WILD WELL CONTROL WARNING SIGNS OF KICKS

Similar documents
Study Guide IADC WellSharp Driller and Supervisor

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

Hydro-Mech Bridge Plug

Float Equipment TYPE 925/926

W I L D W E L L C O N T R O L FLUIDS

1. The well has been shut in on a kick and the kill operation has not started.

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Casing Design. Casing Design. By Dr. Khaled El-shreef

Rig Math. Page 1.

August 21, Deepwater MPD / PMCD

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

Worked Questions and Answers

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

VOLUMETRIC METHODS and STRIPPING OPERATIONS

IWCF Equipment Sample Questions (Surface Stack)

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Institute (WCI) Core Curriculum and Related Learning Outcomes: Supervisory Level

Understanding pressure and pressure

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Hard or Soft Shut-in : Which is the Best Approach?

W I L D W E L L C O N T R O L COMPLICATIONS

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

OCEAN DRILLING PROGRAM

SUBSEA KILL SHEET EXERCISE No. 5

Well Control for Supervisors for Drilling Operations Core Curriculum and Related Learning Objectives

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Drilling Efficiency Utilizing Coriolis Flow Technology

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

Petr 311 Wellbore pressures and Kick Control

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives

Extended leak off testing

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

Practice Exam IADC WellSharp Driller and Supervisor

OPTIMUM SELECTION OF WELL CONTROL METHODS

DRILLSCENE PROACTIVE DRILLING DECISIONS

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Horizontal Marmaton Wells in Beaver County, OK

Chapter 4 Key Findings. 4 Key Findings

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

AADE 01-NC-HO-08. Copyright 2001 AADE National Drilling Technical Conference

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

Why Do Not Disturb Is a Safety Message for Well Integrity

Chapter 5 HORIZONTAL DRILLING

Air and Gas Drilling

W I L D W E L L C O N T R O L AIR DRILLING

APPENDIX A1 - Drilling and completion work programme

Operations planning for optimal hole cleaning

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

UPM A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

Book 3 - Well Control Calculations

SPE MS Well Collision Avoidance Management and Principles

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

Texas Administrative Code

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

The Diagnosis of Well Control Complications during Managed Pressure Drilling

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS

Chapter 5 Drilling and Well Testing Practices

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

RIH intermediate section casing in Bazian-1 exploration oil well

Tibor Szabó DRILLING THROUGH SHALLOW GAS ZONES IN HUNGARY

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment

EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

LECTURE 20 FLOW CONTROL VAVLES SELF EVALUATION QUESTIONS AND ANSWERS

DB Bridge Plug. Features. Benefits. Applications

Abstract Objective Scope of Study Introduction Procedures

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Debris Management Drilling Tools

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise

Deepwater Horizon Incident Internal Investigation

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

What are the Well Control Complications While Drilling with Casing or Liner? Tawfik Elshehabi and H. Ilkin Bilgesu, West Virginia University

Casing and Cementing Requirements

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

BaraShield -664 LCM Standard Field Application Procedure

Model A Sleeve Valve Cement Retainer

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy

Transcription:

WARNING SIGNS OF KICKS

Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn flow check procedures, and that a positive flow show is a definitive sign of a kick.

Warning Signs of Kicks Overview Changes from established trends usually indicate downhole problems. Commonly monitored parameters are: Flow Indicator: Flow rate at given pump speed Flow with pump shut down Pumps: Pump pressure changes Pump Speed

Warning Signs of Kicks Rotary: Pits: - Rate of Penetration whether a formation or milling - Torque/drag - String weight - Fill - Changes in Pit Level during any activity - Hole fill during trip in - Displacement during trip out Changes in any of the above can indicate pressure changes in the well and potentially that the well may be kicking.

Warning Signs of Kicks

Warning Signs of Kicks Monitored parameters can indicate downhole pressure changes include: Mud/Fluid: - Density changes/weight - Viscosity and flocculation - Salinity Flowline/Shakers: - Change in background gas - Change in shape and size of cuttings - Temperature

Warning Signs of Kicks Mud Logging: - Formation type - Drilling exponent - Shale Density - Type of gas in returns MWD/LWD tools: - Shale resistivity - Acoustic travel time - Conductivity - Radioactivity We must learn to react quickly and properly if one or more of these signs are noticed!

Warning Signs of Kicks PWD

Penetration Rate Change Penetration rate is the distance in a period of time that the drill bit deepens the wellbore. A penetration rate change is a sign of a formation change or that a downhole obstruction has been milled through.

