Long List of Level 1 Alternatives

Similar documents
the New Transit Systems in the Tappan Zee Bridge/I287 Corridor

STATION #3 INITIAL ALTERNATIVES

Regional Transportation Needs Within Southeastern Wisconsin

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Washington DC Section of ITE Project Briefing

Previous Transit Studies MTTF MEETING #

Stakeholders Advisory Working Groups (SAWGs) Bridge and Bike / Pedestrian SAWG (#15)

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Fitting Light Rail through Well-established Communities

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Chapter 4 Transportation Strategies to Support Growth

Highway 217 Corridor Study. Phase I Overview Report

North Coast Corridor:

Public Information and Participation Comments

Appendix T-2: Transportation Facilities Inventory

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

Transportation Master Plan Advisory Task Force

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40

I-290 Phase 1 Study Alternatives Tool Box.

Comprehensive Collection of Stakeholder Alternatives by Mode

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Performance Criteria for 2035 Long Range Transportation Plan

York Region Population and Employment Growth

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Priced Managed Lanes in America. October 2013

MnPASS System Today and the Future

CPC Parking Lot Riverside Drive. Transportation Rationale

2. Context. Existing framework. The context. The challenge. Transport Strategy

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

5. RUNNINGWAY GUIDELINES

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Improving Mobility Without Building More Lanes

STUDY ADVISORY COMMITTEE. October 8, 2015

Santa Clara I-280 CORRIDOR STUDY

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Congestion Management Report

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Route 7 Corridor Study

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Bluffdale/ UDOT South High-T Intersection Project Type Operations

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Proposed Project I 35 from Denton to Cooke County Line

NEWMARKET CENTRE Mobility Hub Profile

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

C C C

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

Freeway Improvement Project

DON MILLS-EGLINTON Mobility Hub Profile

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

Solana Beach Comprehensive Active Transportation Strategy (CATS)

TRANSPORTATION IMPROVEMENT STRATEGY

Webinar- Importance of Multi- Modal Transit Connections and Fare Policy for Regional Transit Mobility & Equity

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

Preliminary Transportation Analysis

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

Transportation, Parking & Roads

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

405 Express Lanes General Information & Frequently Asked Questions

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Provide Employee Parking

2. What concepts do you think would address the problem?

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Freeway System Considerations

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

WHAT IFS: Over the course of

State Highway 44/State Street High Capacity Corridor

FM #: ETDM #: 11241

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Request for Authorization to Open Public Comment Period

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

395 Express Lanes Extension

ABERDEEN: CITY OF THE FUTURE

North Shore Transportation Improvement Strategy

DON MILLS-SHEPPARD Mobility Hub Profile

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Alternatives Public Workshop

Transcription:

New York State Thruway Authority MTA Metro-North Railroad Long List of Level 1 Alternatives Tappan Zee Bridge/I-287 Environmental Review June 8, 2003

Long List of Alternatives Alternative No. Title Description TRAVEL DEMAND MANAGEMENT/ TRANSPORTATION SYSTEM MANAGEMENT ALTERNATIVES (TDM/TSM) Travel Demand Management Alternatives (TDM) TDM-1: Enhance Existing Metro Pool Employee Trip Reduction (ETR) Programs Enhance educational efforts Develop an I-287/CWE Corridor Education TDM-1.1 and Promotion Program TDM-1.2 TDM-1.3 TDM-1.4 TDM-1.5 Increase funding for outreach to Corridor employers Introduce a car-sharing program Employers provide showers and lockers for those walking/cycling to work Toll-free programs for off-peak users from participating employers TDM-1.6.1: Employee Parking Management: Charge employees for parking Encourage employers to adopt Metro Pool programs Provide rental cars for commuters who only need a car occasionally, on hourly or daily basis Provide facilities to encourage workers to walk/cycle to work Encourage the use of flex-time in exchange for reduced or no tolls on the TZ Bridge Combine incentives for alternative modes with disincentives, such as parking fees TDM-1.6 TDM 1.6.2: Employee Parking Management: Cash in lieu of Parking Provide cash rewards for switching from driving to alternate modes of travel TDM 1.6.3: Employee Parking Management: Restrain parking supply Encourage alternate travel modes by restricting availability of free parking TDM-1.7 Mandate Participation in Metro Pool ETR Program Require employers to encourage alternate travel modes TDM-2: Expand Easy Street Vanpool Program TDM-2.1 Increase funding for Easy Street Program Expedite implementation and expansion of vanpool program TDM-2.2 Reduce vanpool user costs to encourage greater participation Provide subsidies, free parking and reduced or no tolls for vanpool users TDM-3: Corridor-wide Parking Pricing and Management Mandate parking policies, eliminate local restrictions TDM-3.1 Establish Parking Authority and develop enhancement programs 1

