GRASS PITCHES FOR RUGBY

Similar documents
FACILITIES GUIDANCE NOTE 2 GRASS PITCHES FOR RUGBY

MAINTENANCE OF GRASS PITCHES FOR RUGBY

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

Guide to indoor areas for small sided football and disability football

REGULATION 22. STANDARD RELATING TO THE USE OF ARTIFICIAL RUGBY TURF

The Ground is the total area shown on the plan. The Ground includes:

Code of Practice and Technical Requirements for the Design and Installation of Non-Turf Cricket Facilities

Kirkhill Golf Club. Advisory Report on the Golf Course incorporating the STRI Programme

ROTHERHAM PHOENIX RUFC DEVELOPMENT OF FACILITIES ON HERRINGTHORPE PLAYING FIELDS PROJECT OVERVIEW

EXTRACTS FROM THE BRITISH HORSERACING AUTHORITY RACECOURSE MANUAL

2002 RUTGERS Turfgrass Proceedings

A2:1 The Facility Standards are focused on ensuring appropriate standards for the benefit of the Game including:

Frequently asked questions on the use of rubber crumb in 3G artificial grass pitches

PONTELAND RUGBY FOOTBALL CLUB

PROJECT EXAMPLES NATURAL GRASS DEVELOPMENTS

2 Rugby League Turf Care Managers. 3 Maintenance Summary for Rugby League Pitches. 6 Setting & Marking Out: Pitch Sizes

Gourock Golf Club. Report on Proposed Course Improvement Works. 11th April 2016

ARTIFICIAL GRASS PITCHES FOR RUGBY performance standards and design guides for community use pitches and training areas

IRB Regulation 22 Performance Specification Re-test Field Report

PITCH IMPROVEMENT PROGRAMME

IRFU Age Grade Rugby

IRFU Age Grade Mini Rugby

Introduction to the NRA Design Manual for Roads and Bridges

FIFA$Under$17$World$Cup$India$2017$

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS

BUCS CONFERENCE 2016 FACILITY DEVELOPMENT THE RISE/ROLE OF ARTIFICIAL PITCHES THURSDAY, 14 JULY 2016

FACILITY NAME: ASBA SINGLE FIELD FACILITY AWARDS APPLICATION. New Construction Upgrade of Existing Facility. Date of completed project:

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

Researchers propose a cost effective solution for failing native soil athletic fields across Michigan.

Health & Safety Policy & Plan. Rightway Roofing.

PROCEDURES FOR STANDBY

PRESTONFIELD GOLF CLUB

NATIONAL GROUND GRADING - CATEGORY H

Chutes Part 2: Synthetic linings

Report Date: February 20, 2018 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: March 14, 2018

Fire Safety Hot Work Permit Policy/ Procedures

Guidance on the Legal Obligations for Importers, Retailers and Distributors of Category 1 Fireworks

Sport Labs Combining design

Wareham Golf Club Course Policy Plan

GAILES LINKS GOLF COURSE

Role Description. 30,000 35,000 dependant on experience and qualifications (on a self-employed basis and reviewed after a trial period)

The FA Cup, The FA Trophy, The FA Vase and The FA Youth Cup Competitions

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

Goals are crucial pieces of equipment. They should be good quality in terms of both playing performance and durability.

ROWLANDS CASTLE GOLF CLUB GOLF COURSE POLICY DOCUMENT

Bentgrass sod to damaged areas from April 29-May 7, #1 Fairway Irrigation Pond Culvert Drainage. July 29-30, 2014

INTRODUCTORY GUIDANCE FOR ENGLAND HOCKEY ARTIFICIAL GRASS PITCHES

Introduction 2 Orange 10 Designing Mini Tennis facilities 2 Green and Red 12 Dedicated Kids Zone Design 3 What is it made of? 12

Trends and advances in tennis courts. Tim Freeman BA Dip Arch RIBA SAPCA Director and Vice Chairman of Tennis, Projects Director at Trevor May

Governors Club Golf Course Standard Operating Procedures

Surfaces for football, rugby, tennis, netball, basketball, hockey etc. Sport Facility Specifications

Cutting frequency: Normal frequency during the winter period, if mild, would be

NATIONAL GROUND GRADING - CATEGORY F

ASBA MULTI-FIELD FACILITY AWARDS APPLICATION. Please complete the following or refer to site plan.