Penetration Rate Change Reasons for changes in the rate of penetration: Pore pressure Formation changes or environment Hydraulics rotary speed Fluid properties Bit type Weight on bit Bit condition Which of the above reasons can change rapidly?

Penetration Rate Change The drilling break is usually one of the first signs noted that downhole formations and/or pressures have changed. May be a sudden increase in penetration. Depending on bit and formation, ROP may decrease. This is referred to as a reverse break such as experienced in the Black Warrior basin in Alabama or when using PDC bits. A flowcheck should be performed whenever a new formation is encountered or a change in the rate of penetration occurs.

Increase in Flow of Fluid from the Well A fixed amount of fluid is displaced into the well every minute as long as the pump is running at a constant rate. So, the rate of fluid returns should be constant. Changes in the rate of returns can indicate formation flow adding to returns, increasing flow out. (Decrease in rate may indicate leakage to formation.) When possible, always set high and low flow alarms.

Flow Checks and Flow When any of the established trends change, a flow check is warranted. The most definitive sign that a well is kicking is flow from the well with the pumps shut down. Flow check while on bottom: Notify Company Man Stop rotating Pick up off bottom Shut down pump(s) Observe well carefully If the flow slows and stops, then it is usually ok to continue activities. However, if the flow does not stop a kick may be occurring and the well must be shut in.

Flow Checks and Flow Flow check on trips: Notify Company Man Not as definitive as when on bottom. - Stop pipe movement - Observer well carefully if flowing the well must be shut in.

Trip Logs The use of trip sheets are the best way to keep track of fluid to fill-up the well during a trip out of the well. Tracks actual amount to fill vs theoretical. Theoretical fill is based on pipe displacement and length pulled prior to check point (i.e. 5 stds DP, 3 stds HW, 1 std collar). Must account for displacement of all different types of tubulars in the well (work string, tubing, tools, drill pipe, collars, hevi-weight, etc.).

Trip Logs Actual fill is determined by recording barrels to fill using re-circulating tanks, trip tank or strokes to fill using pump strokes. If deviation from theoretical displacement volume occurs, monitor the well closely for flow. If flowing, shut the well in and decide on best course of action to take.

Pit Gain or Losses A gain in pit volume occurs when formation fluid entering the well displaces fluid out of the hole. This is a sign that a kick is occurring. Perform flow check, and shut well in if flowing. Communication between pits, operational and rig floor personnel is critical.

Pit Gain or Losses A loss in pit volume occurs when leakage or fluid loss to the formation occurs. If severe enough, results in loss of HP column height. Decrease in HP may allow the well to kick. Always set high and low pit alarms with close tolerances

Pit Gain or Losses

Pit Gain or Losses

Pump Speed/Pressure Change An influx of formation fluid provides for a decrease in density of the fluid column and hydrostatic pressure exerted by the fluid column decreases. The decreased hydrostatic of the fluid column requires less force to move it and can result in pump pressure and/or pump rate changes. Where downhole clearances are very small, any influx will elongate greatly. This may cause pump rate to decrease and circulating pressures to increase.

Torque/Drag Increase and Hole Fill As a result of the string coming in contact with the well, rotary torque slowly increases as the well gets deeper. If the formation is soft and the HP column to formation pressure differential increases, some formation may close in after drilled. An increase in cuttings also may occur as the bit s teeth take larger bites into the formation Both can result in an increase in torque.

Hole Fill/Sloughing Shale When formation pressure gets to be greater than the fluid column pressure, the column to become less effective in holding up the walls of the hole. This results in shale beginning to slough off the sides of the wellbore. This is sometimes referred to as spalling, popping or heaving shale.

Hole Fill/Sloughing Shale Sloughing shale may cause tight hole, fill on bottom between connections and on trips, and may cause the string and other tools to get stuck. Sloughing shale has a long, splintery, and curvy (convex shaped) appearance compared to drilled shale. If severe enough, may register as increase in pump pressure, as it increases the volume of cuttings in annulus. Abnormal pressure is not always the cause of sloughing shale.

Changes in Cuttings Size and Volume Cuttings are rock segments that are chipped or broken away from a formation from the drill bit. If the bit begins to dull while drilling and if the weight on the bit, formation type, and pressure differential remain constant, then the size of cuttings begin to decrease. If the formation pressure increases, the size, shape, and amount of cuttings could increase because the drill bit was able to cut better with a greater pressure differential.

