Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials

Similar documents
Reinstatement of sub-base and base (roadbase) in non-bituminous materials

Monitoring excavation in the highway

Reinstatement in hot-lay bituminous materials

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)

Reinstatement in Hot-lay Bituminous Materials

Location and Avoidance of Underground Apparatus

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

A best practice guide produced in collaboration between

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

Employer s Unit of Competence Magnetic particle testing of materials, products and plant

PERSONAL PROTECTIVE EQUIPMENT GUIDANCE

Working safely in an engineering environment

Level 3 Diploma in Moving Loads in Construction. Qualification Specification

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

SEMFWE SQA Unit Code H1W9 04 Forming platework using power rolling machines

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

CONSTRUCTION SPECIFICATION

Geotechnics, Face and Stockpile Operations

SUMBSE01 - SQA Code HC85 04 Apply health and safety and environmental legislation in the building services engineering sector

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.

Personal Protective Equipment (PPE)

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

QCF Unit and Assessment Specification

Temporary Vehicle Restraint System Policy

Cutting and shaping materials using thermal cutting equipment

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Safety at Street Works and Road Works

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

COGPOLY39 Meet safety, health and environmental requirements in the workplace

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

This standard comprises the following:

SEMMME3-073 Checking that completed assemblies comply with specification

Participate in a rescue operation

Method Statement: Testing Dry Riser System

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Hampstead Hill School Health and Safety Policy: Confined Spaces

Pre-control risk estimate. Likelihood Risk

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS


1.8 INDUSTRIAL PROCESS WEIGHING IN HAZARDOUS AREAS

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Generic Risk Assessment (Firework Display)

PPE used by shore based council marine staff

Method Statement Author

PRESSURE SYSTEMS POLICY

Downloaded from Downloaded from /1

Specific Accreditation Criteria Calibration ISO IEC Annex. Mass and related quantities

Vacuum Excavation in the vicinity of the Wellington Electricity Network

RESTORATION PROCEDURES

APPENDIX D HYDRO-VAC

Risk assessment part 1 of 3

SECTION 11 ADVENTUROUS ACTIVITIES BOATING: SAILING

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

NPTC LEVEL 2 AWARD IN THE SAFE USE OF PESTICIDES (QCF) MODULE PA4S PESTICIDE SLUG PELLET APPLICATOR

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DRAFT INTERIM ADVICE NOTE 150/17

PLANT RISK ASSESSMENT REPORT

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

United Gas Derivatives Company UGDC. Guidance for the Selection and Use of Personal Protective Equipment (PPE) Procedure

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

SEMFWE3-33 SQA Unit Code HF2X 04 Cutting and shaping materials using portable thermal cutting equipment

NZQA registered unit standard version 2 Page 1 of 5. Press wood veneer into plywood and laminated veneer lumber

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

Chapter 8 (2009) - Summary of key changes

C5: Control Emergencies and Critical Situations

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

SFHCHS132 - SQA Code HD10 04 Obtain venous blood samples

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Hazardous Energy Control

State of Oregon Department of Public Safety Standards and Training. Driver Task Book. Task Book Assigned To:

Safe work method statements

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

DL00 04 (SFH CHS132) Obtain Venous Blood Samples

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Waste Industry Safety & Health

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

Safe Work Method Statement

SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment

Health and Safety Code of Practice. SCP38 Working at Height

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

PERFORMANCE CRITERIA

Table of Contents. I. Introduction 1. II. Elements of the School Crossing Program 1

Transcription:

