ALO Your Feedback TSA Feedback on ALO Workshop 5 th February
Back Ground Information At the last Staff Reps Conference a number of questions were asked regards to. ALO Working. Is it safe and why do we use this Coss / MC,CC why has it been changed???? Some of you asked to be involved in a workshop either on the day or via TSA Website it was agreed that we feedback to the next Staff Reps Conference in February 2014 on what was discussed
Training Training a a problem problem the the standards standards not not good good enough enough Staff Staff Shortage Shortage is is key key multiple multiple roles roles Move Move training training to to set set a higher higher standard standard for for staff staff to tofollow Move Move training training to to set set a higher higher standard standard for for staff staff to tofollow Guidance Guidance insufficient insufficient ALO ALO brief brief poor poor
A A Clear Clear Training Training Scheme Scheme understanding understanding the the roles roles of of the the LP, LP, SSOWP SSOWP Lets Lets make make Changes Changes to to the the form form industry industry wide wide Training Training matrix matrix ALO, ALO, Planning Planning Anyone Anyone who who has has the the detailed detailed brief brief not not any any compliance compliance or or checks checks in in place place Babcock Babcock
C1 C1 design design received received 11 day day before before the the job job was was planned planned for for T- T-4 not not always always followed followed C1 C1 design design received received 1 day day before before the the job job was was planned planned for for Can Can Network Network Rail Rail train train up up specific specific people people to to deliver deliver ALO ALO training training Can Can we we have have an an industry, industry, company company brief brief visual visual and and audible audible
Babcock Babcock why why don t don t we we have have a a Specific Specific role role for for ALO ALO Planner Planner coordinator coordinator What's What's acceptable acceptable a physical physical barrier barrier or or a barrier barrier train train Forum Forum to to deliver deliver with with contractors contractors assisted assisted by by NWR NWR delivered delivered by by contractors contractors How How will will this this be be cascaded cascaded out out to to the the industry industry concerns concerns people people will will not not understand understand the the brief brief
Briefing on on fair and just culture not briefed out A NWR NWR Project Project Manger Manger wanted wanted to to have have a person person reprimanded reprimanded for for the the investigation investigation he he was was carrying carrying out out why why???? Hauliers Hauliers not not familiar familiar with with the the Work Work safe safe procedure procedure if if he he doesn't doesn't unload unload it it he he wont wont get get paid paid A Machine Machine Operator Operator was was asked asked to to sign sign in in he he said said is is that that something something new new!!!!!!
Why don t we we share best practice with each other LOWS LOWS warning warning device device people people ignore ignore Why Why don t don t we we all all use use magnetic magnetic fencing fencing What's What's the the 20 20 mph mph for for me me or or the the train train? Who Who signs signs off off the the ALO ALO in in each each company company
If If I I report report it it I I will will be be disciplined disciplined Are Are the the TOC S TOC S represented represented on on the the ALO ALO Groups Groups The The safety safety risk risk doesn't doesn't control control the the risk risk to to staff staff Machine Machine controller controller doesn't doesn't sign sign no no paper paper work, work, ALO ALO coordinators coordinators brief brief the the driver driver and and CC CC but but nothing nothing in in place place for for him him to to sign sign no no signature signature Box Box
Update ISLG will lead an cross industry working group to collect best practice from contractors and NR. Current guidance, tasks and competences will be reviewed by the industry working group A framework will be developed to help all contractors transfer robust processes for ALO planning and deployment into their Safety Management Systems. NR will specify minimum requirements Your feedback will be included in the review. Current tasks (e.g. ALO Coordinator) to continue in the meantime. Site assurance checks to be continued.