State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Similar documents
State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 44/State Street High Capacity Corridor

5.0 Roadway System Plan

FY Regional Transportation Improvement Program

Chapter 6 1 Future Transportation System Priorities and Needs

What is the Congestion Management Process? What is Congestion? Growth in the Treasure Valley Development and Congestion

Northwest Foothills Transportation Study Update

Final Report. Southwest Boise Transportation Study. Prepared For: Ada County Highway District

Coming soon: big changes to Eagle Road Many say it's about time, too

Chapter 5 Future Transportation

Review and Comment ACHD s FY Five Year Work Program Draft for Adoption

ACHD COMMISSION DECISION

Northwest Foothills Transportation Study Update

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Engineering - Bicycle and Pedestrian

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Committed to Service. Development Services. February 21, ACHD Commission. Mindy Wallace, AICP

STATION #3 INITIAL ALTERNATIVES

Committed to Service

Solana Beach Comprehensive Active Transportation Strategy (CATS)

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

ACTIVE TRANSPORTATION

REGIONAL TRANSPORTATION ADVISORY COMMITTEE October 25, :30 a.m. COMPASS, 1st Floor Board Room 700 NE 2nd Street, Meridian, Idaho **AGENDA**

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

2.0 Existing Conditions

3.9 Recreational Trails and Natural Areas

Highway 217 Corridor Study. Phase I Overview Report

Golden s Plan. For the Highway 6 & 93 Corridor

Project Description Form 8EE

Project Description Form 6V

TRANSPORTATION & MOBILITY

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

City of Madison: 2017 Capital Budget Capital Improvement Plan

TRANSPORTATION TRAINING TOPICS. April 6, 2010

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

3.0 Future Conditions

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Clackamas County Comprehensive Plan

Committed to Service

Table 1: Recommended Interim Improvement and Long Term Improvement/ROW Preservation Proposed Improvements. Recommended Interim Improvement

section 4 Existing Conditions, Issues, and Options

Committed to Service

Safe Routes to School Action Plan Aberdeen, Idaho

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Basalt Creek Transportation Refinement Plan Recommendations

El Paso County 2040 Major Transportation Corridors Plan

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input

STANLEY STREET December 19, 2017

Castro Valley Municipal Advisory Council March 19, 2018

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Route 7 Corridor Study

This page intentionally left blank.

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

SNCC Demographic Trends

Proposed Project I 35 from Denton to Cooke County Line

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Transportation Corridor Studies: Summary of Recommendations

Lynchburg District Update

SUMMARY OF TRANSPORTATION INVESTMENTS

5. RUNNINGWAY GUIDELINES

Peer Review of Highlands Neighborhood Traffic and Pedestrian Safety Plan

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Planning Guidance in the 2012 AASHTO Bike Guide

Committed to Service

Figure 1: East West Connector Alignment Alternatives Concept Drawing

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

This page intentionally left blank.

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Route 29 Solutions Projects

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Metropolitan Council Transportation Committee

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Third Street Bridge & Corridor Project

Technical Working Group November 15, 2017

Central Jersey Transportation Forum. March 2007

Parks Highway: MP Lucus Road to Big Lake Road

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

To: ACHD Commissioners and Director 3/14/2017. Peer Review of Highlands Neighborhood Traffic and Pedestrian Safety Plan Information Briefing

Alternatives Public Workshop

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

Executive Summary Route 30 Corridor Master Plan

This chapter describes the proposed circulation system and transportation alternatives associated with

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Transcription:

Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho Transportation Department (ITD) designated it as Idaho s first safety corridor that is, a priority for funding for improvements. Additionally, ITD has studied the creation of an expressway to extend Highway 16 to connect to I-84. The future expressway would parallel McDermott Road. One of the study recommendations was a new bridge over the Boise River, now under construction, that will extend State Highway 16 from State Highway 44 (State Street) south to US Highway 20/26 (Chinden Boulevard). Other studies are needed to consider McDermott Road as a possible extension of State Highway 16 south of I-84. The Corridor at a Glance Mostly rural Two lanes wide o The new Boise River bridge is four lanes wide More than 24 miles long o Gem County to State Highway 44 is 8¼ miles o Bridge and connection to US 20/26 is two miles o US 20/26 to I-84 is 4½ miles o I-84 to Union Pacific Road is 4½ miles o Union Pacific Railroad to Mora Canal is nearly five miles Currently no transit services on State Highway 16 or McDermott Road; no park-and-ride lots No bike lanes or sidewalks From Ustick Road to Kuna-Mora Road, the Ada County/Canyon County boundary follows McDermott Road Points of interest (north to south) o Foothills, brush and grassland, little irrigation o Willow Creek drainage, Firebird Raceway o River Birch Golf Course and Woodriver Cellars o Irrigated farmland and irrigation canals from foothills to Kuna-Mora Road o State Highway 44 (State Street) intersection o Bridge over Boise River and connection to US Highway 20/26 under construction o A few homes/driveways on McDermott Road from US 20/26 to I-84 o Railroad crossing (Boise Valley Railroad)