This unit covers the requirements that you must meet when monitoring the reinstatement of sub-base and base. You must ensure that you act in accordance with all current specifications and procedures and that you follow safe working practices at all times when carrying out the activities covered in this unit. The Code of Practice specified in this unit is Specification for the Reinstatement of Openings in Highways. The unit contains the following four elements, which you must cover: 13.1 Monitor selection of non-bituminous materials for use in carriageway and footway reinstatement 13.2 Monitor selection of plant used for the compaction of sub-base and base (roadbase) material 13.3 Monitor construction of sub-base and base (roadbase) materials 13.4 Monitor site safety In element 13.1, you will monitor the selection and storage of non-bituminous materials for use in reinstatement. You must ensure that appropriate materials are selected for use and that the on-site storage arrangements for materials are appropriate and safe. You will also need to check that sufficient quantities of materials are obtained for the prescribed operation, and to demonstrate that you know the remedial action to take where you identify any deficiencies in the selection and storage of the materials. In element 13.2, you will need to monitor the selection of the compaction plant for the sub-base and base (roadbase) materials, ensuring that the appropriate considerations are taken into account, including its efficiency, its suitability to the location, materials and site dimensions and access provisions, and that it is the most suitable plant to use when compared with other permitted options. You must also ensure that the necessary safety checks have been carried out to ensure that the equipment is fit for purpose. Where you identify any problems with the selection of the plant, you must show that you know the appropriate remedial action to take. In element 13.3, you will monitor the construction of the sub-base and base (roadbase) materials, checking that the layer is constructed according to the specification, and that appropriate equipment and materials are used for the operation. You must also check that the layers are constructed with the appropriate compaction level, and that they are of the required thickness and degree of compaction. You will need to show that you know the remedial action to take where any problems are identified with the construction of the layers. In element 13.4, you will monitor site safety throughout the reinstatement operation, ensuring that health and safety requirements are met in respect of site operations and site conditions. You will need to ensure that the appropriate equipment is available on site, in sound working condition, and that safe working practices are followed throughout the operation. You must show that you know what action must be taken to remedy any risks to site safety. Please note: You must use the following measurements when undertaking this unit: linear metric volume (cubic metres) percentage density (tonnes (Mg) per cubic metres) crushing strength (Newtons per square millimetres) Street Works Unit 13 (April 2003) Page 1 of 11

Element 13.1 Monitor selection of non-bituminous materials for use in carriageway and footway reinstatement Performance criteria You must show that: a) you ensure that excavated and imported materials selected for use are correctly identified and checked against the range of permitted sub-base and base (roadbase) materials b) you ensure that the quantities of materials selected for use are sufficient to meet the requirements of the reinstatement operation c) you ensure that appropriate and safe storage arrangements are made for the re-usable and imported materials that meet the requirements of current specifications and procedures d) you ensure that safe working practices are followed for the selection and storage of materials for reinstatement of sub-base and base that are in accordance with current relevant specifications and procedures e) you identify any problems with the selection and storage of materials for use as sub-base and base (roadbase) and demonstrate that you know the appropriate remedial action to be taken Knowledge requirements You need to know: 1 the range of materials permitted in the specification for use in sub-base and base (roadbase) 2 the factors influencing the selection of materials for use in sub-base and base (roadbase), and the consequences of using unsuitable materials for sub-base and base (roadbase) Related performance criteria a a 3 how to ensure that the correct quantities of materials are selected for use b 4 appropriate and safe on-site storage procedures for re-usable and imported materials c 5 safe working practices for the selection and storage of materials for use as sub-base and base (roadbase) 6 problems which occur when selecting and storing materials for use as sub-base and base (roadbase) and the appropriate remedial action to be taken all e Range to be covered I. You must show that materials include: i. granular Type 1 sub-base materials ii. excavated granular sub-base materials iii. category 3 cement bound material iv. alternative reinstatement materials (ARMs) II. You must show that specifications and procedures are: i. Health and Safety Executive Guidelines (HSG 185: Health and Safety in Excavations) ii. Specification for the Reinstatement of Openings in Highways Street Works Unit 13 (April 2003) Page 2 of 11