Easington Sports and Social Club, Addison Road, Banbury, OXON OX169DH

MISSION. Provide World Class training & racing surfaces under best management practices

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Tower Tours

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Creston Golf Club Development Plan

;0iii] C*Iq'FgRHI{CE --::-- ;: -.. !: t,' li l:j. :t. ti?-. tlr. . *,, :;. :slill I iii-: .ir,::ri:}.:f :aei*l$ljai:!r. ; i:r ;: i:- ; i I!

Job Description HEAD GROUNDSMAN Bready Cricket Club, North West Cricket Union

FIRMNESS FIRST. by Richard Windows & Henry Bechelet With a little help from Dr Christian Spring & Jay Dobson

The best alternative to nature

HEAD GROUNDSMAN Bready Cricket Club

Pressure Systems Safety Regulation

Strategic Plan for Sevens Rugby. September 2006

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

European Handball Federation TM EHF Beach Handball Commission

Telfer Reserve Facility Audit

gaf traffic 2015 capability statement

JOINT GROUND CRITERIA. Version 1.13 June 2016

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

S EVERAL YEARS AGO the

CellWeb TRP. Tree Root Protection Guaranteed.

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

Epping Forest Council Playing Pitch Strategy. PROJECT DETAILS Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES

OCTOBER 2017 ISSUE Page 1 of 7

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

Support Infrastructure

Progress with the Road Investment Strategy

ECB WOMEN S CRICKET SUPER LEAGUE ( WCSL ) HOST MINIMUM QUALITY STANDARDS

Fact sheet. Badgers A Guide for Developers. January Page 1 of 8

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

GAS PIPELINE SAFETY GUIDE.

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Field Usage for the Irvington UFSD System of 4 fields (Meszaros, East, Upper Dow s Lane, Lower Dow s Lane)

Contractor / Exhibitor Handbook

DAVID STANSFIELD LTD.

Report to COUNCIL for decision

Amec Foster Wheeler 2016.

MILTON ROAD LLF PROJECT UPDATE

FACILITY NAME: ASBA TRACK AND FIELD FACILITY AWARDS APPLICATION TRACK PORTION

Transcription:

GRASS PITCHES FOR RUGBY

Introduction An essential part of the IRFU sports development programme and objectives is the provision of well constructed and maintained grass pitches either through improvement and upgrading or new installations. The purpose of this Guidance Note is to assist rugby clubs carrying out this type of project. It identifies the process and the key issues. This includes the initial feasibility study, performance and playing standards, design and construction. The maintenance and upkeep of grass pitches is covered in guidance document Maintenance of Grass Pitches for Rugby. 2

The client brief It is recommended that, except for the smallest projects, qualified, experienced and independent professionals are appointed to carry out your project. Prior to the selection and appointment of your professional advisors, a steering group of club or committee members should be brought together to provide an initial client brief and point of contact for the professional advisors, throughout the various project stages. The terms of engagement and scope of their services should be formally agreed at the time of the appointment. The initial client brief should include: the likely programme of use (number of games to be played) and types of usage, e.g. matches, training and mini rugby floodlighting possible phasing and long term development plan other sports use, e.g. summer season usage and events maintenance arrangements and current maintenance budget funding sources and initial capital cost budget other new facilities, e.g. spectator accommodation, changing rooms and clubhouse Site information and background information should also be assembled if applicable and available, including: a site plan showing the club s land ownership and any additional land that may be purchased, legal agreements, way leaves, covenants and rights of way location and layout of existing buildings, main services, irrigation, water storage, existing pitch layouts and orientation, land surveys including levels, trees, hedgerows and any special features local knowledge of ground conditions and site factors, e.g. history of the site, especially any knowledge of tipping and existing water courses any initial consultations with the Local Planning Authority, including land designation and permitted use 3

Feasibility study Your appointed consultants or specialist advisors should undertake a feasibility study. Each project will have different issues, site factors, constraints and opportunities. The following lists, whilst not exhaustive, identify key areas and considerations that may need to be addressed. Site information Information assembled by the client steering group Site history, in particular any knowledge of tipping on, or adjacent to, the site Levels, trees, adjacent buildings and adjoining owners Ground conditions, soil surveys and hydraulic conductivity (rate at which water permeates through soil) Existing services Existing watercourses Town planning issues and consultations Consultations with other agencies, e.g. the Environmental Protection Agency and Local Authority regarding floodplain and surface water drainage proposals Access for construction and future maintenance Pitch layouts Critical site factors Possible locations, pitch layouts and safety margins (options appraisal) Pitch size, levels and adjustments required Orientation Surface water drainage proposals Existing trees and shrubs New tree planting and landscaping Ecological and environmental issues Relationships with clubhouse, including viewing Access for spectators and people with disabilities Safety, possible fencing, etc. Other sports users activities Player and spectator shelters Irrigation proposals and water storage Capital costs Programme of works Maintenance access routes/machinery and equipment storage Upon completion of the feasibility study, your steering group should be able to make informed decisions before proceeding to the next stages of your project Orientation and siting Wherever possible, the pitch should be laid out (end to end) with the orientation limits shown in diagram 1. 285 W Reciprocal bearings shown as dotted lines True North 0 360 Rugby Football 200 S 20 105 E Diagram 1 4

