WHS record keeping - general (Local areas responsible for keeping these records)

Similar documents
Competency type. positions. All workers (including contractors), higher degree students and volunteers

WHS record keeping requirements

Work Health Safety Record Management Guidelines. October, 2014

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health & Safety Policy & Plan. Rightway Roofing.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

CONTRACTOR SAFETY INDUCTION HANDBOOK

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Work Health and Safety Risk Management Procedures

Procedure: Pressure equipment safety

Safety Management Manual

Accident/Incident Reporting and Investigation Procedures

FACULTY OF EDUCATION LOW RISK HEALTH AND SAFETY FORM FORM B

Policy Redesign Project. Plant Safety Policy. Table of Contents

INDUCTION GUIDE. USC Low-risk Contractor

Reviewed: DD Month Management of Closed Radioactive Sources

GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE. St Euphemia College - General Work Health and Safety Checklist

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Procedure: Work health and safety hazard management

How volunteer organisations can comply with the model Work Health and Safety Act LEGISLATIVE FACT SHEET SERIES

Hazard & Risk Management

SCOUTS AUSTRALIA NSW

Hazard Management Making your workplace safer

Compensation claims: Why do companies lose claims? Nicola Lashmar Principal Associate Barrister Eversheds LLP 4 July 2012

Newtown Neighbourhood Centre

Asbestos Management Plan

HAZARDOUS SUBSTANCE AND DANGEROUS GOODS

Safety Procedures on Vacating Premises

Contractor / Exhibitor Handbook

in Australian Workplaces

University of Cambridge - Safety Office. Radioactive Substances (Unsealed Sources) Audit - complete checklist

Corporate Standard Hazardous Substance Management HB#625157

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Work Activity (e.g. Road Work): Work Location:.

VUW Health and Safety, Emergency Management and Business Continuity Planning Staff Training Programme 2017

Health and Safety Inspection Procedure

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Hampstead Hill School Health and Safety Policy: Confined Spaces

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

TENDERER OCCUPATIONAL HEALTH AND SAFETY (OHS) MANAGEMENT SYSTEM QUESTIONNAIRE

Removal of Lead-Based Paint

LEGIONELLA POLICY OUR LADY & ST JOSEPH CATHOLIC PRIMARY SCHOOL

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

MANAGING INDUSTRIAL SITE RADIOGRAPHY WORK

ontario regulation 629/05 made under the occupational health and safety act

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

Safe Work Method Statement Required for all High Risk Activities identified for the Project

Vermin, Insects and Scavenging Birds Management Plan

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

PLANT/EQUIPMENT/ASSET HAZARD REPORT


4.1 The Vice-Chancellor and University Executive Committee

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

Safety Management Plan Version Sept 06 A

Hazardous substance risk management

SAFE WORK METHOD STATEMENT CARPENTER

Project & Task Work Health and Safety Risk Management Procedure

SOP. Working in Confined Spaces

Isolation Standard - Tags

ONTARIO REGULATION 632/05 CONFINED SPACES

Compliance with Health & Safety legislation

LADDERS FIXED AND PORTABLE

a. identify hazardous conditions and potential accidents; b. provide information with which effective control measures can be established;

To comply with the OHS Act, the responsible manager must carry out and document the following:

Contractor OHS Induction. AOHS-05-GUI September 2016

CSTMC Asbestos Management Policy and Procedures

Management of risk. Definition of terms. Managing risks. Risk

The Sample Company Pty Ltd

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

PLANT/EQUIPMENT/ASSET HAZARD REPORT

IIUM EVENT SAFETY RISK ASSESSMENT

Unit Title: Health and Safety in a Construction Environment

Iron Ore Company of Canada Health, Safety & Environment

Contractor handbook. Purpose

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Occupational Health and Safety Act

Our commitment to safety

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

CONTROL OF LEGIONELLA POLICY

Hazardous Energy Control (Lockout-Tagout)

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

Personal Protective Equipment

10-Hour OSHA Training

Health & Safety Plan `

HAZARDOUS SUBSTANCES / DANGEROUS GOODS

SH&E Training Matrix (EMIA)

Builders Guide to MANAGING SAFETY on Work Sites

Site-Specific Safety Plan

COSHH Assessment Form

4 Staff Selection, Appraisal and Development. To prevent harm by identifying and controlling potential hazards.

A MESSAGE FROM THE MD

THE LOVIISA NUCLEAR POWER PLANT DECOMMISSIONING PLAN UPDATE Matti Kaisanlahti NKS-R Decommissioning Seminar, Halden, Norway, November 2013

Transcription:

WHS record keeping - general (Local areas responsible for keeping these records) Records Examples Retention period Records relating to risk assessment and management of hazards (except particular requirements listed below for specific issues) Hazard identification and risk assessments Records of control measures Safety data sheets Regular hazard surveys Workplace inspections Event Safety checklists Working from home checklists WHS Committees and Consultation Faculty/College/Portfolio Health and Safety Committee agendas, minutes, reports Records of WHS consultation/communication with workers and other PCBUs 1 /shared duty holders 10 years Contractor Safety Management Contractor local area WHS Induction Records including information about hazards/risks Electrical equipment and electrical installations Electrical testing records for individual items (including testing of RCDs) 7 years after last test or after permanent removal/disposal Emergency management Records relating to appointment of first aid officers, wardens 7 years Field trip health and safety Field trip health and safety checklist and subsequent risk assessment Field trip health and safety acknowledgement First aid Record of minor first aid treatment given 10 years Hazardous chemicals carcinogens; controlled substances (poisons) under Reg 25 2 ; substances classified as Extreme Risk in ChemWatch) Hazardous chemicals (including dangerous substances) register Register of Schedule 8 permits Hazardous chemicals training records Hazardous chemicals risk assessments Hazardous chemicals safe work method statements/safe work procedures (SWMSs/SWPs) Waste transport certificate (WTC) (or equivalent) Safety Data Sheets (SDSs) Kept in ChemWatch 1 Persons Conducting a Business or Undertaking 2 SA Controlled Substances [Poisons] Regulations 2011 page 1 of 6

