Hospital Link Project Project Update November 2017

Similar documents
Hospital Link Project Project Update September 2017

Design Criteria. Design Criteria

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

2017 Temporary traffic control guidelines for pedestrians. v.2

PROJECT FACT SHEET May 25, 2018

Cincinnati Dayton Rd Widening

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Traffic Control Inspection Checklist Segment:

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

COMPLETE STREETS DURING CONSTRUCTION

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

5. RUNNINGWAY GUIDELINES

PROJECT FACT SHEET March 21, 2018

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

INDEX. Geometric Design Guide for Canadian Roads INDEX

CPC Parking Lot Riverside Drive. Transportation Rationale

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

IL Route 71 Construction Update

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Rio Intersection Traffic Restrictions Begin Monday

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Functional, Preliminary Design and Detailed Design

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Spring/Summer Traffic and Construction Technical Briefing

ADA on Construction. Guidance for Section C Plan Preparers

Accommodating Pedestrians in the Work Zone

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

FDOT Treasure Coast Traffic Impact Report

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Agenda Item # Page # RECOMMENDATION

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Complete Streets. Designing Streets for Everyone. Sarnia

City of Margate, Florida. Neighborhood Traffic Management Manual

section 4 Existing Conditions, Issues, and Options

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

A5.1 Permitted activities

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

St. Francis Drive through the City of Santa Fe Corridor Study

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

^ Lee County So^mst <T:[oV1]^ Lee County

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Zlatko Krstulich, P.Eng. City of O9awa

APPENDIX L. Design Criteria

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Traffic Management Guidelines for Structure Rehabilitation Projects

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

^Lee County Jt Sotft^West T:foH^a Lee County

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

19 July 2016 OUR REF:

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

3.9 Recreational Trails and Natural Areas

Downtown Redevelopment Project Update

CITY OF ROSEVILLE DESIGN STANDARDS

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

The purpose of today s information session is to provide project information about the Fermor Avenue Bridge Rehabilitation and Roadworks.

Route 29 Solutions Projects

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Access requests to County streets and roadways are processed through one of the following methods:

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Healthy Hospitals Physical Activity Scan * Required

CASTLE CREEK CORRIDOR PLANNING PUBLIC OPEN HOUSE

Living Streets Policy

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

FDOT Treasure Coast Traffic Impact Report

MARTIN LUTHER KING JR. WAY

^ Lee County ^OU fewest T:foH^ Lee County

Chapter 3 DESIGN SPECIFICATIONS

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

Washington St. Corridor Study

Purple Line Extension Community Meeting

Blair/Williamson Intersection Expressed Needs

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Appendix 3 Roadway and Bike/Ped Design Standards

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

Section 7 Complete Green Street Guidelines DRAFT

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Appendix A Guiding Principles for Cycling Safety in Work Zones

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Geometric Design Tables

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Transcription:

Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important construction updates. Construction Forecast Over the next month, neighbours can expect the following impacts: Level of dust will be low to medium. North Level of noise will be low to medium. Level of vibration will be low. Key Plan of Hospital Link Level of construction traffic will be medium to high through Hincks Lane, Frobisher Drive, Old Riverside Drive, and Alta Vista Drive. Work Completed to Date Dust monitoring equipment is installed near the VIA corridor and Old Riverside Drive. Riverside Drive is in its final configuration. All four lanes of traffic are now open. All the new mainline storm sewers have been installed on the project except for sections between Old Riverside Drive and Alta Vista Drive and at the east end of the Hospital Link. The 914 mm feedermain is commissioned. A new large diameter storm sewer is constructed from the Rideau River easterly toward Old Riverside Drive. Installation of the 2400 mm x 1800 mm box storm sewer between the Transitway and the VIA shoring wall is complete. The Riverside Structure is mostly complete except for expansion joints seal installation and testing. The Transitway Structure, sidewalks, approaches, barriers, and adjacent retaining walls are constructed.

- 2 - Construction of the VIA structure and VIA culvert north of the structure is complete. The VIA Mainline Track is in service over the new VIA bridge. The temporary shoring wall has been decommissioned and removed. The majority of underground traffic plant and street lighting infrastructure has been installed west of Riverside Drive and between Alta Vista Drive and the Hospital Ring Road. New Hydro Ottawa plant has been installed with sections along the east side of Realigned Riverside Drive, along the Hospital Link from the substation on Old Riverside Drive to Ring Road, along the Hospital Link east of Alta Vista and along Alta Vista Drive. Removal of all overhead Hydro Ottawa power cables and relocation to the new underground duct bank on Old Riverside Drive is complete. The north cul-de-sac on Old Riverside Drive is partially built, including placement of asphalt. Old Riverside remains permanently truncated where the Hospital Link crosses it with a pedestrian detour in place. Construction of the retaining walls at Old Riverside Drive and adjacent to 1725 Old Riverside are complete. Storm sewer installation on Frobisher Lane between Realigned Riverside Drive and Old Riverside Drive is completed. Storm sewers between Alta Vista Drive and the Transitway are completed excluding the remaining installations of the Moses Pepper Drain. Storm sewers on Old Riverside Drive east of the Transitway structure are complete. Grading and maintenance of landscaping along Realigned Riverside Drive is complete. Grade raises along the VIA mainline and utility relocations at the VIA structure are complete. Riverside Structure deck paving is complete including installation of expansion joints and construction of the parapet walls. Concrete medians and islands at the Riverside Drive/Hincks Lane intersection are completed. Maintenance shoulders have been reinstated along the Transitway. Landscaping and sidewalks are completed at the Riverside Drive and Hincks Lane intersection. Hospital Ring Road roadway construction is complete and commissioned for Hospital Traffic. Construction of approaches, sidewalks and barrier walls on the Transitway structure are complete. Key Activities this Month The key activities anticipated for the month of November 2017 include: Alta Vista Drive and Future Link Road intersection Roadway construction for the intersection of Alta Vista Drive and Link Road will continue in November 2017. Lane width reductions with reduced speeds will remain in place along Alta Vista Drive. The bike lane will remain closed on Alta Vista Drive. The temporary pedestrian detour will remain in place with pedestrians routed on the sidewalk along the east side of Alta Vista until the final configuration of the Alta Vista Intersection is commissioned.