Element 13.1 Monitor selection of non-bituminous materials for use in carriageway and footway reinstatement Range to be covered (contd.) III. You must show that safe working practices include: i. safe use of tools and equipment ii. use of appropriate personal protective equipment, including as necessary: high visibility jacket or waistcoat dust mask hard hat gloves ear defenders protective footwear eye protection visor/goggles waterproof clothing iii. use of risk assessment methods to identify and control any hazards on site iv. precautions to minimise danger or inconvenience to road users v. precautions to minimise danger or inconvenience to site personnel vi. precautions to minimise damage to equipment or apparatus Evidence requirements Your evidence must cover all the performance criteria, all the knowledge requirements and all the range items listed in this element. You must complete the following tasks for a reinstated excavation in an actual or simulated footway or carriageway: A. Monitor the selection of excavated and imported sub-base and base (roadbase) materials. B. Monitor the on-site storage arrangements made for materials to be used. Specification of works - The assessment must take place at a site with physical characteristics that conform to the definition of street at section 48 or road at section 107 of the New Roads and Street Works Act 1991. Assessment conditions - The assessment will be undertaken by a qualified assessor, who will observe you monitoring the selection of non-bituminous materials for use in carriageway and footway reinstatement. - The site at which you are assessed must conform to the specifications listed above. Real equipment must be used, that complies with the requirements of the Code of Practice. - It is recognised that candidates for this unit are sometimes observed monitoring reinstatement activities as shown on video. Where this takes place, the video used must meet the following requirements: a) the reinstatement activities shown must conform to the specification detailed above b) the activities shown must allow candidates to carry out all the tasks specified above, and must cover the performance standards for this element in full. - If you are observed monitoring the reinstatement of sub-base and base (roadbase) as shown on a videotape, you must provide supplementary evidence of competence from the workplace. Where this includes a documented observation report, a qualified Street Works supervisor or assessor must provide this. Street Works Unit 13 (April 2003) Page 3 of 11

Element 13.1 Monitor selection of non-bituminous materials for use in carriageway and footway reinstatement Evidence requirements (contd.) Additional information for candidates and assessors - The adopted specification for the works should correspond to the Specification for the Reinstatement of Openings in Highways. The following sections of the Specification provide particular guidance on various items within the performance criteria: i. S1.6.3 allows alternative options such as stabilised materials to be used as surround to apparatus, and at backfill and sub-base layers, provided they meet the relevant performance requirements of this Specification. ii. S5 deals with classification of backfill material, whether imported to site or derived on-site from excavated materials, including alternative reinstatement materials (ARMs) and those used as surround to apparatus. iii. S6.2 and S6.3: Sub-base and base (roadbase) materials respectively. iv. NG5.1 and NG5.3: Requirements of conventional and alternative backfill materials, respectively. v. A1: Necessary properties of backfill materials. vi. A9: Properties of the alternative reinstatement materials. vii. A11.2 and A11.3: Material specifications for base (roadbase) and surface course materials. Street Works Unit 13 (April 2003) Page 4 of 11

Element 13.2 Monitor selection of plant used for the compaction of sub-base and base (roadbase) material Performance criteria You must show that: a) you ensure that the efficiency of the compaction plant selected is checked for suitability to the location and materials b) you ensure that the selected compaction plant is checked for suitability to the dimensions and access provisions of the site c) you ensure that the selected compaction plant is the most suitable one to use when compared to the other permitted options d) you ensure that safety checks have been carried out to ensure that the selected compaction plant is fit for purpose e) you ensure that safe working practices for the selection and use of plant are followed, that are in accordance with the current relevant specifications and procedures f) you identify any problems with the selection of the compaction plant and demonstrate that you know the appropriate remedial action to be taken Related Knowledge requirements performance criteria You need to know: 1 the factors to consider in selecting a compaction plant that is suitable to the location and materials 2 how to check the suitability of a compaction plant to the dimensions and access provisions of the site a b 3 how to select the most suitable compaction plant from several permitted options c 4 how to ensure that the compaction plant is fit for purpose d 5 safe working practices for the selection and use of compaction plant all 6 problems which occur when selecting plant for the compaction of sub-base and base material and the appropriate remedial action to take Range to be covered I. You must show that compaction plant includes: i. vibrotamper ii. vibrating plate iii. vibrating roller iv. percussive rammer f II. You must show that safe working practices include: i. safe use of tools and equipment ii. use of appropriate personal protective equipment, including as necessary: high visibility jacket or waistcoat hard hat ear defenders eye protection visor/goggles dust mask gloves protective footwear waterproof clothing iii. use of risk assessment methods to identify and control any hazards on site iv. precautions to minimise danger or inconvenience to road users v. precautions to minimise danger or inconvenience to site personnel vi. precautions to minimise damage to equipment or apparatus Street Works Unit 13 (April 2003) Page 5 of 11