Pitch dimensions IRB Law 1 - The Ground Definitions The ground is the total area shown on the plan. The ground includes the following: The field of play is the area (shown in diagram 2) between the goal lines and the touchlines. These lines are not part of the field of play The playing area is the field of play and the in-goal areas. The touchlines, touch in-goal lines and dead ball lines are not part of the playing area The playing enclosure is the playing area and a space around it, not less than 5 metres where practicable, which is known as the perimeter area The in-goal is the area between the goal line and the dead ball line and between the touch in-goal areas. It includes that goal line but it does not include the dead ball line or the touch in-goal lines Touch-In Goal Touchline Touch-In Goal Line 15m Dead Ball Line Not exceeding 70 m 5m In Goal Goal Line 22 metre line 10 metre line Halfway Line 10 metre line 22 metre line 22m 10m 10m Not exceeding 22m Not exceeding 100m The 22 is the area between the goal line and the 22m line, including the 22m line but excluding the goal line The plan, including all the words and figures on it, is part of the laws The dimensions for a 15-a-side pitch are shown in Diagram 2. These exclude line markings, which should not exceed 100mm Touch-In Goal Touch-In Goal Line Goal Line Dead Ball Line 22m The dots are the goal posts and the line is the crossbar Not exceeding 22m Mini/Midi rugby Under 7 and under 8 Mini rugby - 60m x 30m maximum Diagram 2: The playing area Under 9 and under 10 Mini rugby - 60m x 35m maximum Under 11 and under 12 Mini rugby - 60m x 43m maximum + 5m for each in-goal 5

Perimeter area Minimum end and side recommended safety areas (perimeter area) should not be less than 5m where practicable. Where floodlighting columns have been erected on the side(s) of the pitch within the recommended safety area, clubs should carry out a risk assessment and take the appropriate action. The perimeter area is defined as within the playing enclosure. Goal posts Minimum sizes are shown in Diagram 3. The supply and installation of goal posts, sockets and post protectors should only be arranged through a reputable and recognized firm. Protection, maintenance and inspections should be carried out in accordance with supplier s instruction. NSAI Standard IS 357:2007 applies for all goal posts. Minimum height 3.4 metres 5.6 metres 3 metres to top edge of bar Diagram 3 6

Performance and playing standards Your appointed consultant will provide detailed advice and information on the design, construction and maintenance of playing surfaces. All of these aspects will be reflected and taken into account in the tender specifications and documentation that is sent out to contractors. Pitch construction Generally, depending upon the standard of facility required, the playing surface should be no steeper than 1:80-100 along the line of play and 1:40-50 across the line of play. 7

