SOUTH TOTO ACOUSTIC MEASUREMENT FACILITY (STAFAC) IN-WATER SYSTEMS DESIGN

Similar documents
Design of a Subsurface Moored Acoustic Array in Deep Water

Characterizing The Surf Zone With Ambient Noise Measurements

Long-Term Autonomous Measurement of Ocean Dissipation with EPS-MAPPER

Air-Sea Interaction Spar Buoy Systems

Remote Monitoring of Dolphins and Whales in the High Naval Activity Areas in Hawaiian Waters

High Frequency Acoustical Propagation and Scattering in Coastal Waters

Marine Mammal Acoustic Tracking from Adapting HARP Technologies

Development of Low Volume Shape Memory Alloy Variable Ballast System for AUV Use

The below identified patent application is available for licensing. Requests for information should be addressed to:

Examples of Carter Corrected DBDB-V Applied to Acoustic Propagation Modeling

Navy Shipbuilding Industrial Base

Using SolidWorks & CFD to Create The Next Generation Airlocks

DoD Coral Reef Protection and Management Program

Understanding the Dynamics of Shallow-Water Oceanographic Moorings

Kelly Legault, Ph.D., P.E. USACE SAJ

AFRL-RX-WP-TP

Internal Waves and Mixing in the Aegean Sea

Waves, Bubbles, Noise, and Underwater Communications

High-Frequency Scattering from the Sea Surface and Multiple Scattering from Bubbles

DEVELOPMENT OF PRIMARY FRAGMENTATION SEPARATION DISTANCES FOR CASED CYLINDRICAL MUNITIONS

TITLE: Assessing the Hydrodynamic Performance of Fouling-Release Surfaces (ONR Research Contract # N WR )

CB-50 Data Buoy Quick Start Guide

M2.50-cal. Multishot Capabilities at the US Army Research Laboratory

Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science

Observations of Near-Bottom Currents with Low-Cost SeaHorse Tilt Current Meters

BRRAKING WAVE FORCES ON WALLS

TRAVSMART permanent single-cable horizontal lifeline system

AN EXPERIMENTAL INVESTIGATION OF SPILLING BREAKERS

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

QUICK START GUIDE CB-450 DATA BUOY PLATFORM

Internal Waves in Straits Experiment Progress Report

OE Barricade Guide Development. Michelle Crull, PhD, PE Wallace Watanabe James Manthey, PE Charles Barker, PE

Stability & Control Aspects of UCAV Configurations

QUICK START GUIDE CB-150 DATA BUOY PLATFORM

Edit this text for your title

Behavioral Response of Dolphins to Signals Simulating Mid-Frequency Sonar

CB-40 Data Buoy Quick Start Guide

Saab Seaeye Cougar XT Compact

Imaging the Lung Under Pressure

Acoustic Focusing in Shallow Water and Bubble Radiation Effects

Protection for Vessels Engaged in Servicing Submarine Cables

REPORT DOCUMENTATION PAGE

( max)o Wind Waves 10 Short Swell (large wave steepness) 25 Long Swell (small wave steepness) 75

QUICK START GUIDE CB-950 DATA BUOY PLATFORM

Proof of Concept Demonstration of the Hybrid Remotely Operated Vehicle (HROV) Light Fiber Tether System

z Interim Report for May 2004 to October 2005 Aircrew Performance and Protection Branch Wright-Patterson AFB, OH AFRL-HE-WP-TP

Geo-Vibro Corer

Security and confidence at height.