TDM-4: Carpool and Transit Priority TDM-4.1.1: Restrict existing TZ Bridge reversible lane to HOV: HOV2+ only Permit only vehicles with 2 or more occupants to use the existing reversible lane TDM-4.1 TDM-4.1.2: Restrict existing TZ Bridge reversible lane to HOV: HOV3+ only TDM-4.1.3: Restrict existing TZ Bridge reversible lane to HOV: Transit/vanpools only TDM-4.1.4: Restrict existing TZ Bridge reversible lane to HOV: HOV3+ and premium toll for other vehicles TDM-4.2.1: Create new priority lanes on widened or new crossing: HOV2+ only Permit only vehicles with 3 or more occupants to use the existing reversible lane Permit only transit vehicles and vanpools to use the existing reversible lane Permit only vehicles with 3 or more occupants to use the existing reversible lane at the current toll; other vehicles will have to pay a premium toll to use reversible lane Permit only vehicles with 2 or more occupants to use the new priority lanes TDM-4.2 TDM-4.3 TDM-4.4 TDM-4.2.2: Create new priority lanes on widened or new crossing: HOV3+ only TDM-4.2.3: Create new priority lanes on widened or new crossing: Transit/vanpools only TDM-4.2.4: Create new priority lanes on widened or new crossing: HOV3+ and premium toll for other vehicles Priority lanes for buses/vanpools/carpools at the toll plaza TDM-4.4.1: Priority lanes on feeder arterials at approaches to I-287 TDM-4.4.2: Priority lanes on parallel arterials Permit only vehicles with 3 or more occupants to use the new priority lanes Permit only transit vehicles and vanpools to use the new priority lanes Permit only vehicles with 3 or more occupants to use the new priority lanes at the current toll; other vehicles will have to pay a premium toll to use priority lanes Use special EZPass lanes for HOV only Priority lanes on north-south feeder routes for HOV only Priority lanes on arterials parallel to I-287 for HOV only TDM-4.4.3: Priority lanes on entrance ramps Priority lanes on entrance ramps for HOV only TDM-5: Tolls and Pricing TDM-5.1 TDM-5.1.1: Congestion Pricing - Increase TZ Bridge car tolls during peak periods TDM-5.1.2: Congestion Pricing - Introduce Corridor-wide, distance-based tolls TDM-5.1.3: Congestion Pricing - Eliminate commuter discount on the TZ Bridge Increase peak period tolls to encourage off-peak travel Introduce variable tolls to influence travel choices and control congestion Eliminate discount for individual car use except during off-peak period; maintain discount for HOV 2

Transportation System Management Alternatives (TSM) TSM-1: Real-Time Distribution of User Information TSM-1.1 TSM-1.2 TSM-1.3 TSM-1.4 Improve and expand use of electronic signs Improve and expand the use of highway advisory radio Improve and expand the use of the Internet Expand TRANSMIT speed readers Increase number of signs, their sophistication and their ability to divert traffic Provide additional signing and broadcast points to improve ability of drivers to seek alternate routes Increase access to TZ website at park-and-rides and Intermodal Centers Improve speed data gathering to identify incidents and enhance emergency response TSM-1.5 Employ TRIPS Technology Electronically notify road users of traffic status TSM-2: Improve the Integration of Train and Bus Service TSM-2.1 Notify bus drivers of train delays Buses can be held to meet delayed trains TSM-2.2 TSM-2.3 Post real-time arrival information at train stations Provide real-time information for bus riders TSM-3: Dynamic Traffic Management System TSM-3.1 TSM-3.2 Ramp access controls Ramp terminal real-time signal coordination TSM-4: Commercial Vehicle Programs TSM-4.1 Congestion pricing for commercial vehicles TSM-5: Incident Management Implement comprehensive Incident TSM-5.1 Management Program for the I-287/CWE corridor Commuters are prepared for train arrivals, facilitating boarding Passengers can be informed of bus arrivals times through the use of Global Positioning Systems Ramp metering controls entering traffic based on mainline congestion Highway traffic exiting to/entering from local streets can be controlled by adjusting signal cycles to avoid bottlenecks Congestion pricing for trucks to encourage use of alternative routes Monitor, evaluate and decrease response/congestion clearance times for optimum performance and safety 3

