West Seattle Junction City Council Transportation Committee Presentation Seattle, Washington April 26, 2011

Similar documents
West Seattle Junction CITY COUNCIL PRESENTATION Seattle, Washington. March 8, 2011

UDC Street Cross Sections

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

S T A T I O N A R E A P L A N

Streetscape: Core Shopping District

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

5 CIRCULATION AND STREET DESIGN

RECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.

PUBLIC REALM MASTER PLAN

Guthriesville Village Manual of Written & Graphic Design Guidelines

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Ann Arbor Downtown Street Plan

ACTION TRANSMITTAL No

City of Seattle Edward B. Murray, Mayor

To: Planning Commission Date: September 19, 2012 From: By: Subject:

1.3 Pedestrian Environments

3.1 TRAFFIC CALMING PROCESS SUMMARY

Derby Street. Project Updates. Salem, Massachusetts

Sidewalk Cafe City of St. Petersburg City Code Chapter 16, Land Development Regulations

Why invest in the 1 Street S.W. Corridor?

Comments on KXLY DRB Submittal from Southgate Neighborhood Council

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction

Construction Staging Area Vaughan Road

MARTIN LUTHER KING JR. WAY

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Broad Street Bicycle Boulevard Design Guidelines

Fulton Market Streetscape

Option W: N. Washington Street Project

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

STATE OF VERMONT ENVIRONMENTAL COURT } } } } } Decision and Order

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

TRANSPORTATION STANDARDS

Ocean Park Boulevard Green Street Project Community Workshop

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

Victoria Park Master Plan

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

5 Circulation & Parking

Chapter BICYCLE PARKING REQUIREMENTS

CURBSIDE ACTIVITY DESIGN

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

3.1 TRAFFIC CALMING PROCESS SUMMARY

Appendix B - Street Sections

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

TOWN OF PAYSON TRAFFIC CALMING MANUAL

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

5. Automobile Circulation, Wayfinding and Signage

STREETSCAPE / URBAN DESIGN ELEMENTS

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Three Springs Design Guidelines Fencing and Wall Standards

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Tonight is for you. Learn everything you can. Share all your ideas.


ADA on Construction. Guidance for Section C Plan Preparers

Accommodating Pedestrians in the Work Zone

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Polk Streetscape Project

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

PEDESTRIAN ACTION PLAN

Existing Transportation System

Feasibility Study. Expo-Downtown Bicycle Connector

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Item No. 14 Town of Atherton

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

RE: Natomas Landing (P99-091)

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Design of Stanley Park S-Curve

This chapter describes the proposed circulation system and transportation alternatives associated with

Third Street Bridge & Corridor Project

Downtown Tampa Public Parking Garage Assessment

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Environment and Public Works Committee Presentation

NEIGHBORHOOD TRAFFIC CALMING PROGRAM. Policy and Procedure. Roswell Department of Transportation (770)

C C C

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Omaha s Complete Streets Policy

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

WORKSHOP 2 SUMMARY OVERVIEW GENERAL COMMENTS. Walking and Biking. Greening & Stormwater. Transportation & Parking. Lighting, Art and Identity

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

PIONEER SQUARE ACTIVE STREETS

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Living Streets Policy

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Chapter 3: Multi-Modal Circulation and Streetscapes

Transcription:

West Seattle Junction City Council Transportation Committee Presentation Seattle, Washington April 26, 2011

Contents Project Description... 2 Site Analysis / Project Timeline... 3 Context Photos... 4 Extent Of Subterranean Vacation... 5 Public Benefit Zones... 6 Public Benefit Summary... 7 Site Plan / First Floor Plan...8 Floor Plans...9 East Mid-Block Pedestrian Walkway...10-11 West Building Elevations... 12 East Building Elevations...13 Landscape Plan... 14 Additional Public Sidewalk & Walkway Area... 15 Sidewalk Dimensions... 16 Street Furnishing Diagram... 17 Overhead Coverage Diagram... 18 Art Program... 19 Response To Petition... 20-21 Neighborhood Meeting... 22-23 Table of Contents 04.26.11 1

