time to perform the calibration. 1. Attach the Calibration Adapter to the QRAE II (diffusion model only). 2. Attach the regulator to the Calibration Gas cylinder. 3. Attach a hose to the Calibration Adapter and to the regulator (diffusion model only), or attach hose to the inlet (pump model). 4. Turn on the regulator to start the Calibration Gas flow. 5. Press [MODE] until OK is highlighted. 6. Press [Y/+] to start calibration. You should see a countdown from 60 seconds. Note: If you see the following message, check that the gas is flowing and the hose is attached: No Gas Flow... Apply gas or hit any key to start. When calibration is complete, the screen displays this message: Multiple Sensor Calibrated! If a sensor fails, try calibrating again. If calibration fails again, replace the sensor. Note: If you want to perform a single-sensor calibration, refer to the QRAE II User s Guide. 11

Notes

RAE Systems by Honeywell World Headquarters 3775 N. First St. San Jose, CA 95134-1708 USA Phone: +1 408.952.8200 Fax: +1 408.952.8480 RAE Systems Europe Kristinehøj 23 A, DK-2770 Kastrup, Denmark Phone: +45 86 52 51 55 Fax: +45 86 52 51 77 orders@raeeurope.com sales@raeeurope.com service@raesystems.com Web: www.raesystems.eu RAE Systems Asia RAE Systems (Hong Kong) Ltd. Units 1516-18, 15/F, Delta House, 3 On Yiu Street Shatin, N.T. Hong Kong Phone: +852.2669.0828 Fax: +852.2669.0803 Email: asiasales@raesystems.com Technical Support Monday through Friday, 7:00 AM to 5:00 PM Pacific (US) Time Phone (toll-free): +1 888-723-4800 Phone: +1 408-952-8461 Email: tech@raesystems.com RAE Systems Middle East LOB 7, Ground Floor, Office 19 Jebel Ali Free Zone Dubai, United Arab Emirates Phone: +971.4.887.5562 Fax: +971.4.887.5563 Email: mesales@raesystems.com P/N 020-4008-000-D Rev G, November 2011