Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

Similar documents
Option W: N. Washington Street Project

UDC Street Cross Sections

WELCOME. City of Eden Prairie West 70 th Street

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Lawrence Avenue Streetscape Concepts August 30, 2011

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

TRANSPORTATION STANDARDS

S T A T I O N A R E A P L A N

Appendix B - Street Sections

STREETSCAPE CONCEPT PLAN

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Streetscape: Core Shopping District

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Fulton Market Streetscape

PUBLIC REALM MASTER PLAN

DEFINING THE STREETSCAPE DRAFT

71st Street Streetscape Master Plan Study

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Henderson Ave. Complete Streets Project

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Why invest in the 1 Street S.W. Corridor?

MARTIN LUTHER KING JR. WAY

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

1.3 Pedestrian Environments

5. Automobile Circulation, Wayfinding and Signage

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Clarkson Walkability Audit: Results and Recommendations Summary

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Knox Street Complete Streets Project

Elm Street Business District: Streetscape and Signage Plan

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements

Chapter 3: Multi-Modal Circulation and Streetscapes

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

4 GENERIC COST ESTIMATING TOOL

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Blackfalds Downtown. Architectural Guidelines: Streetscape

RZC Appendix 8A Marymoor Subarea Street Requirements

Schutte Park Master Plan February 14, 2017

Functional, Preliminary Design and Detailed Design

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Omaha s Complete Streets Policy

Chapter 6: Along the Street

Observations and Ideas: Toomer s Corner Streetscape Improvements

CURBSIDE ACTIVITY DESIGN

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

MINUTES FROM THE EIGHTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre.

STREETSCAPE CONCEPTS

Dowling/Beaty Cycling Route

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Ocean Park Boulevard Green Street Project Community Workshop

Guthriesville Village Manual of Written & Graphic Design Guidelines

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

PART A: IDENTIFICATION/LOCATION

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

A Guide to Great Streets: The Basics. September 25, 2009

City of Richmond Bicycle Master Plan

GENERAL. 1. Description

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

5 CIRCULATION AND STREET DESIGN

Victoria Park Master Plan

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Long Island Rail Road Expansion Project Floral Park to Hicksville

STREETSCAPE / URBAN DESIGN ELEMENTS

DISTRICT BICYCLE PROGRAM

4.0 STREETSCAPE ELEMENTS

Transportation Planning Division

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

BLOOMFIELD GATEWAY AND STREETSCAPE IMPROVEMENT PLAN

Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Pavement Rehabilitation & Buffered Bike Lane

City of Darlington Beautification Report

2.0 Existing Conditions

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

State Street Workshop Summary September 26, 2012 SITE A. - INTERSECTION OF STATE AND HOLLY TOTAL ATTENDEES = ~29

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Richmond-Adelaide Cycle Tracks

Healthy Built Environments Cowlitz-Wahkiakum County, Washington

Site 1180_042 Kekaulike Mall. Bikeshare Hawaii. Location: ewa side of Kekaulike Mall makai of Hotel Street. Power Source: solar

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

Sidewalk Accessibility Checklist

PARK(ING) DAY 2018 GUIDELINES

Construction Newsletter No. 32 October 14, 2016 On-Going

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

Transcription:

Proposed Mural Proposed Sitting Area Ninth St Proposed Bump-out Bike Lane and Buffer Zone Proposed Trees and Sitting Area Tenth St Bike Sign to Lake 47

Proposed Trees and Sitting Area Eighth St Bike Lane and Buffer Zone Proposed Mural Proposed Sitting Area Ninth St P d B t 48 LAKESHORE VILLAGE

Sixth St Proposed Trees and Sitting Area Parallel Parking Bay Proposed Sitting Area Media Box Islington Ave Intersection Feature Paving Seventh St Proposed Major Gateway Existing Trees 49

Existing Foutain to Remain Improved Sitting Area Fifth St Bike Lane and Buffer Zone Existing Trees 50 LAKESHORE VILLAGE

Proposed Mural and Bike Sign to Lake Existing Light House to Remain Fourth St 51

Proposed Minor Gateway Sign Second St Bike Lane and Buffer Zone Proposed Bump-Out and Sitting Area Bike Sign to Lake Third St Proposed Mural and Bike Sign to Lake 52 LAKESHORE VILLAGE

Dwight First St Intersection Feature Paving Proposed Railing Flower Boxes Proposed Bump-Out and Sitting Area Proposed Minor Gateway Sign Second St 53

54 LAKESHORE VILLAGE BIKE RACK - F.2 DURATHERM - PA.2 PLANTING - PL.1 BIKE LANES - PA.3 ASTRAL MEDIA MEDIA BOX - F.7 EXISTING LIGHT POLE SIGNAGE/BANNER - F.1 S - BENCH - F.6 STREETPRINT XD- PA.1 BUMP OUT DETAIL #1