Pitch drainage 50mm blinding layer Surface requires aeration and repeated applications of sand top dressing Most grass pitches will require an effective drainage system to allow regular use throughout the playing season. The lateral drain spacing for each pitch should be calculated using the hydraulic conductivity findings from the soil surveys. There are four main types of pitch drainage that should be considered: Undrained - unlikely to be adequate for regular usage unless the subsoil is naturally well drained. Pipe drained pitches (see Diagram 4) - most common system, using perforated plastic pipes at 1:200 minimum fall laid approximately 450-600 mm below the surface in lateral gravel filled trenches to the surface. The pipes must connect to a surface water drainage system or watercourse. This system requires aeration and appropriate sand dressing to maintain its performance. Pipe and slit drained pitches (see Diagram 5) - uses the pipe drained system with additional slit drains laid across the top of the pipes. The slits are commonly 200mm to 300mm deep, filled with gravel and dressed with minimum 25mm sand. This system requires regular maintenance with frequent sand dressing to maintain the safety and quality of the surface. The surface may be uneven during the first season and may be susceptible to shrinkage in summer. Suspended water table (see Diagram 6) - the entire playing surface is constructed over a gravel base with a lateral piped drainage system. Water is held in the sand / soil root zone (determined by suitable laboratory testing) and this moisture helps to sustain the grass during dry weather. A fully automatic irrigation system is needed and some form of reinforcement is likely to be incorporated in the root zone. This type of construction is advisable where the subsoil is unsuitable and where a very high standard of pitch performance (including high levels of play) is required, for example at professional clubs. A suspended water table form of construction will be demanding of both management and grounds maintenance staff. Porous backfill material ensures high percolation rates brought to within 150-200mm of the surface Surface requires aeration and repeated applications of sand top dressing 50mm blinding layer Pipe-drains at 5-10m centres Generally 450-600mm below ground level Pipe-drains at 5-10m centres Minimum fall 1:200 Diagram 4: Pipe-drainage construction Gravel 75mm sand Slit-drain normally 250-300mm deep Connection between slit-drain and backfill above pipe drain essential Diagram 5: Pipe-and slit drainage construction Sand/soil rootzone mix 250-300mm 50mm building layer Aggregate drainage layer 100mm Lateral drain Diagram 6: Suspended water table construction. High standards of pitch performance require high levels of reliable maintenance. 8

Rootzone re-inforcement On all high wear pitches the rootzone mix of sand/soil should be amended with polypropylene fibres (Lok or Fibre sand) to a minimum 0.25% content of the surface 150mm of the profile. This will provide the extra stability of the rootzone mix to increase performance levels of the surface during the depths of winter. The benefits of using stabilising fibres are: Provides a surface that stays firm and level for longer periods Offers greater resistance to wear and tear Aids better drainage to reducing surface compaction Less divoting necessary Surface can be aerated and rolled after games without affecting drainage Irrigation Well-drained pitches will require intensive irrigation to prevent drying out during periods of dry weather and to enable rapid grass establishment. Consideration should be given to a pumped water supply and hydrant points located near the pitches. Automatic pop-up irrigation systems are recommended for higher levels of play. Wherever possible and feasible, clubs should investigate and provide water storage arrangements and recycling surface water collection. 9

Equipment and machinery Procurement and tenders Facilities guidance on the Maintenance of Grass Pitches for Rugby lists equipment that is fundamental to successful maintenance. This process should include: Pre-tender Shortlist of contractors Visits to similar completed installations Financial standing and liability of the contractor References Tenders Storage and ground compound Depending upon the scale and extent of a club s sports ground, equipment and facilities, both secure storage and support facilities may be required. 10 Tender documents should include the following: Role and responsibility of client consultants Outline of scheme drawings Planning permission and conditions (if applicable) Contractual preliminaries, form of contract, defects maintenance period Detailed specification of works, performance and playing standards Requirement for as constructed drawings and layouts Programme Maintenance requirement/schedule Supply and installation of goal posts, protectors, sockets and flexible corner flags Fencing details Other associated works

Publications An Introduction to IOG Performance Quality Standards Institute of Groundmanship 28 Stratford Office Village Walker Avenue Wolverton Mill East Milton Keynes MK12 5TW UK Tel: 01908 312511 www.iog.org Performance Quality Standards - Rugby Institute of Groundmanship (as above) Pitch Dimensions International Rugby Board Huguenot House 35-38 St Stephen s Green Dublin 2 Ireland Tel: 00 353 1 240 9200 www.irb.com Natural Turf for Sport - Design Guidance Note Sport England Publications PO Box 255 Wetherby LS23 7LZ UK www.sportengland.org Useful contacts International Rugby Board (IRB) Huguenot House 35-38 St Stephen s Green Dublin 2 Ireland Tel: 00 353 1 240 9200 www.irb.com IRFU Consultant Agronomist Mr Eddie Connaughton EBC Ltd 48 Roselawn Lucan Co. Dublin Ireland IOG (Ireland) Mr Donal Kearney IOG Consultant & Development Officer The Institute of Groundsmanship Mayne, Clogherhead, Co. Louth Ireland Sportsturf Science Consultants Dr. Tim Butler Sportsturf Science Agronomist Sportsturf Consultancy Ireland Deerpark, Lattin Co. Tipperary Ireland

The IRFU shall not be liable for any loss or damage whatsoever arising from the use of or reliance on the information contained in this Guidance Note. The IRFU reserves the right to amend or withdraw the information contained in this Guidance Note. Produced in association with the RFU.