CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

Similar documents
CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

ADA Training Standard Plans


Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Engineering Design Criteria & Standard Drawings

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Preparing a Curb Ramp Project. December 15, 2010

SECTION VII ROADWAY AND SITE IMPROVEMENTS

City/ Town: Route: Intersection Name; Street Names:

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

CURB RAMP INSPECTION REPORT

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA VOLUME I - YEAR 2010 REVISIONS

Complete Streets for Eastham Prioritization Plan Eastham Library JUNE 13, 2018

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

WEEKLY CONSTRUCTION REPORT

~~: men o. CITY of NOVI CITY COUNCIL. Agenda Item C February 21, erv1ces, ng1neenng IVISIOn. t ft:g br s E o..

Paul Vraney Bureau of Project Development 02/11/2016

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

City of Scotts Valley CITY COUNCIL STAFF REPORT

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

GENERAL LEGEND 12"CMP

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1

INTERSECTION WITH RIGHT TURN TAPER

Field guide for Accessible Public Rights-of-Way Edition

Homework Module 7.01 Drivers Manual Study Questions

Restoration Requirements

Americans with Disabilities Act and Curb Ramps

2009 Manual on Uniform Traffic Control Devices

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

SECTION PRESSURE TESTING OF PIPING

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

San Fernando School Route Improvement Program Phase 3 Cycle 2 Federal Grant Application Project List

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

PLANNING COMMISSION MEETING MINUTES May 17, 2017 CITY COUNCIL CHAMBER 7:00 P.M.

DESIGN PUBLIC HEARING SEPTEMBER 26, 2017 PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

Pine Point Study Committee. Report and Recommendations to Scarborough Town Council. December 10, 2009

SITE DEVELOPMENT PLAN FOR PLANTATION LANDING TOWNHOMES WILMINGTON, NORTH CAROLINA

Water Street Promenade Engineering and Design Services

GENERAL. 1. Description

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

TORONTO MUNICIPAL CODE CHAPTER 886, FOOTPATHS, PEDESTRIAN WAYS, BICYCLE PATHS, BICYCLE LANES AND CYCLE TRACKS. Chapter 886

Meadow Woods Elementary School

Field guide for Accessible Public Rights-of-Way Edition

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

C. Brian Shamburger, P.E., PTOE Kimley-Horn and Associates, Inc. State of Texas Registered Firm #928

Orange Center Elementary School

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT

ADA Operations Contact Info

ROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE

S TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 !

City of Columbia Engineering Regulations Manual

CITY OF ROSEVILLE DESIGN STANDARDS

ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES

SECTION 3 STREET DESIGN

Derby Street. Project Updates. Salem, Massachusetts

Driveway Design Criteria

Sidewalk Replacement Study Stowe, VT

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Final Sidewalk Feasibility Study

CITY OF LANCASTER PROPOSED NEW PROJECTS

ADA TRANSITION PLAN FOR ACCESSIBILITY OF PEDESTRIAN FACILITIES WITHIN THE PUBLIC RIGHT-OF-WAYS FRANKLIN COUNTY, FLORIDA

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

0 CITY OF SANTA ANA 0

CITY OF PAPILLION, NEBRASKA

Portland Peninsula Sidewalk and Ramp Inventory

Kansas Department of Transportation. Tabulation of Bids

HYANNIS, MASSACHUSETTS TRANSPORTATION IMPROVEMENT PROGRAM

Taylor Road Resurfacing Project

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

Emerson Circle Entrance

ADA Operations Contact Info

Transcription:

Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:11am. GENERAL NOTES AND LEGEND

Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:11am AS NOTED KEY PAVEMENT SCHEDULE AND SHEET LOCUS

Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:13am MATCH LINE C-1 (BOTTOM) MATCH LINE C-1 (TOP) ROUTE 6 I MATCH LINE C-2 (TOP)

MATCH LINE C-2 (TOP) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:14am MATCH LINE C-1 (BOTTOM) MATCH LINE C-2 (BOTTOM) ROUTE 6 II MATCH LINE C-3 (TOP)

MATCH LINE C-3 (TOP) MATCH LINE C-4 (TOP) MATCH LINE C-2 (BOTTOM) MATCH LINE C-3 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:15am ROUTE 6 III

MATCH LINE C-3 (BOTTOM) MATCH LINE C-4 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:16am MATCH LINE C-4 (TOP) MATCH LINE C-5 (TOP) ROUTE 6 IV AND BRACKETT ROAD

