Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Similar documents
Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Chapter 8 (2009) - Summary of key changes

Single Vehicle Operation on 2- Lane Single Carriageways. Safety at Street Works and Road Works Code of Practice & Chapter 8 Implementation Document

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Monitoring excavation in the highway

Operation Guidance Temporary Traffic Management. Part. Level 3 Roads Dual Carriageways and Motorways. Draft June

Geotechnics, Face and Stockpile Operations

Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials

TRAFFIC ACCOMMODATION IN WORK AREAS

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

Safety at Street Works and Road Works

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Extending 200m either side of the intersection Te Mata Mangateretere/ Waimarama/ Te Mata/River Rd

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

SECTION TRAFFIC REGULATIONS

Appendix 12 Parking on footways and verges

GUIDELINE: Roadside Worksites

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Temporary Vehicle Restraint System Policy

Interim Advice Note 115/08, Revision 1. Requirements and Guidance for Works on the Hard Shoulder and Road Side Verges on High Speed Dual Carriageways

ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS

Health & Safety Guidance

Staff Contractors. Public. Staff Contractors

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Appendix Work Zone Traffic Control

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Traffic Control & Road Closures for Special Events

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

TRAFFIC MANAGEMENT PLAN (TMP) SHORT FORM. RCA: Invercargill District Council. Teviot Street, Appleby, Invercargill Outside #11 L1 50 -

Safe Working On Roads Standard Operating Procedures

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.

Our commitment to safety

CHAPTER 6H. TYPICAL APPLICATIONS

FIRE HYDRANT TESTING METHOD STATEMENT.

Traffic Control Inspection Checklist Segment:

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

GUIDANCE FOR TEMPORARY TRAFFIC MANAGEMENT AT SURFACE DRESSING SITES

Safe work method statements

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

Minimum Safety Requirements for Contractors Working on Railway Property

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

MUTCD Part 6: Temporary Traffic Control

ANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

Proposed: Temporary Traffic Management Design Guidance

Process for managing parking on verges, footways and footpaths

Traffic Calming Regulations

Local Highway Panels Members Guide. 5 Crossing Facilities

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation

PALMERSTON NORTH CITY PALMERSTON NORTH SIGNS AND USE OF PUBLIC PLACES BYLAW Administration Manual

CYCLING TIME TRIALS The national governing body for CYCLING time trials

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Community Highways Volunteering. Information Pack 2017/18

WORKSITE TRAFFIC MANAGEMENT

You can download the latest version of this Traffic Signs Manual chapter and all other Traffic Signs Manual chapters from:

WORK ZONE TRAFFIC CONTROL PROCEDURES

MINNESOTA FLAGGING HANDBOOK

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

CHAPTER 6H. TYPICAL APPLICATIONS

4.1 INTRODUCTION 4.1 ROAD SAFETY

Work Zone Safety. Developed by HMTRI through cooperative agreement # 2 U45 ES with NIEHS

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

2.0 Management Systems and Documentation

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

CONSTRUCTION SPECIFICATION

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

Buchanan. Approved: John Downes

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

Health & Safety Contractor rules

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

Underground Mine Signs Guideline Underground Fires Major Hazard Standard

EVENTS DIAGRAMS LIST

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

PRO Lifting Operations

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

WORK ZONE TRAFFIC CONTROL & SAFETY

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

A MESSAGE FROM THE MD

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

Bitumen Delivery Driver Inductions Eurobitume UK

Transcription:

Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce. All activities must be properly planned and subject to a risk assessment, undertaken by trained and competent personnel. The work location must be continually monitored for changing conditions that may affect the ongoing safety of the activity All personnel must have their NRSWA qualification cards available on site. Introduction Every year, Thames Water and its contractors carry out thousands of minor short duration works activities in the public highway. These activities involve a single or a small number of vehicles, making one or more intermittent stops, or where there is a requirement for a person(s) to undertake a task on the footway or carriageway that doesn t involve an excavation. Typical activities include sewer entry, valve operations, meter reading, sewer blockages, survey work (CCTV), leakage sounding, leakage correlation, hydrant flushing, chlorination, tankering and sampling. It is during these times that the employee(s) involved in the task can be at their most vulnerable; these standards are provided for your guidance to assess the work to ensure you and other road users are safe. Where operatives are working wholly on the footway or verge some very short duration works may be undertaken without the use of static signs and cones, provided that a site specific risk assessment demonstrates minimal obstruction to traffic flows and a low risk to operatives and road users. The works vehicle must be parked legally and where traffic can pass safely, without any difficulty and not obstructing pedestrians walking by, where possible maintaining a width of 1m however local permitting arrangements may specify an alternative width (mainly 1.2m) as a minimum. The working area MUST not be left unattended at ANY TIME to allow for the barriers to be removed if required. If at any time the employee believes that even after applying these standards their own or others safety is still in question, the work should be suspended and the task MUST be assessed by a competent individual, trained to a minimum NRSWA Unit 10 and arrangements for further additional controls around signing, lighting and guarding will be implemented if required. Training All operatives undertaking short duration street works on behalf of Thames Water MUST be trained and competent. The minimum qualification requirement for an operative will be NRSWA Unit 2. Any individual supervising work in the highway must be trained to a minimum of NRSWA Unit 10. NB NRSWA qualification cards MUST be available onsite at all times. Responsibility for establishing a safe working area There must always be a lead person responsible for the work site. The lead person on site is responsible to ensure that the works are carried out in accordance with the work plan and risk assessment, team members are briefed and the worksite is set up correctly prior to any activities commencing. October 2015 Page 1 of 7 Version 3

Short duration static works Short duration static work will involve a single vehicle or a small number of vehicles undertaking: One or more intermittent stops of up to 15 minutes for activities such as sewer tankering (pumping from or discharging to sewers), sewer jetting, valve operations, meter reading etc.; or One or more intermittent stops of between 15 and 60 minutes for activities such as leak detection, making safe / minor repairs to manhole and valve covers, sewer entry, etc. These time periods must include all time needed to set up and dismantle any signing, cones and guarding which have been used. Planning and risk assessment A risk assessment must be carried out for all works before any task begins. The risk assessment MUST take account of road layout and speed of traffic, the works to be undertaken, location, duration and restoration of the work site to the original state. Work activities may only be managed as short duration static work if the risk assessment demonstrates it is safe to do so as a lone worker and if the following conditions exist: The activity including erecting and dismantling traffic management will take less than 60 minutes. The road has a maximum speed limit of up to 40mph, It is a single carriageway road. There is clear and good visibility on each approach for oncoming traffic of the work site, taking into consideration large obstructions such as buildings, bends or narrowing in the road, brows of a hill and weather conditions. The work does not impede the public footway requiring pedestrians to seek an alternative route. If the work cannot be completed as a Short Duration task fitting the above criteria; DO NOT continue until you have assessed what other controls would be required to allow the task to be completed safely. This MUST involve at least a second person to support the work activity on site and you may require further guidance by a Unit 10 trained person to discuss the site conditions for further assessments to be made. Any activity completed not as a Short Duration task must still comply with the Safety at Street Works and Road Works Code of Practice. Traffic Control An adequate unobstructed road width is required to allow two-way traffic to flow safely past the work site. Standard: Normal traffic Restricted: Cars and Light including buses and HGVs vehicles Two-way working 6.75 m minimum 5.5 m minimum Where the above cannot be provided the road width can be restricted to 3.25m and a single file traffic supplement plate must be used on the road narrow sign. The standard widths are designed to maintain access for buses and heavy goods vehicles and must be provided wherever practicable. Where the work may restrict lane widths that will prevent the passage of larger vehicles, a suitable diversion route must be agreed with the highway authority and bus operator. In these circumstances you must stop work and consult a trained unit 10 competent person who will discuss what form of Temporary Traffic Control may be required with the relevant highway authority for the work to be carried out safely. October 2015 Page 2 of 7 Version 3