ELLIOTT BAY WEST SEATTLE DOWNTOWN PROJECT SITE PROJECT SITE TO FAUNTLEROY DOWNTOWN DUWAMISH WATERWAY Project Description Building height: - East Building: 84-6 plus 10-8 stair/elevator overrun and mechanical penthouses - West Building: 84-6 plus 10-8 stair/elevator overrun and mechanical penthouses Number of stories: - East Building: 7 stories - West Building: 7 stories Number of units: - East Building: 128 units - West Building: 70 units - Total: 198 units Amount of retail: East = 15,330 GSF West = 10,355 GSF Total Project = 25,685 GSF Parking and service area access: - East and West building passenger vehicle parking access via 42nd Ave - East and West building service and loading areas via alley Number of parking stalls: - Total vehicle stall Required = 209 - Total vehicle stall Provided = 271 - Total Bike Stalls required/provided = 64 Solid Waste Storage: - 125 square feet required within each building, - East Building: 426 square feet provided - West Building: 486 square feet provided Project Description 04.26.11 2

Process Timeline Project Kick-off Meeting 07.03.07 Design Review Board: EDG # 1 04.10.08 Design Review Board: EDG # 2 05.29.08 Alley Vacation Petition 06.25.08 SUMMER SOLSTICE TRANSIT/BIKE ROUTE PUGET SOUND VIEWS WINTER SOLSTICE WEST SEATTLE JUNCTION CALIFORNIA AVE SW SW ALASKA ST PROJECT SITE NEW CONSTRUCTION UNDERWAY 42ND AVE SW NEW CONSTRUCTION UNDERWAY DOWNTOWN VIEWS MT. RAINIER VIEWS Alley Vacation Supplement 07.08.08 MUP Submittal 09.09.08 Design Commission Presentation 11.20.08 Design Commission Presentation II 01.25.09 Design Commission Presentation III/ Project Approval 03.05.09 Design Review Board: Recommendation Meeting # 1 03.12.09 Design Review Board: Recommendation Meeting # 2 04.02.09 Design Review Board: Recommendation Meeting # 3/ 04.23.09 Unanimous Approval Neighborhood Meeting # 1 08.10.09 Neighborhood Meeting # 2 09.17.09 RETAIL DISTRICT Neighborhood Meeting # 3 10.29.09 Neighborhood Meeting # 4 11.06.09 Neighborhood Meeting # 5 07.01.10 Re-submit Corrected MUP Drawings 08.11.10 Revise MUP Documents per Neighborhood Group s comments 11.03.10 Neighborhood Group executes agreement w/ 2700 California Ave., LLC 11.20.10 Present Alley Vacation to City Council 03.03.11 Site analysis / Project timeline 04.26.11 3

Context Photos 04.26.11 4

2,320 sf SW ALASKA STREET 16' Extent of Subterranean Vacation CALIFORNIA AVENUE SW 145' 42ND AVENUE SW The applicant is requesting a subterranean alley vacation to allow for a continuous below grade parking garage for both buildings with a single garage entry from 42nd Avenue SW. The subterranean vacation does not provide additional development potential for the two building sites. The subterranean vacation is proposed to begin four feet below the existing alley surface to allow existing and future utilities to continue to extend below grade through the alley. Final depth will be based on coordination with SDOT. The area of the subterranean vacation is approximately 2,320 sf. WHY AN ALLEY VACATION A majority of the community and adjacent property owners believe this proposal provides the best access and the least amount of conflict in the alley. Addresses business concerns for traffic associated with larger development and visibility of available retail parking. Provides a reduction to the long term potential vehicle load on the alley and the impact of vehicle access on the adjacent principal streets. Supported by the West Seattle Junction Neighborhood Plan to enhance the Pedestrian Environment by providing mid-block pedestrian connections which embrace the alley as an active and vibrant environment to link pedestrians, parking, and surrounding streets to the commercial core. Supported by the West Seattle Junction Neighborhood Plan to reduce the impact of parking structures and enhance the pedestrian access and circulation from the parking area to retail uses by seeking alternative auto access from California Way and Alaska Street. Supported by the West Seattle Design Review Board through a Design Departure recognizing the added pedestrian open space and reduced scale of the building at the intersection of Alaska Street and California Way. Supported by the Seattle Design Commission in recognition of the public benefits package. Garage Level Plan Subterranean Alley Vacation 21 Alley surface and supporting structure depth Extent of subterranean Vacation 04.26.11 5