Observations of Velocity Fields Under Moderately Forced Wind Waves

Calculation of the Internal Blast Pressures for Tunnel Magazine Tests

US Navy Wave Energy Test Site. Kaneohe, HI

Right Whale Diving and Foraging Behavior in the Southwestern Gulf of Maine

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

Anthropogenic Noise and the Marine Environment

Waves, Bubbles, Noise and Underwater Communications

AMTEC SUPPORT GRIPS STANDARD, HEAVY DUTY & CONDUIT GRIPS

Hydro-Thermal Vent Mapping with Multiple AUV's AZORES-2001

Temporary Flying Restrictions Due to Exogenous Factors

ISE Subsea Tools and Toolsleds

AFRL-RH-WP-TR

Homework of chapter (3)

Concrete Obstacle Vulnerability

SECURITY AND CONFIDENCE AT HEIGHT

Coastal Engineering Technical Note

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

REPORT DOCUMENTATION PAGE

Waves, Turbulence and Boundary Layers

Ocean Observatories Initiative Cabled Array Observatory Extension Cables/Connectors

MECHANICAL ASPECTS OF SUBMARINE CABLE ARMOUR

Custom Cables and Ropes. Oceanographic and Research Solutions

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

THE ARENA TABLE OF CONTENTS 6 THE ARENA OVERVIEW Dimensions and Tolerances... 2

CB-150 Data Buoy Quick Start Guide

RR10106 Cruise Plan ITOP Mooring Recovery and PhilSea10 Seaglider Operation (R/V Revelle November 6-26, 2010)

MSA Confined Space Entry Equipment

A Single-Point Mooring System for Direct Pumpout of Hopper Dredges

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

NSF's Ocean Observatories Initiative: Building Research Infrastructure for the Pacific Northwest and the Broader Community

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Acoustic Seaglider for Beaked Whale Detection

9408 Series Dissolved Oxygen Systems. Dissolved oxygen systems designed for reliable operation with minimal operating costs

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Broadband acoustic transmission measurements in surface ship wakes

LiftAlloy Chain Slings

Check with local zoning official for property line distance requirements.

Noise Experiment #2. Marine Physical Laboratory Scripps Institution of Oceanography La Jolla, CA February 22 February 2010

ABB MEASUREMENT & ANALYTICS DATA SHEET series Dissolved oxygen systems

Chapter 9: Sea operations

DEPARTMENT OF THE NAVY DIVISION NEWPORT OFFICE OF COUNSEL PHONE: FAX: DSN:

ANTARES MECHANICS: A CRITICAL ANALYSIS IN VIEW OF A LARGE SCALE DETECTOR

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

MODEL DIGITAL ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.5 TO 100FT (0.15 TO 30M) OPERATING RANGE SERIAL OUTPUT

Aircraft Fuel Cell Repair Equipment

RIGGERS SAFETY SAFETY IS IN THE DETAILS FULL LINE CATALOG

Advantage Lockers & Bike

BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx

Finalizing the DTAG: Implementation and Testing of Design Improvements for Reliability and Availability

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

Fall Protection Checklist. Guardrail System

Transcription:

SOUTH TOTO ACOUSTIC MEASUREMENT FACILITY (STAFAC) IN-WATER SYSTEMS DESIGN Phil DeNolfo Mike Harrison Naval Undersea Warfare Center Division Sound & Sea Technology Newport, RI Ventura, CA Hugh Thomson Naval Facilities Engineering Service Center, Port Hueneme, Ca Mark Greise Sound & Sea Technology Ventura, CA INTRODUCTION Current submarine radiated noise measurement systems operated by the US Navy in the Southern portion of the Tongue of the Ocean (TOTO), Bahamas, including their deployment vessel, the USNS HAYES, are nearing their end-of-life and require replacement prior to FY09. The South TOTO Acoustic Facility Program, STAFAC, is a Naval Surface Warfare Center, Carderock Division (NSWCCD) program supported by the Naval Undersea Warfare Center, Newport Division (NUWCDIVNPT), which operates and maintains the Navy s Atlantic Undersea Test and Evaluation Center, (AUTEC) on Andros Island, Bahamas, and the Naval Facilities Engineering Service Center (NFESC). This four year program, beginning in FY05, replaces the existing surface ship deployed submarine radiated noise, high gain measurement systems with a fixed, bottom mounted, shore connected acoustic system installed in the same area. The main system infrastructure was installed in April through May of 2008, and the acoustic sensors were installed in July August 2008. The Initial Operational Capability (IOC) for STAFAC is October 2008. The Mechanical, Mooring, and Installation (MMI) Integrated Project Team, team comprised of personnel from the Naval Undersea Warfare Center (NUWC) in Newport, RI, Naval Facilities Engineering Service Center (NFESC) in Port Hueneme California, and Sound & Sea Technology (SST) in Ventura California were tasked to design, manufacture the mechanical components of the STAFAC system, and to install the entire STAFAC system, including the MMI and array components at AUTEC, Andros Island Bahamas. Overall System Description Figure 1 provides an overview of the wet-end components of STAFAC, which were conceived, developed, and installed by the STAFAC Mechanical, Mooring, and Installation Team. The system was required to have a 15 year service life, with access to the acoustic array sections every five years, at a minimum, for maintenance. Figure 1 STAFAC Wet-End System The STAFAC In-Water Mechanical System comprises all bottom mounted telemetry and power cables, deep sea moorings, and related mechanical subsystems incorporated into the AUTEC land and sea sites. These included undersea power and telemetry cables, electro-optical-mechanical terminations; a shallow water mounting structure for a telemetry and power conversion Junction Box; instrumentation pressure vessels; subsurface floats and suspension components; mechanical mooring cables, fittings, and assemblies; and bottom and counterweight anchors. These systems are described in the following sections. DESCRIPTION OF MMI WET-END HARDWARE Telemetry and Power Subsystem The STAFAC wet-end system comprises five different ocean cable segments, as described in the following sections. Figure 2 presents an overview 978-1-4244-2620-1/08/$25.00 2008 IEEE

Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE SEP 2008 2. REPORT TYPE 3. DATES COVERED 00-00-2008 to 00-00-2008 4. TITLE AND SUBTITLE South Toto Acoustic Measurement Facility (STAFAC) In-Water Systems Design 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Undersea Warfare Center,1176 Howell Street,Newport,RI,02841-1708 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 11. SPONSOR/MONITOR S REPORT NUMBER(S) 13. SUPPLEMENTARY NOTES See also ADM002176. Presented at the MTS/IEEE Oceans 2008 Conference and Exhibition held in Quebec City, Canada on 15-18 September 2008. U.S. Government or Federal Rights License. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Same as Report (SAR) 18. NUMBER OF PAGES 8 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