Element 13.2 Monitor selection of plant used for the compaction of sub-base and base (roadbase) material Range to be covered (contd.) III. You must show that specifications and procedures are: i. Health and Safety Executive Guidelines (HSG 185: Health and Safety in Excavations) ii. Specification for the Reinstatement of Openings in Highways iii. manufacturer s operating procedures for powered equipment Evidence requirements Your evidence must cover all the performance criteria, all the knowledge requirements and all the range items listed in this element. You must complete the following task for an actual or simulated site situation: A. Monitor the selection of compaction plant for the compaction of sub-base and base (roadbase) material. Specification of works - The assessment must take place at a site with physical characteristics that conform to the definition of street at section 48 or road at section 107 of the New Roads and Street Works Act 1991. Assessment conditions - The assessment will be undertaken by a qualified assessor, who will observe you monitoring the selection of a plant for compaction of sub-base and base (roadbase) material. - The site at which you are assessed must conform to the specifications listed above. Real equipment must be used, that complies with the requirements of the Code of Practice. - It is recognised that candidates for this unit are sometimes observed monitoring reinstatement activities as shown on video. Where this takes place, the video used must meet the following requirements: a) the reinstatement activities shown must conform to the specification detailed above b) the activities shown must allow candidates to carry out all the tasks specified above, and must cover the performance standards for this element in full. - If you are observed monitoring the reinstatement of sub-base and base (roadbase) as shown on a videotape, you must provide supplementary evidence of competence from the workplace. Where this includes a documented observation report, a qualified Street Works supervisor or assessor must provide this. Additional information for candidates and assessors - The adopted specification for the works should correspond to Specification for the Reinstatement of Openings in Highways. The following sections of the Specification provide particular guidance on various items within the performance criteria: i. S10 (Compaction Requirements) gives a detailed account of the range and limitations of the use of different compaction plants, including: S10.3 (Equipment Operation and Restrictions) requires all compaction equipment to be used in accordance with the requirements of Appendix A8. NG10.3.6 (Other Compaction Equipment) permits the use of other compaction plants not referenced in Appendix A8. Machine-mounted, modified and other alternative compaction equipment may be permitted for the compaction of reinstatement materials, in accordance with the relevant requirements. ii. NG1.6 (Alternative Compaction Equipment) allows the use of alternative compaction equipment, including any compaction devices not specifically permitted within Section S10 and Appendix A8, providing it has been proven to be capable of achieving the same degree of compaction as any other option permitted in Appendix A8. iii. Appendix A8 (Compaction Requirements) provides details regarding the amount of compaction necessary for various compaction plants. Street Works Unit 13 (April 2003) Page 6 of 11