SW ALASKA STREET Public Benefit Zone 1 - Sidewalk & Streetscape CALIFORNIA AVENUE SW Public Benefit Zone II - Pedestrian through block connections ALLEY ALLEY 42ND AVENUE SW Public Benefit Zones 04.26.11 6

ZONE I (Sidewalk/Streetscape) Additional Public Sidewalk Area West East Total Additional Public Sidewalk Area 1,514.25 S.F. 1,886.5 S.F. 3,400.75 S.F. Total Area 3,400.75 S.F. ZONE II (Through Block Connection) Additional Public Walkway Area West East Total Additional Public Walkway Area 2,054 S.F. 3,475.75 S.F. 5,529.75 S.F. Total Area 5,529.75 S.F. Street Furnishings Public Benefit Total 4 Benches 13 Bollards 4 Bike Racks 12 Trash/Recycle Bins 10 Decorative Street Lights 7 Total Street Furnishings 46 Covered Area Public Benefit West East Total Overhead Coverage (17 clear min) 833.25 S.F. 5,87.1 S.F. 1,420.35 S.F. Canopies at Sidewalk 979 S.F. 1,952 S.F. 2,931 S.F. Total Covered Area 4,351.35 S.F. Street Furnishings Public Benefit Total 4 Benches 5 Bollards 21 Bike Racks 4 Trash/Recycle Bins 7 Tables 22 Decorative Street Lights 7 Total Street Furnishings 66 Covered Area Public Benefit West East Total Overhead Coverage (17 clear min) 72 S.F. 146.5 S.F. 218.5 S.F. Additional Canopies 383 S.F. 132.5 S.F. 515.5 S.F. Total Covered Area 734 S.F. Art Program West Building East Building Total Public Art Total 21 art pieces 8 art pieces 29 art pieces Art Program West Building East Building Total Public Art Total 6 art pieces 0 art pieces 6 art pieces Public Retail Parking Benefit Retail Parking Required Added Public Retail Parking TOTAL PUBLIC RETAIL PARKING TOTAL 11 Stalls 62 Stalls 73 Stalls Public Benefit Summary 04.26.11 7

Retail 304.09' 304.66' 303.75' 304.06' Residential VACATED ALLEY 2900 S.F. Amenity 304.50' FF B.O.H. 304.50' FF 304.50' FF Vertical Transportation Alley/Parking 304.47' 304.48' EXISTING ALLEY 306.89' 308.59' 310.11' 305.31 04.26.11 8 Site Plan / First Floor Plan (For Reference) COPYRIGHT 2011 WEBER THOMPSON 07-069

Residential Amenity B.O.H. Vertical Transportation Alley/Parking Upper Level Setback Level P-1 Upper Level Setbacks Level 3-6 Typical Upper Level Setback Level 2 Level 7 04.26.11 9 Floor Plans (For Reference) COPYRIGHT 2011 WEBER THOMPSON 07-069

Residential amenity space entry Feature landscape element centered on mid-block pedestrian walkway Alley looking at mid-block walkway Plaza space available for public use Landscape planting Pedestrian walkway paving Steel frames with special lighting to mark precinct Masonry framed entry to maintain rythym of retail bays and mark entry to mid-block pedestrian walkaway east mid-block pedestrian walkway (For Reference) 04.26.11 10

Reduced landscape planting between ramps and walkway Plaza at retail floor level Plaza at sidewalk elevation Harbor Properties plaza and landscaping Increased planter size at live/work units Harbor Properties trellis Harbor Properties ramp landings extend into landscaping east mid-block pedestrian walkway (For Reference) 04.26.11 11