chart of the STAFAC TYCO SL17 cables that were installed using a telecom cable ship, the C/S INTREPID, chartered from International Telecom. These include the Shore and ground cables, trunk cables, J-Box and array tether cables, array bottom cables, and Tracking and Underwater Communications (TUC) array cables. Trunk and Ground Cables The Trunk Cable is an electro-optical submarine telecommunications cable landed at Site 1, and installed out to the STOTO J-box location (located in the north-west section of the STOTO Culde-Sac). The Trunk Cable consists of two TYCO SL17 segments. Segment 1 was laid from AUTEC Site 1 to a deep water telecom joint site in the South TOTO, approximately 140 km in length. Segment 2 was joined to the STOTO J-Box Trunk Tether Cable and laid from the J-Box to the Deep Water Joint Site, approximately 20 km in length for a total Trunk Cable length of approximately 160 km. A Universal Joint splice was installed to join the two telecom cables. Figures 3a-3d show diagrams of the four different configurations of TYCO SL17 Cable. To ensure long life, the cable in the shore landing and STOTO J-box areas was double armored in water depths between 0 and 250 meters and single armored between 250 and 500 meters. The Trunk Cable was double armored on shore, in the shallow areas and down the steep escarpment, single armored down the slope, SPA Type (steel tape around core) through the AUTEC Weapons Range and the TOTO, and LW (lightweight) type in the Southern Cul-de-Sac of the TOTO. The Trunk Ground Cable was a 2 km length of TYCO SL17 SA Cable installed from the Site 1 CCB (Command Control Building) to the shallow water area just beyond the Site 1 reef cut. It was connected to a bare steel sea water ground (cathode), anchored to the seabed. Array Cables Figure 2 STAFAC Telecom Cables There are two array cables, both extending from the STOTO J-box to the array site (one to the north array, and one to the south array). Each cable is an electro-optical telecom-type cable (similar to the trunk cable above). The total lengths of the North and South Array Cables are approximately 14 and 16 km, respectively. Both cables are double armored in the shallow water area of the STOTO J-box and down the escarpment, and single armored in the upper portion of the escarpment. The remaining portion of cable is SPA type cable. Umbilical Riser Cables The Umbilical Riser Cables are torque balanced cables used to transmit the signal/power from the array cables (described above) through the water column to the array components (connection at a depth of approximately 380 feet). This cable is a high density polyethylene (HDPE) coated, double armored, electro-optical-mechanical (EOM) cable produced by South Bay Cable. The STAFAC System also incorporates a Tracking and Underwater Communications (TUC) sub-system. The TUC Cables are TYCO SL17 Cable segments that extend from the STOTO J-Box to the array site. Integral to this cable are TUC Bi- Directional Acoustic Nodes that provide positional data for tracking in addition to digital communications with vessels throughout the test site. The total length of this cabled array is approximately 33 km. The TUC cables consist of a TYCO SL17

DA TUC Tether Cable Segment from the J-Box to an SA to a SPA segment to the instrumented SPA array segment. Figure 3-c TYCO SL17 Single Armor (SA) Figure 3-a TYCO SL17 Lightweight (LW) Figure 3-d TYCO SL17 Double Armor (DA) Figure 3-b TYCO SL17 Special Application (SPA) STOTO Junction Box An underwater junction box was necessary to manage and connect the four system cables (the trunk cable, two array cables, and one tracking cable). To minimize the amount of cable required for STAFAC, and provide easy access for serviceability, the junction box was located in 50 feet of water. Hinged doors are designed to allow diver access for underwater maintenance and inspection. The armor sections of the four TYCO SL17 DA cables are mechanically terminated on the front end of the J- Box Frame. Fifty feet of Cable Core (SL17 LW) service loop is secured within the J-Box enclosure, and custom terminated to the J-Box Instrumented Pressure Vessel (IPV) electronics housing. The electronics housing is approximately 21 inches in diameter and 60 inches long. Figure 4 shows the Solid Works design of the STOTO J-Box. Figure 5 is a photo of the J-Box installed on the ocean floor.

