Extended leak off testing

Similar documents
Worked Questions and Answers

Study Guide IADC WellSharp Driller and Supervisor

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Step-Rate Formation Integrity Test Method for Geothermal Wells

1. The well has been shut in on a kick and the kill operation has not started.

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

SUBSEA KILL SHEET EXERCISE No. 5

Practice Exam IADC WellSharp Driller and Supervisor

Understanding pressure and pressure

August 21, Deepwater MPD / PMCD

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

APPENDIX A1 - Drilling and completion work programme

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

W I L D W E L L C O N T R O L FLUIDS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

SECTION PRESSURE TESTING OF PIPING

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Hard or Soft Shut-in : Which is the Best Approach?

Rig Math. Page 1.

Chapter 5 HORIZONTAL DRILLING

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Hydro-Mech Bridge Plug

Float Equipment TYPE 925/926

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

OCEAN DRILLING PROGRAM

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

WILD WELL CONTROL WARNING SIGNS OF KICKS

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Drilling Efficiency Utilizing Coriolis Flow Technology

Deepwater Horizon Incident Internal Investigation

Casing Design. Casing Design. By Dr. Khaled El-shreef

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures)

Coal Bed Methane (CBM) Permeability Testing

HydroPull. Extended-Reach Tool. Applications

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

DB Bridge Plug. Features. Benefits. Applications

VOLUMETRIC METHODS and STRIPPING OPERATIONS

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

BaraShield -664 LCM Standard Field Application Procedure

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

Why Do Not Disturb Is a Safety Message for Well Integrity

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

GEOTHERMAL WELL COMPLETION TESTS

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

DRILLSCENE PROACTIVE DRILLING DECISIONS

OCTOBER 2017 ISSUE Page 1 of 7

Disposal/Injection Well Pressure Test Report (H-5)

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

FREQUENTLY ASKED QUESTIONS

Colorado Oil and Gas Conservation Commission

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

Chapter 4 Key Findings. 4 Key Findings

HPHT Annular Casing Packer. Obex Annular Casing Packer

Dynamic Underbalance (DUB)

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

Petr 311 Wellbore pressures and Kick Control

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Wellwork Chronological Regulatory Report

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

BaraBlend -665 LCM Standard Field Application Procedure

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Inflatable Packers for Grouting 11/10/00

Design of the full casing program in a deviated well

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Operations planning for optimal hole cleaning

OIL AND GAS DOCKET NO

OPTIMUM SELECTION OF WELL CONTROL METHODS

RIH intermediate section casing in Bazian-1 exploration oil well

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

IWCF Equipment Sample Questions (Surface Stack)

Book 3 - Well Control Calculations

Kicks Controlling Techniques Efficiency in Term of Time

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

Abstract Objective Scope of Study Introduction Procedures

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Transcription:

Extended leak off testing Rev: 1.0 03/01/01

Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures will ensure that both well integrity and stability are maintained as effectively and as efficiently as practicable. If wellbore problems did occur, procedures in well specific guidelines and other relevant documents should be followed. Responsibilities It will be the responsibility of the Operators drilling representative and senior contractor drilling personnel to ensure that others with duties relating operations contained within this document are aware of their roles and responsibilities. Scope These procedures shall apply to all drilling personnel. Further References Drilling contractor s and Operator s mutually agreed specific Extended leak off test Procedures.

Table of contents EXTENDED LEAK OFF TESTING...1 Purpose...2 Responsibilities...2 Scope...2 Further References...2 Table of contents...3 Pre planning Preparations...4 Pre job Procedures...5 EXTENDED LEAK OFF TEST?...8 General...8 Draw guidelines on LOT chart (Fig. 1)...9 During the test...11 Data interpretation...13 Retesting...14 Difference from standard L.O.T. procedures...15

Pre planning Preparations Check offset well leak-off tests (a) Expected leak-off pressures, minimum stresses (b) Required pump rates (c) Shape of plots; anything unusual? Check logs (a) Look for exposed sands: may require higher pump rates, have nonlinear LOT plots, have lower leak-off pressures and minimum stresses (b) Check calliper for washouts: increased risk of poor cement job Consider the cement job. (a) Potential problems? (lack of casing centralization and/or movement; low displacement rates; partial loss of returns). (b) Problems while cementing could mean increased risk of poor cement job.