West Elevation (California Ave. SW) SoutH Elevation (through Block Connection) East Elevation (alley) North Elevation (SW Alaska Street) WEST Building Elevations (For Reference) 04.26.11 12

West Elevation (Alley) South Elevation (Through Block Connection) East Elevation (42nd Ave. SW) North Elevation (SW alaska Street) East Building Elevations (For Reference) 04.26.11 13

Landscape Plan (For Reference) 04.26.11 14

(Page left intentionally blank) 04.26.11 15

ZONE I (Sidewalk/Streetscape) Additional Public Sidewalk Area West East Total Added Area at Street 1514.25 S.F. 1886.5 S.F. 3,400.75 S.F. 346.75 S.F. B SW ALASKA STREET C D 496 S.F. 517.75 S.F. Add. Public Sidewalk Sub-total 3,400.75 S.F. Existing Sidewalk 3250 S.F. 5500 S.F. 8,750 S.F. Dedicated Alley 5,200 S.F. 605 S.F. 84.75 S.F. Existing Public Right-of-way sub-total 13,950 S.F. OVERALL TOTAL 17,350.75 S.F. 20% Increase in Public Area over existing condition ZONE II (Through-block Connection) Additional Public Walkway West East Total Additional Public Walkway 2054 S.F. 3475.75 S.F. 5,529.75 S.F. ADDED BENEFIT SUB-TOTAL 5,529.75 S.F. Existing Public Walkway 0 S.F. 0 S.F. 0 S.F. Dedicated Alley 0 S.F. 0 S.F. 0 S.F. ENTRY AREA SUB-TOTAL 0 S.F. OVERALL TOTAL 5,529.75 S.F. 100% Increase in Public Area over existing condition 245.75 S.F. 200 S.F. CALIFORNIA AVENUE SW 1,889 S.F. A 17-2 30 S.F. 104-4 165 S.F. ALLEY ALLEY 400 S.F. 1250.25 S.F. E 42ND AVENUE SW 358.25 S.F. 349.5 S.F. F 120 S.F. 15-6 1,825 S.F. 113-0 West mid-block pedestrian walkway Mid-block pedestrian walkway at 42nd Avenue Additional Public Sidewalk & Walkway Area 04.26.11 16

A. California Ave. SW B. SW ALASKA STREET C. SW Alaska St. (Typical Condition) D. SW Alaska Street E. 42nd avenue sw F. 42nd avenue sw (Typical Condition) Sidewalk Dimensions 04.26.11 17

SW ALASKA STREET CALIFORNIA AVENUE SW ALLEY 42ND AVENUE SW ZONE I (Sidewalk/Streetscape) ZONE II (Through-block Connection) Quantity CALCULATION TOTAL Quantity CALCULATION 4' Benches Bollards (Illuminated) Bike Racks Trash/Recycle Bins Decorative Street Lights TOTAL FURNISHINGS 13 4 12 10 7 46 4' Benches Bollards (Illuminated) Bike Racks Trash/Recycle Bins Tables Decorative Street Lights TOTAL FURNISHINGS Note: None of the above street furnishings are code required TOTAL 5 21 4 7 22 7 66 street furnishing diagram 04.26.11 18

443 S.F. SW ALASKA STREET 769 S.F. 153 S.F. CALIFORNIA AVENUE SW 171 S.F. ALLEY 485 S.F. 42ND AVENUE SW 212 S.F. ZONE I (Sidewalk/Streetscape) Covered Area Public Benefit West East Total Overhead Coverage (17 clear min) 833.25 S.F. 587.1 S.F. 1,420.35 S.F. Canopies at Sidewalk 979 S.F. 1,952 S.F. 2,931 S.F. Total Covered Area 4,351.35 S.F. ZONE II (Through-block Connection) Covered Area Public Benefit West East Total Overhead Coverage (17 clear min) 72 S.F. 146.5 S.F. 218.5 S.F. Additional Canopies (10 clear min) 383 S.F. 132.5 S.F. 515.5 S.F. Total Covered Area 734 S.F. 377 S.F. 321 S.F. overhead coverage DIAGRAM 04.26.11 19