Element 13.3 Monitor construction of sub-base and base (roadbase) materials Performance criteria You must show that: a) you ensure that the backfill or surround has been adequately prepared to receive subsequent layers b) you ensure that the non-bituminous layer is constructed in accordance with the specification, the existing pavement structure and road type and using appropriate materials and powered equipment c) you check that the layers are constructed correctly using the appropriate measuring equipment, with regard to the use of materials and appropriate powered equipment, layer thickness and degree of compaction d) you check for correct construction of sub-base and base (roadbase) in sensitive areas e) you ensure that safe working practices are followed for the reinstatement and compaction of sub-base and base (roadbase) that are in accordance with current relevant specifications and procedures f) you identify any problems with the construction of the layers and demonstrate that you know the appropriate remedial action to be taken Knowledge requirements You need to know: 1 how to identify when the backfill or surround is adequately prepared to receive subsequent layers 2 how to interpret the specification accurately with regard to the construction of the nonbituminous layer for different pavement structures and road types 3 how to check the construction of the layers for the correct use of materials, achieved compaction level, layer thickness and degree of compaction 4 the appropriate equipment to use for carrying out checks on the construction of the subbase and base (roadbase) Related performance criteria a b c b, c 5 how to check the construction of sub-base and base (roadbase) in sensitive areas d 6 safe working practices for reinstatement of sub-base and base (roadbase) in nonbituminous materials 7 problems which occur during construction of sub-base and base (roadbase) and the appropriate remedial action to take all f Range to be covered I. You must show that the materials include: i. granular Type 1 sub-base material ii. excavated granular sub-base materials iii. category 3 cement-bound material iv. alternative reinstatement materials (ARMs) II. You must show that measuring equipment used includes: i. measuring equipment including measuring devices, rule and tape III. You must show that the powered equipment used includes: i. powered equipment including vibrotamper, vibrating plate, vibrating roller and percussive rammer Street Works Unit 13 (April 2003) Page 7 of 11

Element 13.3 Monitor construction of sub-base and base (roadbase) materials Range to be covered (contd.) IV. You must show that safe working practices include: i. safe use of tools and equipment ii. use of appropriate personal protective equipment, including as necessary: high visibility jacket or waistcoat hard hat ear defenders eye protection visor/goggles dust mask gloves protective footwear waterproof clothing iii. use of risk assessment methods to identify and control any hazards on site iv. precautions to minimise danger or inconvenience to road users v. precautions to minimise danger or inconvenience to site personnel vi. precautions to minimise damage to equipment or apparatus V. You must show that specifications and procedures are: i. Health and Safety Executive Guidelines (HSG 185: Health and Safety in Excavations) ii. Specification for the Reinstatement of Openings in Highways iii. manufacturer s operating procedures for powered equipment Evidence requirements Your evidence must cover all the performance criteria, all the knowledge requirements and all the range items listed in this element. You must complete the following task for an actual or simulated site situation: A. Monitor the construction of sub-base and base (roadbase) using non-bituminous materials. Specification of works - The assessment must take place at a site with physical characteristics that conform to the definition of street at section 48 or road at section 107 of the New Roads and Street Works Act 1991. Assessment conditions - The assessment will be undertaken by a qualified assessor, who will observe you monitoring the construction of sub-base and base (roadbase) materials. - The site at which you are assessed must conform to the specifications listed above. Real equipment must be used, that complies with the requirements of the Code of Practice. - It is recognised that candidates for this unit are sometimes observed monitoring reinstatement activities as shown on video. Where this takes place, the video used must meet the following requirements: a) the reinstatement activities shown must conform to the specification detailed above b) the activities shown must allow candidates to carry out all the tasks specified above, and must cover the performance standards for this element in full. - If you are observed monitoring the reinstatement of sub-base and base (roadbase) as shown on a videotape, you must provide supplementary evidence of competence from the workplace. Where this includes a documented observation report, a qualified Street Works supervisor or assessor must provide this. Street Works Unit 13 (April 2003) Page 8 of 11

Element 13.3 Monitor construction of sub-base and base (roadbase) materials Evidence requirements (contd.) Additional information for candidates and assessors - The adopted specification for the works should conform to Specification for the Reinstatement of Openings in Highways. The sections of the Specification that provide particular guidance on various items within the performance criteria are listed below: i. S1.10.3 (Precautions during reinstatement) ii. S5.3.4 (Protective measures) iii. S7.1 (Reinstatement methods) in modular roads iv. S7.2 (Sub-base reinstatement) v. S7.7 and NG7.7 (Modular roads) reinstatement vi. S8.1 (Reinstatement methods) in footways, footpaths and cycle tracks vii. S10 and NG10 (Compaction requirements) viii. Appendix A9 (Alternative reinstatement materials) (ARMs) Street Works Unit 13 (April 2003) Page 9 of 11