Pre job Procedures. 1. A casing test will be performed during kick drill, before drilling out the shoe to insure casing and connection integrity. Record volume versus pressure 2. Obtain an estimate of the expected leak-off pressure from offset wells or from an appropriate fracture gradient prediction technique, e.g. Fracture Gradient Predictor software. 3. Determine the surface pressure required to reach the expected leak-off pressure given the proposed weight of mud in the hole. 4. From the estimated surface pressure in step 3, the volume versus pressure plot measured in step1 and the proposed pump rate, determine the length of time expected to reach leak off. If the time is less than 4 minutes then consider (a) using a lower mud weight for the test, or (b) reducing the pump rate to ensure that at least 4 minutes of build up is observed before leak-off. Leak off procedures 5. Drill out the casing shoe, clean out the rat hole and drill 3 meters (10 feet) of new formation. 6. Circulate the hole clean and circulate until the mud in the annulus has homogenous density. 7. Pull the bit inside the casing shoe. Flush lines at the slow circulation rate (SCR) as planned for the leak off (typically 80 lpm or 0.5 bbls/min, see comments below) up the annulus with the cement pump until returns are observed. 8. Close the BOP, space out drill string and line up to perform leak off test to pump down both drill string and annulus. 9. Test lines to 500psi, bleed off then commence pumping with the cement pump. Start logging pressure and volume data at frequent intervals on cement unit, mud logging unit, and on designated pressure gauges on the drillfloor. ( i.e. As often as the pressure recorders are able to). Also record the test manually on a worksheet at a minimum of every 40 litres (¼ barrel) pumped.

10. Pump at the planned pump rate (typically 40-80 lpm or 0.25-0.5 bbls/min, see comments below) with the cement, until 1 minute after the formation breakdown occurs (formation breakdown occurs when subsequent pressure readings are equal to or less than the previous pressure reading). 11. Close in the well with a valve on the cement unit and record the pressure decline until the pressure has been constant for 5 minutes. 12. Record the data in an appropriate plot format and record the interpretation. 13. Bled back volumes and measure volumes returned. 14. Report leak off pressure, volumes pumped and returned and equivalent mud weight obtained from leak off in drilling, IADC reports etc.

Comments to procedure: Step 2 Fracture Gradient Predictor can be obtained from operating and/or service companies. Step 4 It is best to see a minimum of four pressure readings before leak-off occurs to characterise the linear build of the pressure curve so that leak-off can be recognised. Step 6 Take care to clean the rat hole properly, so that the induced fracture will not be propped open by cement or cuttings debris. Consider pumping a hi-vis/hi-density pill to aid in clearing cuttings, which must be circulated out of the hole before the start of the test. If the mud weight is to be increased before drilling ahead, perform leak off before increasing the mud weight to be able to optimise the display of the pressure/volume plot. Step 10 The planned pump rate should be a rate that builds pressure at a minimum of one half the rate observed in the casing test. Typically, this would 80 lpm or 0.5 bbls/min. However, in shallow or higher permeability sediments, higher pumps rates may be required. If the initial pressure build rate is too low, repeat the test at a higher test rate. Pump rates of 120 to 160 lpm (0.75 to 1.0 bbls/min) may be required to get a satisfactory test. Caution: low pressure build rates can also be indicative of significantly increased borehole volume which may indicate the lack of cement behind the casing shoe. If there is a down hole pressure gauge that records data during the test (ex. PWD sub), it should be programmed to give reasonable sampling rate during the test (depends on memory size). Remember to synchronize all clocks (cement unit, mudlogger, PWD etc.) before the LOT. Steps 13 and 14 Bleed back should be done with a constant and low rate. Avoid adjusting the valve during the bleed-back period, as this will disturb interpretation of fracture closure during bleed-back.