LS. 1.0 5TH + LAKE SHORE Feature paving applications will consist of four separate treatments. The intersection of Fifth Street and Lake Shore Blvd demonstrates the following paving features found within the Lakeshore Village chapter. PA.1 StreetPrint XD At twelve intersections Street Print XD will be applied; 5 major intersections and 7 minor intersections. Major intersections include where Lake Shore Blvd meets 1st Street, 3rd Street, 5th Street, 7th Street and 10th Street. Minor intersections include where Lake Shore Blvd meets 2nd Street, 4th Street, 6th Street, 8th Street, 9th Street 11th Street and 12th Street. The pattern and colour may be customized according to the BIA branding study. PA.3 Bike Lanes Existing Bike lanes run east/west on Lake Shore Blvd. The lanes will be repositioned against the existing curb. So as to not compete with the adjacent paving patterns and colours, the lane will be painted with the City of Toronto standard white marking. PA.2 Duratherm Parking Stalls The on-street parking will be repositioned to the outside of the bike lane. The stalls will be treated with a StreetPrint XD surface in a complimentary standard colour and pattern to the feature intersection paving F.1, F.2, F.6, F.7 Furniture Banners will be added to existing street poles, flower pots, benches and bike racks will be arranged along the south side of Lake Shore Blvd. Proposed softscape planted bump out - Note: All paving patterns and colours are conceptual. The BIA will determine the colour, layout, and pattern at a later date LS. 1.0 5TH + LAKE SHORE 55

BIKE LANE - PA.3 ASTRAL MEDIA BENCH F.7 FLOWER POTS - F.3 BIKE RACK - F.2 S- BENCH F.6 EXISTING LIGHT POLE SIGNAGE/BANNER - F.1 STREETPRINT XD - PA.1 BUMP OUT DETAIL #2 56 LAKESHORE VILLAGE

LS. 2.0 3RD + LAKE SHORE PA.1 StreetPrint XD At twelve intersections Street Print XD will be applied; 5 major intersections and 7 minor intersections. Major intersections include where Lake Shore Blvd meets 1st Street, 3rd Street, 5th Street, 7th Street and 10th Street. Minor intersections include where Lake Shore Blvd meets 2nd Street, 4th Street, 6th Street, 8th Street, 9th Street 11th Street and 12th Street. The pattern and colour may be customized according to the BIA branding study. PA.3 Bike Lanes Existing Bike lanes run east/west on Lake Shore Blvd. The lanes will be repositioned against the existing curb. So as to not compete with the adjacent paving patterns and colours, the lane will be painted with the City of Toronto standard white marking. PA.2 Duratherm Parking Stalls The on-street parking will be repositioned to the outside of the bike lane. The stalls will be treated with a StreetPrint XD surface in a complimentary standard colour and pattern to the feature intersection paving F.1, F.2, F.6, F.7 Furniture Banners will be added to existing street poles; flower pots, benches and bike racks will be arranged hardscape bump out areas along the south side of Lake Shore Blvd. using colour unit paving coordinated with the BIA branding identity. Proposed bump out pedestrian plaza - Note: All paving patterns and colours are conceptual. The BIA will determine the colour, layout, and pattern at a later date LS. 2.0 3RD + LAKE SHORE 57

AREA VIEW 1 AREA VIEW 2 DETAIL VIEW 2 AREA VIEW 3 DETAIL VIEW 1 AREA VIEW 4 KEY PLAN Mimico by the Lake BIA Master Plan 0 5 10 25 50 meters 0 5 10 25 50 meters 58 Mimico by the Lake

MIMICO BY THE LAKE AREA VIEW 1 AREA VIEW 2 AREA VIEW 3 AREA VIEW 4 DETAIL 60 61 62 63 66 59

Alexander St. Major Gateway sign Replace uneven Pavement with proposed sitting area Bike Lane Decorative Paving Treatment at Parking Stall Consolidated Tree Planter TTC Shelter Pedestrian Light and Banner Decorative Paving Bike Intersection Intersection Feature Paving Burlington Ave. 0 5 10 25 Remove Unit PAvers and replace with Concrete Sidewalk 60 Mimico by the Lake Decorative Paving Bike Intersection

Burlington Ave. Remove Unit PAvers and replace with Concrete Sidewalk Decorative Paving Bike Intersection Sitting Areas Loading Strip Pedestrian Light and Banner Parking Stall with Decorative Paving Concrete Sidewalk New Tree Planting Proposed Mural Sitting Areas Consolidated Tree Planter Concrete Sidewalk 0 5 10 25 50 me 61 Pedestrian Light

Areas Consolidated Tree Planter Concrete Sidewalk Mural Pedestrian Light and Banner Albert Ave. Parkette Street Edge Planters to be reviewed and engineered where possible Bike Racks Parking Feature Paving Proposed Astral Media Box 0 5 10 25 62 Mimico by the Lake