o No overpass on I-84, no north-south connection o Several rural subdivisions, homes/driveways on McDermott south of I-84 to Victory Road o No bridge/crossing over Indian Creek or railroad (Union Pacific) North-south connection available via Locust Lane and Greenhurst Road o Road ends at Mora Canal; no direct connection to Bowmont Road or Kuna-Mora Road Problem State Highway 16 is the main commuter route from Gem County to the Treasure Valley. It is only two lanes wide and the location of increased traffic and accidents. ITD, local citizens, and elected officials have identified improvements needed in the corridor. Traffic north of State Highway 44 is projected to increase from about 12,000 vehicles per day in 2013 to about 45,000 vehicles in 2040. This is similar to the current level of traffic on State Highway 55 (Eagle Road). One major development north of the City of Eagle could add 6,000 or more homes, plus a significant amount of commercial space. Vehicles per Day (Beacon Light Road to State Highway 44) in thousands 2013 2040 Funded * 2040 Funded Plus Unfunded ** capacity/congestion*** Current and Future 1 2013 2040 Population 5,447 38,294 Households 1,803 13,863 Employment 1,260 11,392 * 2040 Funded reflects the 2013 regional transportation system and all the expansion/improvement projects that are funded in agencies approved budgets or capital improvement plans, listed in CIM 2040 (Chapter 6, Tables 6.2 and 6.3). ** Unfunded projects/improvements includes all the unfunded needs discussed in this summary and listed in CIM 2040 (Chapter 6, Table 6.5). *** This is an approximate level where there is too much traffic for the road to carry and speeds will get slower as congestion gets worse. Each road s capacity depends on a number of variables, including truck traffic, number of driveways, and road conditions. It s interesting to note the effects a funded project, or the lack of a project, can have on parallel roadways. ACHD has funds committed to widen Linder Road from Franklin Road north to Beacon Light Road. Without widening State Highway 16 north of State Highway 44, traffic on Linder Road is expected to swell to 44,000 vehicles per day, well over its capacity. As the Treasure Valley grows, more capacity will also be needed south of State Highway 44. ITD has already studied a future State Highway 16 expressway between State Highway 44 and I-84. Without the 1 Population, housing, and employment in the corridor are based on neighborhoods and other developments near State Highway 16 and McDermott Road.

expressway, traffic on McDermott Road is anticipated to increase to 14,000 vehicles per day near or at capacity for the roadway. If no improvements are made to McDermott Road south of I-84, traffic is expected to increase from 500 vehicles per day in 2013 to 12,000 per day in 2040. More studies are necessary to explore the need for and feasibility of other projects south of I-84: connecting the expressway/i-84 to McDermott Road with a full interchange filling in gaps on McDermott Road (canal and railroad crossings) preserving right-of-way for future widening and other improvements to McDermott Road Currently, on an average day, it takes 35 minutes to drive from the Ada /Gem County line to the end of McDermott Road near Bowmont Road/Kuna-Mora Road. Without improvements to State Highway 16 and McDermott Road, the same drive in 2040 could take one hour and 25 minutes. If the unfunded project needs for this corridor (see below) plus needs identified for other corridors were to be built, the same drive in 2040 would not take any longer than it does today. Drive Times, 2013 vs. 2040, Gem County Line to Bowmont Road/Kuna-Mora Road Each pie chart represents one hour. Drive times are in dark brown. 2013 2040 Funded * 2040 Funded Plus Unfunded ** * 2040 Funded reflects the 2013 regional transportation system and all the expansion/improvement projects that are funded in agencies approved budgets or capital improvement plans, listed in CIM 2040 (Chapter 6, Tables 6.2 and 6.3). ** Unfunded projects/improvements includes all the unfunded needs discussed in this summary and listed in CIM 2040 (Chapter 6, Table 6.5). Other Considerations Roadway Users Most of the analysis to identify the increased traffic issue is based on cars, the main mode of transportation on streets and highways. Pedestrians and vehicles such as bicycles, freight trucks, farm equipment, and buses, may also share the road. On expressways, pedestrians and bicyclists are usually prohibited. Environmental Issues Changes to a roadway can impact the surrounding environment as well as the people who live nearby. Before major road projects are built, their potential effects are analyzed to make sure they meet