Extended leak off test? General Modifications to standard leak off procedures ensure better quality of test results and come at the expense of some preparation on behalf of the testing engineer before the test. The modifications provide the following benefits: 1. Increase reliability and consistency of Leak-off pressure data. 2. Provide consistent and reliable estimates of minimum in-situ stress. 3. Provide calibration points for in situ stress profile and pore pressure estimates, including the quantification of fracture gradient changes in depleted reservoirs. 4. Detect cement channels and eliminate unnecessary cement squeezes. 5. Reduce risk of circulation loss. 6. Provide better data for kick control. 7. Improve estimates of mud-weight (MW) window for drilling operations. 8. Provide reliable data needed for drilling and production stability calculations. 9. Provide data needed for fracture stimulation design and completions. 10. Provide data needed for waste disposal down hole injection design. The commonly expressed concern of weakening the formation because of the small fracture that is created during the Leak-off test, is however minimized by the following factors: 1. Fractures exist in the formation or are introduced by the drilling process anyway. 2. Fractures have the capacity to hold mud-weight. 3. In the rare case of an intact formation, the creation of a small fracture due to a LOT weakens the formation by a very small amount equal to the tensile strength of the formation which is negligible. 4. Mud solids plug the tip of the fracture and/or fill the crack restoring approximately the original capacity of the formation to hold mud-weight. Repeated LOTs and stress tests using clear fluids show that creating a small fracture is not a problem. 5. Shales are usually plastic and tend to heal after a fracture closes.

Draw guidelines on LOT chart (Fig. 1) 1. Minimum volume line: straight line drawn from origin through last data point of casing integrity test (CIT). 2. Estimated leak-off pressure (converted to surface pressure). Obtained from: Offset well leak-off tests Pore pressure estimates 3. V.min: volume at which the minimum volume line intersects the estimated leak-off pressure. 4. Maximum volume line: double the volume of the minimum volume line. Used to decide if pump rate is fast enough. 5. Minimum acceptable leak-off pressure. Used to decide when to stop pumping, and evaluate cement job. Taken as one of the following: Estimated leak-off pressure minus 1/2 ppg (1 ppg for wildcats) Site-specific criteria 6. Maximum pressure: limit imposed by surface equipment, casing, etc. Typical operator s LOT procedures specify pressure should not exceed 80% of the minimum internal yield of the weakest segment of the casing string. 3 Maximum Allowable Pressure 2.5 2 1.5 1 Pressure 0.5 0 Estimated LOP Minimum Acceptable LOP Vmin Min. Volume (Casing Test) Max. Volume 0 1 Volume 2 Figure 1: Leak off test guidelines Estimated Leak-Off Pressure = 0.052*TVD*(Est-MW) Est = estimated LOP (ppg) MW = mudweight in the hole TVD = true vertical depth to casing shoe (top of sand for open hole tests) 2*Vmin 7. Circulate mud until shaker is free of cuttings, and mud weight in equals mud weight out for three consecutive measurements with a pressurized mud balance (bottoms up is usually sufficient). Objective: i. Obtain uniform column of drilling fluid with known density ii. Break-down gel structure iii. Build up filter cake

8. Hang off drill string approximately 10 ft. into casing. Rig up cement pump as shown in Fig. 2. TEST HEAD PURGE VALVE CEMENT PUMP PRESSURE GAUGE DRILLING FLUID DRILL PIPE DISPLACEMENT TANK BLEED VALVE SHUT-IN VALVE RIG FLOOR CLOSED BOP Figure 2: Equipment rig up for a leak off test. 1. Shut-in valve: Installed between the pressure gauge and pump. Close this valve during shut-in; do not rely on the pump to hold pressure. 2. Bleed valve: Installed between shut-in valve and pump. Open during shut-in to check for leaks in the shut-in valve. Also used to bleed off pressure when the test is completed. 3. Purge valve: Used to purge air. Open while filling drill pipe and test head; close when mud starts to flow out valve. 4. Pressure gauge: Four inches or larger for easy visibility. Liquid filled, mounted away from test line for smoother readings. Lowest range, smallest dial increments possible to minimize uncertainties caused by needle oscillations 5. Pump down drill pipe whenever possible. Mud in the drill pipe is less likely to be gelled or contaminated with drill solids than in the annulus. 6. Pressure test: Pressure test the entire surface system before running either a CIT or leak-off test. Observe for leaks. 7. Close annular blow-out preventer.

During the test Pumping 1. Maintain constant pump rate. 2. Try 1/4 bbl/min unless offset well data indicates otherwise. 3. Record/plot pressure every 1/4 bbl regardless of pump rate. 4. If plot drops below maximum volume line before reaching Vmin (see Fig. 3), stop test, bleed off pressure, and start over using 1/4 bbl/min faster pump rate. 5. Do not exceed 1 bbl/min. 3 2.5 2 Pressure 1.5 1 Min. Volume (Casing Test) Too Slow Max. Volume Good Rate 0.5 0 Vmin 0 1 2 Volume Stop pumping (see Fig. 4): Figure 3: Determining pump rate A: If slope decrease occurs above minimum acceptable leak-off pressure, pump an additional 3/4 to 1 bbl (another 3 to 4 data points), then stop. B: If slope decrease occurs below minimum acceptable leak-off pressure, pump one or two more bbls to see if pressure will resume building. If pressure resumes building, return to Case A. C: If plot continuously curves, stop when pressure levels off (3 to 4 points at roughly the same pressure). D: Stop if the pressure abruptly drops while pumping (hard breakdown).