Element 13.4 Monitor site safety Performance criteria You must show that: a) you monitor site operations in accordance with health and safety requirements b) you assess site conditions in accordance with health and safety requirements c) you ensure that checks have been carried out to ensure that appropriate safety equipment is available and is fit for purpose d) you ensure that the site is left in a clean and safe condition e) you ensure that safe working practices are followed on site throughout the reinstatement operation, that are in accordance with health and safety requirements and current relevant specifications and procedures f) you identify risks to site safety, and demonstrate that you know the appropriate remedial action to be taken Related Knowledge requirements performance criteria You need to know: 1 health and safety requirements for site operations a 2 health and safety requirements for particular site conditions b 3 the appropriate safety equipment to use during site operations, and how to ensure that it is fit for purpose c 4 the action that should be taken to leave the site in a clean and safe condition d 5 safe working practices on site and for reinstatement of sub-base and base (roadbase) in non-bituminous materials e 6 potential risks to site safety, and the appropriate remedial action to take f Range to be covered I. You must show that the following safety equipment is used on site as necessary: i. adequate range of signing, lighting and guarding equipment, including: signs cones signals lamps ii. high visibility safety equipment iii. suitable materials to construct ramps footway boards barriers portable traffic signals II. You must show that safe working practices include: i. safe use of tools and equipment ii. use of appropriate personal protective equipment, including as necessary: high visibility jacket or waistcoat dust mask hard hat gloves ear defenders protective footwear eye protection visor/goggles waterproof clothing iii. use of risk assessment methods to identify and control any hazards on site iv. precautions to minimise danger or inconvenience to road users v. precautions to minimise danger or inconvenience to site personnel vi. precautions to minimise damage to equipment or apparatus III. You must show that specifications and procedures are: i. Health and Safety Executive Guidelines (HSG 185: Health and Safety in Excavations) ii. Specification for the Reinstatement of Openings in Highways iii. Safety at Street Works and Road Works A Code of Practice Street Works Unit 13 (April 2003) Page 10 of 11

Element 13.4 Monitor site safety Evidence requirements Your evidence must cover all the performance criteria, all the knowledge requirements and all the range items listed in this element. You must provide evidence of monitoring safety on site throughout an actual or simulated site situation. Assessment conditions - The assessment will be undertaken by a qualified assessor, who will observe you monitoring site safety during the reinstatement of sub-base and base. - The site at which you are assessed must conform to the specifications listed for this unit. Real equipment must be used, that complies with the requirements of the Code of Practice. - It is recognised that candidates for this unit are sometimes observed monitoring reinstatement activities as shown on video. Where this takes place, the video used must meet the following requirements: a) the reinstatement activities shown must conform to the specification detailed above b) the activities shown must allow candidates to carry out all the tasks specified above, and must cover the performance standards for this element in full. - If you are observed monitoring the reinstatement of sub-base and base (roadbase) as shown on a videotape, you must provide supplementary evidence of competence from the workplace. Where this includes a documented observation report, a qualified Street Works supervisor or assessor must provide this. Additional information for candidates and assessors - The adopted specification for the works should correspond to Specification for the Reinstatement of Openings in Highways and Safety At Street Works and Road Works A Code of Practice under the New Roads and Street Works Act 1991. S12.2 (Safety Requirements) states that should a reinstatement fail any safety requirements of the Specification, the surface shall be restored to comply with such requirements, in accordance with section 71 (for England and Wales) or section 130 (for Scotland) of the New Roads and Street Works Act 1991. Street Works Unit 13 (April 2003) Page 11 of 11