MATCH LINE C-5 (BOTTOM) MATCH LINE C-4 (BOTTOM) MATCH LINE C-13 (BOTTOM) MATCH LINE C-13 (TOP) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:17am MATCH LINE C-5 (TOP) MATCH LINE C-12 (BOTTOM) OLD COUNTY ROAD AND MASSASOIT ROAD MATCH LINE C-6 (TOP)

MATCH LINE C-6 (BOTTOM) MATCH LINE C-5 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:19am MATCH LINE C-6 (TOP) MATCH LINE C-7 (TOP) MASSASOIT ROAD AND ROUTE 6 V MATCH LINE C-12 (TOP)

MATCH LINE C-6 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:20am MATCH LINE C-7 (BOTTOM) MATCH LINE C-7 (TOP) MATCH LINE C-8 (TOP) GREAT POND ROAD AND KINGSBURY BEACH ROAD

MATCH LINE C-8 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:21am MATCH LINE C-7 (BOTTOM) MATCH LINE C-8 (TOP) KINGSBURY BREACH ROAD AND ROUTE 6 VI MATCH LINE C-9 (TOP)

MATCH LINE C-8 (BOTTOM) MATCH LINE C-9 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:22am MATCH LINE C-9 (TOP) MATCH LINE C-10 (TOP) ROUTE 6 VII

MATCH LINE C-9 (BOTTOM) MATCH LINE C-10 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:23am MATCH LINE C-10 (TOP) ROUTE 6 VIII MATCH LINE C-11 (TOP)

MATCH LINE C-10 (BOTTOM) MATCH LINE C-11 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:24am MATCH LINE C-11 (TOP) ROUTE 6 IX AND SAMOSET ROAD

Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:26am MATCH LINE C-6 (BOTTOM) MATCH LINE C-5 (BOTTOM) ROUTE 6 X AND EXTENDED SERVICES I

MATCH LINE C-5 (BOTTOM) Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:27am MATCH LINE C-5 (TOP) EXTENDED SERVICES II AND III

GATE VALVE AND VALVE BOX DETAIL CONCRETE THRUST BLOCK DETAIL AT TEE / PLUG CONCRETE THRUST BLOCK DETAIL AT BEND Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:27am TYPICAL SERVICE CONNECTION HDPE WATER MAINS TYPICAL SERVICE CONNECTION DUCTILE IRON WATER MAINS FIRE HYDRANT ASSEMBLY DETAIL CONSTRUCTION DETAILS I

DEWATERING BAGS 12" DIAMETER FILTER SOCK Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:27am SEDIMENTATION CONTROL AT CATCH BASINS SILT SACKS DECHLORINATION DETAIL TRENCH DETAIL 1 - TOWN RIGHT-OF-WAY AND PRIVATE WAYS LOAM AND SEED (DISTURBED AREAS) CONSTRUCTION DETAILS II

SCALE: NTS SETTING VERTICAL GRANITE CURB DETAIL Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:28am BITUMINOUS CONCRETE CAPE COD BERM SCALE: NTS TRENCH DETAIL 2 - STATE HIGHWAY LAYOUT (WITHIN TRAVEL LANE) CROSSWALK DETAIL SCALE: NTS TRENCH DETAIL 3 - STATE HIGHWAY LAYOUT (WITHIN SIDEWALK) CONSTRUCTION DETAILS III

WHEELCHAIR RAMP FOR ONE CONTINUOUS DIRECTION OF PEDESTRIAN TRAVEL SCALE: NTS SIDEWALK THROUGH DRIVEWAYS WITH CURB RETURNS - 2' CURB CORNERS SCALE: NTS DETECTABLE WARNING PANEL FOR WHEELCHAIR RAMPS SCALE: NTS Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:28am WATER MAIN CROSSING STATE HIGHWAY TRAVEL LANE SCALE: NTS SINGLE SHORT- AND LONG-SIDE WATER SERVICES AND HYDRANT LATERALS SCALE: NTS MULTIPLE SHORT- AND LONG-SIDE WATER SERVICES AND HYDRANT LATERALS WITHIN 30 FT SCALE: NTS PERMANENT PAVEMENT RESTORATION DETAILS WORK WITHIN STATE HIGHWAY LAYOUT TRAVEL LANES WATER MAIN ALONG STATE HIGHWAY TRAVEL LANE SCALE: NTS CONSTRUCTION DETAILS IV

Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:29am CONSTRUCTION DETAILS V