Records Examples Retention period Ionising Radiation Risk assessments, control measures, safe work method statements/safe work procedures (SWMS/SWPs), monitoring of work environments, health monitoring Contingency plans Plant/equipment Record of Plant (including lasers) that requires registration, including records of all tests, inspections, maintenance, commissioning, decommissioning, dismantling and alterations Plant Register 10 years after disposal 10 years from last entry Plant safety integrity test records (for plant with presence-sensing safeguarding system) Inspection and testing records of biosafety cabinets and other containment equipment 10 years after disposal 10 years Risk assessments/ Safe Work Method Statements/ Safe Work Procedures Risk assessments/safe work method statements/safe work procedures (RAs/SWMS/SWPs) for hazardous chemicals as defined above, radiation Other RAs/SWMS/SWPs Training Staff training and induction records (except as below) Hazardous chemicals training records Planning Faculty/College/Portfolio planned actions 5 years after action completed Contractor safety Contractor WHS Induction Records (for contractors engaged by local areas) page 2 of 6

Specialised WHS records (Area, as shown, responsible for record keeping) Asbestos Asbestos Register Asbestos Management Plan Health monitoring reports for a worker carrying out asbestos work Asbestos training records Records relating to fitout/maintenance/repair of properties/equipment/plant on asbestos register Records relating to management of contracts relating to asbestos or other hazardous materials removal and/or remediation) after date of birth 30 years or 5 years after worker ceases working for the University (whichever is longer) Audits Official audit reports on compliance of University programmes with WHS legislation, standards (including ReturntoWorkSA evaluations) Supplementary records relating to WHS audits (eg arrangements for inspection of workplaces and records) 7 years Confined spaces Training records in relation to confined spaces Confined space risk assessment Confined Space Entry Permit Other high risk work (eg working at heights, hot work, forklift operation, pressure equipment operation) University Health and Safety Committee University Health & Safety Committee minutes, agendas, reports Health & Safety Representatives Nomination, election and resignation of Health and Safety Representatives 7 years First aid First aid training records (summary spreadsheets) 45 years page 3 of 6

Contractor safety Contractor WHS Induction Records (for contractors engaged by B&P) Contractor WHS evaluation checklists Contractor site observation checklists Work Permits (eg Hot Work, Confined Spaces, Working at Heights, Isolation of Services) High Risk Construction Work Safe Work Method Statements for High Risk Construction Work Where the University is the principal contractor Written evidence that worker has relevant high risk work licence Records of information provided to contractor(s) about WHS hazards/risks WHS Management Plan for construction project Records of WHS consultation/communication with contractor Electrical work Risk assessment and Safe Work Method Statement for electrical work on energised electrical equipment Emergency management Emergency Plan (including emergency procedures) Diving Diver registration Diver induction Dive Coordinator induction Certificate of medical fitness Evidence of competence Diving certification Log book Risk assessment relating to diving work Dive plan Dive Safety Log On-site dive risk assessment(s) Dive briefing checklist Pre-dive equipment checklist Boating Boating Safety Plan Coxswain Register (pre-april 2016 local areas) page 4 of 6

Boating (con t) Coxswain Safety Inductions (pre-april 2016 local areas) Incidents/accidents Online incident/accident reports, incident investigation (FlinSafe) FlinSafe 45 years Reports of notifiable incidents to SafeWorkSA and/or other regulator (eg Office of the Technical Regulator, Environmental Protection Authority) Injury Management Injury report FlinSafe 35 years Workers Compensation claim files 35 years Recovery and return to work case files Register of compensation claims Workers compensation insurance policies after employee s date of birth 30 years after term of policy expires Ergonomics Workstation assessments Planning WHS Operational Plan 5 years after action complete Hazardous chemicals carcinogens; controlled substances (poisons) under Reg 25 3 ; substances classified as Extreme Risk in ChemWatch) Prohibited and restricted carcinogens permits Scheduled drugs and poisons (controlled substances) permits (except Sched 8 kept by local area) Record of each worker likely to be exposed to the prohibited or restricted carcinogen Health monitoring records Ionising Radiation Radiation worker registration Register of licenced premises, sources and apparatus Register of unsealed and sealed radioactive substances Ionising Radiation Management Plan Purchases and disposals of unsealed radioactive materials Movements and locations of sealed sources Disposal of radioactive waste Register of radiation incidents 3 SA Controlled Substances [Poisons] Regulations 2011 page 5 of 6

Ionising Radiation (con t) Personal radiation exposure records for each worker Radiation worker medical examination report Plant Inspection and testing records of fume hoods 10 years Planning WHS Operational Plan 5 years after action completed page 6 of 6