SW ALASKA STREET 15 15 16 17 18 19 20 21 8 7 6 5 4 3 ZONE I (Sidewalk/Streetscape) EAST BUILDING 1 Sculpture 3 Sculpture 14 13 2 1 4 Sculpture 5 Sculpture 6 Sculpture 7 Sculpture 8 Sculpture TOTAL (8 Pieces) WEST BUILDING CALIFORNIA AVENUE SW 12 11 10 9 8 WEST EAST 42ND AVENUE SW 7 Glass Art 7 8 Glass Art 9 Glass Art 10 Glass Art 11 Glass Art 12 Sculpture 13 Sculpture 14 Sculpture Sculpture As the design process proceeds, 4700 California Ave., LLC will collaborate with the West Seattle Neighborhood Group to Develop And Public Art Program for the Building. The current design has incorporated 10 locations for small glass art installations and eighteen locations for larger sculptural panel installations (three to four square feet each). It is envisioned that the sculptural panels, designed by local artists, will in some way portray historic elements of the West Seattle neighborhood. 6 5 4 3 2 1 15 Sculpture 16 Sculpture 17 Sculpture 18 Sculpture 19 Sculpture 20 Sculpture 21 Sculpture TOTAL (21 Pieces) ZONE II (Through-block Connection) WEST BUILDING 1 Glass Art 3 Glass Art 4 Glass Art 5 Glass Art 6 Glass Art TOTAL (6 Pieces) Glass Art west seattle junction Art Program 04.26.11 20

In September of 2008 DPD/SDOT received a petition from a consortium of neighborhood groups and local merchants expressing concern that the alley between 42nd Avenue SW and California would be closed for the duration of construction. The petition was as follows: The above petition had several hundred signatures attached. In response to the Merchant s concerns, 4700 California Ave., LLC developed a strategy to keep the alley open during construction by providing a detour to 42nd Street during the below grade portion of the construction (See page 22). 4700 California Ave., LLC met with each of the Merchants who s store border the alley. Unanimously, every Merchant confirmed that the attached plan fully resolved the concerns voiced in the petition and withdrew their objections. Response to Petition 04.26.11 21

SW ALASKA STREET SW ALASKA STREET EXCAVATION Both sites including the alley vacation will be excavated and constructed up to the existing alley grade to the extent indicated. Alley to re-open to alley traffic on top of constructed structure. Fence at top of slope cut site. Slope cut site this area. Existing curb cut to be used for temporary alley access to 42nd Avenue SW. EXCAVATION Alley to re-open to alley traffic on top of constructed structure. CALIFORNIA AVENUE SW ACCESS 42ND AVENUE SW Existing 4700 California Ave., LLC property parking lot paving to be used for temporary alley access to 42nd Avenue SW. CALIFORNIA AVENUE SW ACCESS 42ND AVENUE SW SW EDMUNDS STREET SW EDMUNDS STREET Response to Petition 04.26.11 22

After the project was reviewed and unanimously approved by the Southwest Design Review Board, representatives from the West Seattle neighborhood contacted the City of Seattle and 4700 California Ave., LLC to request that 4700 California Ave., LLC enter into a facilitated, collaborative process to resolve a series of issues they felt had not been address during the Design Review process. 4700 California Ave., LLC agreed to the request and participated in a series of meetings with the group covering a wide variety of issues. The process was facilitated by Gary Johnson, DPD. The following are the members of the neighborhood group: Susan Melrose Erica Karlovits Rene Commons Abdy Farid Heather Leaman Michael Godfried Rhonda Laumann West Seattle Junction Association Resident Resident Resident West Seattle Board of Directors Resident Resident After meeting with the group on five occasions and providing solutions to the groups concerns, the group agreed that significant progress had been made and executed the following agreement. All changes were approved the project s planner, Michael Dorcy and the Master Use Permit Documents were revised and re-submitted. Neighborhood Meeting 04.26.11 23