- 3 - Realigned Riverside Drive Final grading and landscaping along Realigned Riverside Drive will continue in November. Old Riverside Drive Construction of the north and south cul-de-sacs on Old Riverside Drive will be completed in November 2017. Frobisher Lane Frobisher Lane bridge modifications and construction of the multi-use pathway over Frobisher Bridge will be completed by early November 2017, the traffic and pedestrian control plan will remain in place. The multi-use pathway will tie-into the south cul-de-sac on Old Riverside Drive. The sidewalk between the Frobisher Bridge and Realigned Riverside Drive will be connected in November 2017. Connection to Hospital Property Final grading and landscaping will continue in November 2017. Transitway Structure and Retaining Walls Waterproofing and placement of asphalt will be completed by November 2017 for the Transitway Bridge. VIA Rail Structure and Track The slope paving and toe wall in front of the abutment walls may be constructed in November. Final landscaping in the VIA corridor including fencing, topsoil and seeding will be continue in November 2017, weather permitting. Riverside Structure Riverside Structure expansion joints will be sealed and tested following completion of asphalt and surfacing on the approaches to the bridge. Storm Sewer Installation Remaining installations of the Moses Pepper Drain will be completed in November 2017. Construction of the box culvert Moses Pepper Drain Inlet east of VIA corridor will be completed in November 2017. Traffic Impacts The project has been designed to mitigate lane closures along Riverside Drive and Alta Vista Drive as much as possible. The following activities summarize the anticipated traffic impacts expected over the next month:

- 4 - Traffic Impacts There will be no weekday peak period lane reductions on Riverside Drive or Alta Vista Drive. Temporary lane width reductions with reduced speeds will continue along Alta Vista Drive for construction of the Alta Vista/Link Road intersection. Traffic will remain shifted to the west side until the final configuration of this intersection. The bike lane will remain closed on Alta Vista Drive. Temporary lane width reductions with reduced speeds will be present on Frobisher Lane for construction of bridge modifications. Concrete barriers will be in place around the work zone, both lanes will remain open. There are no significant traffic impacts affecting vehicles, or cyclists expected on Riverside Drive. Old Riverside Drive is permanently closed to traffic, pedestrians and cyclists where the Hospital Link crosses it. Pedestrians are detoured on Realigned Riverside Drive. Access to all residents by motor vehicle is maintained through one access point at each end as follows: 1541 to 1635 Old Riverside, access Old Riverside by Hincks Lane. 1725 to 1841 Old Riverside, access Old Riverside by Frobisher Lane. General Traffic Information Motorists are reminded to obey reduced speed limits within construction zones and exercise caution when driving through active construction sites. Motorists are notified of changes to traffic patterns using Portable Variable Message Signs. Protected left turn signals are installed for south-bound traffic at the intersection of Frobisher Lane and Realigned Riverside Drive, and at the intersection of Hincks Lane and Realigned Riverside Drive. Lane width reductions on Alta Vista Drive and staged traffic plans will continue in November 2017. The roadway lane will continue to be shared between motorist and cyclists. Lane width reductions on Frobisher Drive and staged traffic plans will continue in November 2017. Construction vehicles will be entering and exiting the work areas listed below. The access will be similar to any private access location and flag personnel will be posted as required if potential traffic issues are identified. Alta Vista Drive; East of Riverside Drive accessed through Hincks Lane traffic signals; The Transitway work area accessed through Old Riverside Drive and Frobisher Lane; The VIA work zone accessed through west of Alta Vista intersection. Old Riverside Drive accessed from the north through Hincks Lane and from the south through Frobisher Lane. Pedestrian Impacts Temporary pedestrian detour to the sidewalk along the east side of Alta Vista will continue in November 2017. The following sidewalks will remain temporarily closed to pedestrians: Crosswalks through the intersection of Hincks Lane and Riverside Drive Old Riverside Drive remains truncated where the Hospital Link crosses it, and is permanently closed to pedestrian traffic through this area. Pedestrians are detoured through Frobisher Lane, the new

- 5 - multi-use pathways along the east side of Realigned Riverside Drive, and the Lycée Claudel OC Transpo Transit Station. Transitway Impacts There may be potential lane reductions during off peak hours on the Transitway for the construction of Frobisher Bridge modifications as well as crack injections on the Transitway bridge. Weekend and Night Work All night work is subject to the approved Noise By-law exemption. Residents in close proximity to the work will be provided with advance notice when night work is required. The following activities summarize the anticipated weekend or night work over the next month: Weekday night work may be required along Riverside Drive for grading and landscaping and on the Link Road from Old Riverside Drive to Alta Vista Drive. Weekend night work may occur in November 2017 for construction along the Hospital Link roadway. VIA Rail has a rail replacement project throughout their corridor including adjacent to the Hospital Link site. VIA may be doing night work outside of the contract limits.

- 6 - Project Pictures The following pictures are provided for your information. Hospital Ring Road intersection Roadway construction between Old Riverside Drive cul-de-sacs and the Transitway structure

-7- Construction of underground utilities through Alta Vista Intersection Construction of Hospital Link outlet headwall

- 8 - Construction of the Hospital Ring Road under the VIA structure Construction of the Transitway bridge approaches

- 9 - Grading and landscaping at Realigned Riverside Drive near the new Riverside Structure