This J-Box Frame is designed to be stable on the seafloor while providing a means to be raised and lowered in a water depth of 50 feet. The junction box is raised and lowered with cables as an assembly with a hinge point on the seafloor as the installation vessel moves along the cable track. Shallow Floats: 105 ft Umbilical Buoys: 850 ft Main Mooring Buoys: 1400 ft Counterweights: 3,000 ft Anchors: 4,442 ft Subsurface Buoys: 140 ft Depth North Figure 4 STAFAC Junction Box Figure 5 STAFAC J-Box Installed on Seafloor Array Mooring Components As illustrated in Figure 6, the STAFAC Arrays are fixed to the seafloor by a single four-point mooring, with two main mooring buoys connected by a crosswire. The mooring assembly anchors both sensor strings at a fixed seafloor location and maintains their lateral separation at the specified distance of 280 (+20 0) yards, and at a differential depth tolerance of less than 10 feet. Figure 6 STAFAC Primary Mooring Configuration The four-leg mooring is designed to hold two false bottom (main mooring) buoys as stationary as possible in all typical current profiles. Each buoy is made of syntactic foam with 12,000 lbs of buoyancy. A wire rope mooring line secures each anchor to each main mooring buoy. A cross-wire permanently holds the two main mooring buoys a fixed distance apart (to maintain accurate array separation). A plastic jacketed wire rope counterweight cable and a counterweight, consisting of stacked railroad wheels, was installed by passing the cable through a center hole in each main mooring buoy. A DELRIN stopper was fastened to the counterweight cable to mechanically adjust and set the depth of the array. This arrangement allows for easy lifting of the array for servicing, without moving the mooring or anchors and legs. The stopper enables the array to be automatically repositioned vertically when it is lowered back into its socket. All mooring legs are structural only, with no incorporated telemetry or power cables required. To provide fish-bite protection, the mooring lines and counterweight cables are 5/8 inch diameter NILSPIN Wire Rope. The cross-wire and interconnecting array wires are ¾ inch NILSPIN. Each array main mooring segment is anchored to the bottom of STOTO at a depth (referenced to the center of the arrays) of approximately 4400 feet. Figure 6 shows the nominal design anchor positions for the four- point mooring and two umbilical cables. Main mooring clump weight anchors with Bruce drag embedment anchors were selected to resist the resultant vertical and horizontal reaction loads. The clump anchor resists the entire vertical component of the load and acts as a depressor for the Bruce anchor, which in turn provides all of the horizontal resistance. Photos of the Bruce Anchors and the main mooring clump anchors are shown in Figures 7 and 8.. The clump and Bruce anchors are arranged in tandem, connected by 1-½ inch chain.

1.4 nm 727, -1400 yd 727, 1400 yd 407, -288 yd 407, 288 yd 0, -125 yd 0, 125 yd North 0.72 nm -727, -1400 yd -727, 1400 yd Figure 7 Main Mooring Bruce Anchors Figure 9 Nominal Mooring Anchor Positions Umbilical Anchors Stacked railroad wheels were used to fabricate the umbilical anchors, as shown in Figures 10 and 11. Torque balanced Umbilical riser cable Fish plate w/ third hole for load transfers Dyna-grip w/ rods for riser cable Breakout bottle and anode Dyna-grip w/ rods for array cable Rotating bale SL17 ARRAY CABLE Figure 8 Main Mooring Clump Anchor The four mooring anchors (dry weight 8,650 lbs), were connected by 30 feet of 1-½ inch chain, to a Bruce drag anchor (dry weight 3,300 lbs), with another 30 feet of 1-½ inch chain to the mooring wire rope as shown in Figure 9. This arrangement efficiently resists both the vertical and lateral tension in the oblique mooring legs. Structural frame and rail wheels for umbilical anchor (8 kip dry, 6560 wet) Figure 10 Umbilical Anchor Design

Bellmouth bolts onto pipe flange top and bottom Lift eyes around bellmouth Mooring cables and cross wire attach to the reinforced bottom section padeyes Figure 11 Umbilical Anchor Prior to Installation Mooring Lines Wire ropes are used to connect between the anchors and main mooring buoys. Main anchor leg lengths are 5400 feet, sufficient to install the anchors to the bottom in 4400 feet of water. NILSPIN 3x19 plastic jacketed wire rope was chosen, (1) to eliminate fish bite concerns, (2) for its torque balance properties, and (3) for its corrosion resistance. Figure 12 Main Mooring Buoy The Main Mooring Buoy Assemblies, shown in Figures 12 and 13, each consist of a cylindrical, 7 foot diameter by 10 foot high syntactic foam filled polyethylene molded shell. The net buoyancy of the assembly is approximately 12,000 lbs. The main mooring buoys are located at approximately 1400 feet depth or 3050 feet above the seafloor. Each main mooring buoy assembly weighs approximately 10,000 lbs in air. Main Mooring Buoys The two Main Mooring Buoys provide tension to stabilize the 4-point Primary Mooring and to support the Counterweights. They also provide positioned through-points for the Counterweight Cables to secure, via the Counterweight Stoppers, the two HGMS Arrays, as shown in Figure 9. Figure 13 Main Mooring Buoy Installation Umbilical Buoys There are two Umbilical buoys, each consisting of a segmented syntactic foam cylinder, with 8,000 lb net buoyancy (Figure 14). Both buoys are 96 inches diameter by 64 inches high. The two umbilical cables were secured to the seafloor with the