Changes in Cuttings Size and Volume

Changes in String Weight Fluid provides buoyancy to objects in the fluid. This is primarily a function of fluid density. The greater the density, the greater the buoyancy effect. Kicks are usually less dense than the fluid in use. An influx of formation fluid decreases the density in the fluid surrounding the pipe, which in turn, reduces buoyancy. - This results in an increase of weight at surface. - Could show jump in the string weight indicator.

Gas/Oil Shows - Circulating Gas content increase in the returns fluid is a good sign of an abnormally pressure zone and should be monitored carefully. Drill Gas If porous formations containing gas are drilled, cuttings containing gas are moved up the hole and the gas expands. As it returns to surface it may cause the fluid weight to be cut. If severe or shallow enough, gas-cut mud may cause a decrease in hydrostatic pressure.

Gas/Oil Shows - Circulating Connection or Trip Gas Trip gas or connection gas is the accumulation of gas that enters the hole during a connection or trip. Consistent Increases in these types of gas may indicate the fluid to formation pressure differential is changing. Background Gas background gas changes are regarded as a warning that pore pressure is also changing. Ceasing operations and circulating bottoms should clear most of the gas from the well. If gas levels remain elevated, an increase in fluid weight may be warranted.

Gas/Oil Shows - Circulating

Change in Chloride Content If there is insufficient pressure, formation fluid may enter the wellbore and mingle with the circulating fluid, causing the chloride content of the fluid to change. This change in chloride content is a valid indicator of a change in pressure. Though changes occur, they must be measured over hundreds of feet, and may not be a good indicator of an immediate situation.

Flow Line Temperature Increase Extreme temperature can occur in both the transition zone and in the zone of higher pressure below. Flowline temperature can also be a result of a change in: - Circulation rate - Solid content of mud - The chemistry of the mud - Drilling practices When used with other indicators, flowline temperature can help identify transition zones. This should be plotted over distance of drilling.

Flow Line Temperature Increase

Shale Density Decrease Normally pressured shale has gone through normal compaction. Shale density increases consistently with depth in most cases, allowing the density to be predicted. Changes from expected trends can indicate changes in pressure. Change in shale density is often hard to measure and is done over several hundred feet of drilling.

Shale Density Decrease

Variations From d c Exponent The d c exponent method is used sometimes to predict abnormal pressure zones. In order to utilize this method you need to know: The penetration rate Rotary rpm s Weight on bit Hole diameter Modified d c exponent calculations are also used, based on formation and area.

D Exponent Nomograph

MWD/LWD and Logging Once a formation has been drilled, the pore pressure can be determined using electric logs. Typically this is done prior to running casing. MWD, PWD and LWD tools developed to gather this information sooner, while drilling. Can collect data that can be used to detect and predict formation pressure, and has been useful in kick detection.

Kicks Out of the Hole A kick out of the hole generally occurs during the early stages of the trip out, probably when the hole was not filled sufficiently enough towards the latter part of the trip or while pulling the collars. Other times that kicks may occur out of the hole are during extensive logging, wirleine or fishing operations. These operations may cause swab formation fluids into the well, resulting in a kick.

Displacement Trip In If no floats are in use, pipe run into the well should displace a fluid amount equivalent to pipe s displacement. If the pipe is lowered down too quickly, surge pressures will force fluid into the formation ahead of the pipe. This can cause a reduction in hydrostatic pressure, and if decreased below that of the formation pressure the well may being to flow.

Displacement Trip In With an influx in the hole, gas expansion causes additional volume to be displaced out of the hole (more than the pipe s displacement). The fluid displaced out of the hole and the pipe s displacement should always be carefully monitored and measured to be balanced. If they are not equal, there is a problem.

Kicks While Running Casing The problem with kick detection while running casing is that the operation is not focused on kick detection or shutting in the well. Once a kick is detected, the well should be shut in using casing rams or the annular preventer (closing pressure may have to be modified). A crossover circulating swage should be made up prior to the casing run both for circulating and in case the casing float fails.

False Kick Indicators The kick indicators that we examined in this section should not be taken lightly. A pit gain may simply be the transfer of fluid from one pit to another. What happens if a kick occurs during this process? While there may be other non-kick related reasons for a particular warning sign, well control should be top priority. Act accordingly. Always suspect a kick when one or more of these warning signs are present.

Final Thought When in doubt, check it out!

Warning Signs of Kicks Learning Objectives You learned the warning signs that indicate the well may be kicking including: Warning signs of kicks False kick indicators You also learned flow check procedures and that a positive flow show is a definitive sign of a kick.