Maximum Allowable Pressure Predicted LOP Minimum Acceptable LOP D A B C Pressure A B C D If slope decrease occurs above the minimum acceptable LOP, pump an additional 3/4-1 bbls (3-4 data points), then stop. If slope decrease occurs below the minimum acceptable LOP, pump 1 or 2 more bbls to see if pressure build-up resumes. For continuously curving plot, stop when pressure levels off. Stop if pressure abruptly drops while pumping (hard breakdown). Volume Shut-in Well Figure 4; When to stop pumping 1. Stop pumps, close shut-in valve. 2. Plot Initial Shut In Pressure (ISIP) immediately after valve is closed, and every two minutes thereafter. 3. Monitor shut-in pressure until the shut-in pressure stabilizes. 4. Look for surface leaks. Bleed-off pressure: record recovered: volume.

Data interpretation Record Measured Depth (MD), True Vertical Depth (TVD), Azimuth and Inclination of the well at the shoe (top of first sand for open hole LOT). Also record pump rate, volume pumped, volume recovered, casing size, and mud properties from the morning report (mud weight, WBM or OBM, LC material, PV, YP, etc.) Pick leak-off pressure (LOP) - see Fig. 5. 1. Draw best fit straight line through pumping data. Ignore first data point. 2. Leak-off pressure is the first point where: a) There is a permanent decrease in slope b) The pressure is the MS pressure. Pick minimum stress (MS) on shut-in curve (Fig. 5) 1. Draw best fit straight line through shut-in data. Start with ISIP. 2. MS is the first point: a) After a permanent decrease in slope b) Where the pressure is LOP PRESSURE (PSI) 1,000 800 LOP: Point at Which Slope Decreases Stop Pump ISIP MS: First Point After Slope Decreases 600 400 Record Every 1/4 bbl Regardless of Pump Rate Record Every Minute for 20 Minutes, or Until the Pressure Stabilizes, Whichever Time Is Least 200 Ignore First Data Point 0 10 20 SHUT-IN TIME (MINUTES) 0 1 2 3 VOLUME (BBLS) Figure 5: Determining leak off pressure and minimum stress

3. Compute equivalent mud weights (ppg) for leak-off pressure and minimum stress: LOP EMW = MW + LOP/(0.052*TVD) MS EMW = MW + MS/(0.052*TVD) where MW is the mud weight (ppg) in the hole at the time of the leak-off test, and TVD is true vertical depth to the casing shoe (top of first sand for open hole LOT). 4. Evaluate the cement job. Cement channels may be indicated by any of the following: 1. LOP EMW is below the equivalent mud weight for the minimum acceptable leak- off pressure 2. LOP EMW / MS EMW 1.10. 3. Shut-in pressure not levelling off (in shale) Keep in mind that the LOP at the shoe could be less than the LOP that is needed. If the minimum stresses measured before and after a squeeze are similar, the squeeze was wasted, even if the LOP went up. Similar minimum stresses mean the same formation is taking fluid. Either: 1. The channel was not repaired, or 2. There is no channel, and the targeted LOP is unrealistic. Retesting ALWAYS retest before squeeze 1. Use same mud weight, pump rate. 2. Channel confirmed when retest shows no improvement. Retest to confirm minimum stress measurement Test again if results vary significantly from previous test. Retest if pressure abruptly dropped significantly while pumping (hard break-down) to determine a valid LOP. Do not use the peak pressure as the LOP.

Difference from standard L.O.T. procedures 1. Consistently collect three to four data points after leak-off before pump is stopped. 2. Monitor shut-in pressure for twenty minutes, or until the pressure stabilizes, whichever time is least. 3. Repeat test before squeezing to confirm presence of channel; also repeat test to confirm minimum stress measurement. 4. Use accurate surface gauges to measure pressure - do not rely on standard rig gauge. 5. Install shut-in valve between cement pump and pressure gauge; do not rely on the pump to hold pressure.