two umbilical anchors (in-air weight 9,000 lbs). At the anchor, these vertical umbilical cables were spliced to the bottom laid SL17 telecom array cables with a custom designed electro-optical-mechanical splice. Figure 16 Bend Limiter Frame Design Figure 14 Umbilical Buoy Frame Detail Umbilical Limiting Frame An Umbilical Bend Limiting Frame was secured to the base of the buoy to connect and manage the minimum bend radius of the umbilical cable during deployment and operation for the life span of 15 years. The configuration of the bend limiter is shown in Figure 15. The Frame design, shown in Figure 16, incorporated two Preformed Marine in-line Dyna-Hangers, custom designed to allow limited rotation within the within the Frame mounting structure. High Gain Array Assembly and Support Buoys The High Gain Arrays are approximately 900 feet long, and are populated with approximately 800 acoustic sensors. Each array assembly is supported in the water column by Sub-Surface Buoys. These cylindrical buoys are 83 inch diameter by 88 inches high syntactic foam filled polyethylene shells, mounted on a steel center strength member. The net buoyancy is 10,000 pounds. They are located at a nominal depth of 135 feet. A smaller, 36 inch diameter spherical buoy is attached above this to provide for an upper acoustic sensor at a relatively shallow depth but safe for shipping traffic. This buoy was constructed with very high density syntactic foam to minimize acoustic reflections. Upper Umbilical lowered from ship Umbilical flotation Armor Rods - BSR extended past abrasion points Silicon Bronze Grip Lower portion of umbilical cable Figure 15 Bend Limiter Configuration Figure 17 Sub-Surface Buoys CONCLUSIONS The designs of the STAFAC in-water systems followed basic ocean engineering principles. Dissimilar metals were isolated to prevent galvanic corrosion, materials were selected to meet the system

life requirements in the ocean, and stress analyses were conducted for all loaded structures. The Umbilical Buoys were uniquely designed to support the Umbilical Cables during deployment, service, and retrievals. The modified PMI Dyna-Hangers provided two pivot points to allow the cable to follow the curvature from the taut buoyed riser to the weighted catenary section without violating the minimum bend radius of the electrooptical-mechanical cable. This unique umbilical counterweight system design allows the arrays to be retrieved and reinstalled without ever having to lift any anchors off the bottom, reducing deck gear requirements and eliminating the need for a precision USBL system, used for the initial installation. The STAFAC system is a robust design that fulfills the requirements and includes flexibility for future servicing and replacement of components if required. Phil DeNolfo, is a Technical Program Manager in the Ranges, Engineering, and Analysis Department at NUWCDIVNPT, Newport, Rhode Island. He is also the Ocean Engineering Team leader for that Department. He has over 35 years experience in designing and installing government marine cable and buoyed sensor systems. (Philip.DeNolfo@navy.mil) Hugh Thomson, PE is a Project Leader in the Ocean Facilities Department at the Naval Facilities Engineering Service Center, Port Hueneme, CA. He has more than 25 years of ocean engineering experience in designing and installing cable structures and systems in the ocean. (Hugh.Thomson@navy.mil) Michael R. Harrison PE, is a project manager and senior engineer at Sound & Sea Technology, Ventura CA. He has over 25 years experience designing and installing government marine cable and sensor systems, and commercial telecom marine cable systems. (mharrison@soundandsea.com) Mark Greise PE, is a senior project engineer at Sound & Sea Technology, Ventura CA. He has over 20 years experience designing and installing government marine cable and sensor systems, shipboard handling systems, and commercial telecom marine cable systems. (mgreise@soundandsea.com)