Letter of Agreement Re: DPD projects #3007764 and #3007765 Charles Conner and 4700 California Ave LLC ( Applicant ) is proposing to construct two buildings on the south side of SW Alaska Street between California Avenue SW and 42nd Avenue SW. The west building is filed under DPD project #3007764. The east building is filed under project #3007765. The buildings will lie on either side of an alley. The proposal includes a request for a partial subterranean vacation of the alley to allow subsurface parking garages in each building to connect, resulting in a single access point for both garages on 42nd SW. This project required a request for a partial subterranean alley vacation request, which necessitated a review of the project by the Design Commission. The project was subject to the City s Design Review process and was reviewed by the Southwest Design Review Board. The DRB approved the project subject to the proponent addressing six outstanding issues to the satisfaction of DPD s land use planner for the project, Michael Dorcy. Several community members disputed the thoroughness and fairness of the DRB consideration of this significant project. As a way to explore potential changes to the project proposal that would address community concerns, both parties agreed to enter into a facilitated discussion process with representatives of some members, but not all, in the West Seattle Junction area. There are additional community members who had similar concerns, who were not included in this process, at the request of the facilitator. The City of Seattle Mayor s office selected Gary Johnson from the City of Seattle Department of Planning and Development to serve as the facilitator. 4700 California Ave LLC was represented by venture partners Charlie Conner, President Conner Homes and Gary Young, Sr. Vice President, Polygon Northwest. Community members who attended the meetings and had input in the process were the following: Susan Melrose- West Seattle Junction Association; Heather Leaman - West Seattle Junction Association Board of Directors; Michael Godfried, Erica Karlovits, Rene Commons, Abdy Farid, and Rhonda Laumann- area residents. Project architect,jim Westcott from Weber Thompson participated throughout the process. 9. Applicant will contribute $5,000 towards development of Junction Plaza Park upon construction permit issuance. In signing this agreement, Applicant agrees to implement each element contained in the completed MUP and referenced drawings. Applicant also agrees that, if all or part of the project is sold, the commitments agreed to herein shall become conditions of sale and the requirements transferto the new owner. The agreements must transfer as conditions of sale to any and all future owners. The only community members bound by this agreement are those members whose names and signatures appear below. The below listed signatories agree that they will not appeal the DPD Director s Decision, so long as all conditions and this agreement are incorporated as requirements in the Director s Decision, as expressed in the Master Use Permit (MUP) decision. The signatories below will not oppose the project s partial subterranean alley vacation petition, contingent upon implementation of the construction plan, which leaves the alley operational throughout every phase of construction, when the alley vacation is considered by the City Council. This agreement will become part of the DPD MUP decision and incorporated into the MUP submission as a permanent document on record for projects no. 3007764 and 3007765, and subject to approval by the Seattle City Council, the Alley Vacation Conditions. If any changes are made to the MUP, such changes may invalidate this agreement. The community members listed below shall be advised of any changes to the MUP made by any party. Email notification is sufficient notification. The current MUP application reflects the changes agreed to by the parties. In addition the Applicant commits to the following: 1. To re-engage the community and solicit neighborhood participation in the design of cornices, sills, canopies, soldier courses, art, lighting and other details at the construction document phase. 2. Include an art panel program with historical representations in the north ground plane facade of both buildings. 3. Incorporate dark bronzed window framing at retail level. 4. Endeavor to reduce the planting strip on California 5 to 4 increasing sidewalk width to 8 6, subject to SDOT approval. 5. Install special pavement detail providing texture and way finding elements throughout the midblock passage. 6. Carry brick elements from West building to the north fagade offhe Eastbuilding. Preferably a light gray color rather than the red brick color of the West building. 7. Work with Harbor Properties to explore opportunities to integrate east building plaza with the mural project plaza including signage, pavers and other design elements. Install a way finding sign at plaza entrance that denotes the connection to California Avenue. Complete Plaza design details as part of construction documents. 8. The set of streetscape amenities including benches and pedestrian lighting proposed for the West building will be carried to the East Building. Landscaping on SW Alaska Street will be designed to integrate with the Junction Plaza Park across the street. Neighborhood Meeting 04.26.11 24