Basic requirements for vehicles The following are the basic requirements when undertaking short duration static works: The vehicle must be noticeably coloured i.e. chevrons and branding in line with statutory and TW requirements. The vehicle must have one or more roof mounted beacons operating at all times The following must then be in place before the works can start: Site set up requirements Single stop, short duration works Stop less than 15 mins duration Place Road Works Ahead signs for drivers approaching in each direction; ensure there is clear visibility of 60meters when approaching the sign (see appendix 1). If there is limited visibility on the approach to the proposed work site due to a bend in the road or brow of a hill you must provide extra advance signs; these signs must be placed first. The signs must be placed at the appropriate distance in advance of the works. (See Code of Practice NRSWA and appendix 1 part D). Display the correct side Road Narrows sign for drivers approaching in each direction. A keep left / right sign must be displayed next to the vehicle for drivers approaching on the same side of the carriageway, showing which side to pass. Stop 15 to 60 mins duration Display advance signs as above, and Display Keep left / right arrow at the start of the lead-in taper Place cones to form 45 o lead-in and exit tapers, and Cone off the working space making sure you create a sideways safety zone of 0.5m at the side where traffic is passing Place a barrier around the area where the work is taking place NB Remember to allow two-way traffic, if this is not achievable see above section Traffic control for road widths. Stop more than 60 mins WARNING: This is not short duration work and additional controls will be required in accordance with NRSWA i.e. standard signing, cones and guarding for a fixed site must be provided with the potential requirement for traffic lights to be put in place for the safety of other road users and operatives. This will need to be assessed with a Unit 10 trained and competent person. IF ANY OF THESE BASIC REQUIREMENTS CANNOT BE MET, YOU MUST NOT UNDERTAKE THE WORKS. October 2015 Page 3 of 7 Version 3

See below for minimum equipment requirements and the above table Site set up requirements For dimensions D see Appendix 1 For dimensions D and L see Appendix 1 Note 2 See above section Traffic control for further details October 2015 Page 4 of 7 Version 3

Minimum equipment requirements This list below details the minimum amount of equipment that must be carried and used as appropriate to undertake short duration work safely: 12 traffic cones (450mm) for tapers, more may be required dependant on the working area size 3 road works ahead signs (750mm) with removable supplement arrows if required 2 road narrows (750mm) with removable single file traffic plates 3 directional keep left / keep right arrows (750mm) Folding pedestrian barriers If additional signage is required after an assessment is completed using the Safety at Street Works and Road Works Code of Practice, the equipment must be requested and brought to site before the work can commence. PPE must be donned prior to leaving the vehicle in accordance Thames Water s PPE requirements The minimum requirements will include: Hard hat High visibility jacket (Class 3, two bar, long sleeves) Steel capped safety boots Gloves appropriate for the task Eye protection All equipment must be maintained and in good condition. Using a vehicle to protect the workforce Wherever possible short duration works must involve the use of a vehicle(s). If a vehicle cannot be used due to the location (e.g. impedes a bus route / stop etc.), then consideration of further control measures around signing, cones and guarding must be assessed and applied. When using a vehicle or vehicles, it is required that: The work vehicle(s) are parked in a safe position with roof mounted amber beacons turned on and hazard lights flashing. The beacons must remain on at all times. The vehicle should be parked between the oncoming traffic and the work area; ensuring a clear distance between vehicle and working area of: o o 2m on roads with a speed limit of 30mph roads 5m on roads where the speed limit is 40mph. The work vehicle must be noticeable and have high visibility chevron markings. Materials and equipment can be obtained using the rear doors of the vehicle (unless the side doors open onto the footpath). The rear doors are kept closed when not in use, to maximise visibility of chevrons on the back of the vehicle. October 2015 Page 5 of 7 Version 3

Monitoring The site must be continually monitored by the lead person/ operator and team for changing conditions throughout the duration of the work. Significant changes will require the work to be suspended and the risk assessment reviewed prior to continuing. If additional safety controls are required, work must not recommence until they are installed. Regular inspections of street works activities must be undertaken by a Unit 10 trained manager or supervisor on a regular basis and recorded. NB. This Essential Standard has been developed for Short Duration tasks only; if after planning and assessing the task it cannot be done safely contact your supervisor for assistance. The task must ONLY commence once additional controls are in place using the Safety at Street Works and Road Works Code of Practice for guidance and the task is completed as a minimum 2 person team. October 2015 Page 6 of 7 Version 3

Appendix 1 October 2015 Page 7 of 7 Version 3