environmental regulations as well as provide for environmental justice, ensuring all people can be involved and are treated fairly. 2 There are a number of sensitive issues to consider in this corridor: historic structures near the alignment, particularly near SH 44 and Ustick Road wildlife zones and historic trails along the Boise River wildlife area in the northern portion, from Chaparral Road to the county line properties along the highway north of SH 44 and south of I-84 largely un-assessed for historic issues one historic structure south of I-84 near the alignment The corridor does not include minority or low-income population concentrations. Budgeted Projects Roadway ITD is currently designing a rehabilitation project on State Highway 16 from the junction of State Highway 44 to the City of Emmett. The project will be constructed in 2016 at a cost of about $1.1 million. Also, ITD obtained Grant Anticipation Revenue Vehicles (GARVEE) bond funds to build a new river crossing from State Highway 44 to US Highway 20/26 near the cities of Eagle, Meridian, and Star. The project will be complete in 2014 and cost about $111 million. ACHD s Capital Improvements Plan 3 (CIP) includes a project to improve the State Highway 16 and Beacon Light Road intersection for $1,730,000; and several intersection improvement projects along McDermott Road, at Ustick Road, Cherry Lane, and Franklin, Amity and Lake Hazel Roads. The total cost is estimated at $9,562,000 (this includes costs for Canyon County agencies, as well). Unfunded Future Needs Roadway: A continuous four-lane route from the Ada/Gem County line south to Bowmont Road/Kuna- Mora Road (see priority 32) could alleviate future congestion and lower accident incidence along State Highway 16. Right-of-way along McDermott Road south of I-84 could be preserved as a future expressway, and connect to another future expressway proposed for Kuna-Mora Road. The State Highway 16 expressway connecting Emmett to State Highway 44 and US 20/26 to I-84 is not funded. The work on State Highway 16, including design, right-of-way, construction of a four-lane expressway, and interchanges at State Highway 44, US 20/26, Ustick Road and Franklin Road/I-84 will cost $350-$400 million. Incremental implementation building new or widened sections that can be retained in a conversion to a divided highway/expressway may be an option. Driveway access in parts of this corridor could be limited, and interchanges could replace intersections. McDermott Road is vital to the region because of its future role as a north-south route. ITD, Ada County Highway District, the Nampa Highway District, and the City of Nampa will need to work together to determine what type of road this could be south of I-84. 2 See federal environmental justice definitions at www.epa.gov/region07/ej/definitions.htm. 3 www.achdidaho.org/departments/rowds/cip.aspx

There is no estimated cost for constructing McDermott to arterial standards (five lanes wide) south of I- 84. A bridge across the Union Pacific tracks will be required at a cost of $8-$10 million and numerous waterways will also require bridges. A corridor study would be needed to identify right-of-way, access points, intersection designs, and tie-in with Bowmont Road and Kuna-Mora Road. Bus Service/Park and Ride: The regional transit services plan, valleyconnect, calls for the following in the near- to medium-term: Bus Route #48, a regional express route connecting Emmett to the College of Western Idaho transfer center. Regional express routes serve limited stops and run about every 30 minutes during peak hours. other bus routes and park-and-ride lots that allow users to access a possible future transit station at the Boise Valley Railroad new park-and-ride lots in the near-term o City of Emmett o intersection of State Highway 44 and State Highway 16 o City of Kuna new park-and-ride lots in the medium-term o one between Star and Emmett o intersection of US Highway 20/26 and State Highway 16 (future expressway) o intersection of Ustick Road and State Highway 16 (future expressway) Walking/Biking: There are no pathways proposed for State Highway 16. However, there are several pathways planned for the surrounding area, including: bike lanes on several streets that cross State Highway 16 (Beacon Light Road and Floating Feather Road) and McDermott Road (McMillan Road and Ustick Road) 4 pathways that would cross McDermott Road along waterways near US Highway 20/26 (Chinden Boulevard), McMillan Road, Ustick Road, Cherry Lane, Overland Road, and Victory Road, as well as a path adjacent to the Boise Valley Rail Road 5 Operations, Management and Technology Projects: Aside from road widening, other actions such as improving driveways or changing the traffic signals can help improve traffic conditions. The regional Intelligent Transportation System (ITS) plan 6 calls for the following on existing segments of State Highway 16: a weather information and warning system, a pilot project that deploys road-weather-based safety and warning systems in up to two high-accident locations that are prone to severe weather conditions due to elevation or exposure ITS deployment installations o fiber-optic communications and conduit from State Highway 44 (State Street) to US 20/26 (Chinden Boulevard) o speed detection o approximately two closed-circuit television cameras 4 http://www.achdidaho.org/projects/publicproject.aspx?projectid=77 5 http://www.meridiancity.org/parks_rec.aspx?id=2667 6 Final Report: Treasure Valley Transportation System: Operations, Management, and ITS, is online at www.compassidaho.org/prodserv/cms intro.htm.