Alternative No. TS-B1 TS-B2 TS-B3 Title Description TRANSIT SERVICE IMPROVEMENT ALTERNATIVES (TS) Bus Transit Service (B) Provide increased service, including connecting routes and Expand Tappan Zee Bus Corridor Routes better coordination with train schedules Expand bus service locations and frequency on parallel Expand Other Bus Routes roads and north-south arterials Expand shuttle service to land uses with higher densities of Expand/Create Additional Shuttle Service population or jobs, or higher levels of activities: office parks, hotel complexes, recreational centers Rail Transit Service (R) TS-R1 Improve rail service on Hudson Line Increase peak period express service TS-R2 TS-R2.1: Improve rail service on Harlem Line - Increase Service without a Third Track TS-R2.2: Improve rail service on Harlem Line - Increase service with a Third Track Increase mid-day service A third track is required to provide the capacity needed to increase peak period express service TS-R3 Improve rail service on New Haven Line Increase peak period express service TS-R4 TS-R5 TS-F1 TS-F2 TS-F3 TS-R4.1: Improve rail service on the Pascack Valley Line once Secaucus Transfer Opens - Improve frequencies and add midday/return service. TS-R4.2: Expand rail infrastructure capacity with additional tracks Expand capacity of the Pascack Valley Line between Spring Valley and Secaucus. TS-R5.1: Improve rail service on the Port Jervis Line once Secaucus Transfer Opens - Increase frequencies and midday/return service. TS-R5.2 Expand rail infrastructure capacity with additional tracks. - Expand capacity of the Port Jervis Line between Sloatsburg and Salisbury Mills. Ferry Service (F) Expand Ferry Service between Haverstraw and Ossining Implement New Ferry Route between Nyack and Tarrytown TS-F3.1 Implement New High Speed Ferry Route Between Orange/Rockland/Westchester Counties and Manhattan Improved service on single track line Construct passing sidings Improved service on single track line Double-track the line or construct passing sidings. Increase ferry service to connect with more Hudson Line trains to Grand Central Terminal Provide ferry service to meet Hudson Line trains in both directions Provide high speed ferry service directly from Nyack, Haverstraw and Newburgh to Yonkers and existing west side terminals in Manhattan 4

Alternative No. Title TS-F3.2 Implement New Hovercraft Ferry Service Between Orange/Rockland/Westchester Counties and Manhattan Description Provide hovercraft ferry service directly from Nyack, Haverstraw and Newburgh to Yonkers and existing west side terminals in Manhattan Parking Improvements to Support Existing/Expanded Transit Services (P) TS-P1 to P14 S-P15 to P25 S-P26 Implement current short-term plans for Parking Improvements Additional Parking Improvements to Support New/Expanded Transit Services Implement EZ Pass at Park & Ride Facilities Park-and-ride improvements to be implemented in the next five years Longer-term park-and-ride improvements, including new and expanded facilities Provide EZ Pass as a method of paying at Park & Ride Facilities. Pedestrian/Bicycle Pathways (PED) TS-PED1 Provide access to river crossing alternatives that include new pedestrian/cyclist pathway Connections to existing pathway networks on either shore of the Hudson River 5

Alternative No. Title Description CORRIDOR IMPROVEMENT ALTERNATIVES (CI) CI-R1 CI-R2 Roadway Improvements (R) CI-R1.1: Improve Mainline - Add a fourth GP lane in each direction from Interchange Provide lane continuity for the entire length of I-87 in the 15 in Suffern to Interchange 11, Route 9W Corridor in Nyack CI-R1.2: Improve Mainline - Add a fourth GP lane in each direction from Interchange Provide additional lane capacity to accommodate the four 14A, Garden State Parkway to Interchange interchanges west of Interchange 11 11, Route 9W in Nyack CI-R1.3: Improve Mainline - Add a fourth GP lane in each direction from Interchange Provide additional lane capacity to accommodate the two 13, Palisades Parkway to Interchange 11, interchanges west of Interchange 11 Route 9W in Nyack CI-R1.4: Improve Mainline - Add a westbound auxiliary climbing lane from the TZ Bridge to Interchange 14A, Garden State Parkway CI-R1.5: Improve Mainline - Enhance Programmed Roadway Improvements in Westchester County between the TZ Bridge Toll Plaza and Interchange 10, Route 120, CWE CI-R1.6: Improve Mainline - Improvements to CWE between Interchange 10 (Route 120) and Interchange 11 (I-95) Improve Various Interchanges and Transition areas Provide an auxiliary climbing lane to alleviate bottlenecks and unsafe conditions on steep westbound upgrades Enhancements to programmed improvements by NYSDOT may be identified and developed based on Corridor-wide roadway network analysis and traffic simulation modeling Potential improvements to be identified/developed based on traffic simulation modeling Potential improvements to be identified/developed based on traffic simulation modeling CI-BR1 CI-BR2 CI-BR1.1: New BRT transitway on I-287 with service between Suffern and Port Chester Access controlled and barrierseparated busway CI-BR1.2: New BRT transitway on I-287 with service between Suffern and Port Chester - Buffer-separated transit only lanes in Rockland County Bus Rapid Transit on Parallel Arterials through conversion of existing traffic or parking lanes Bus Rapid Transit (BR) Dedicated busway for most of the length of the I-287 Corridor Left-lane bus lanes constructed for BRT operation, entering/exiting the roadway in mixed traffic in Rockland. Buses run in mixed traffic in Westchester Existing traffic or parking lanes converted to "basically exclusive" bus lanes coupled with priority at traffic signals and other ITS measures 6

CI-CR1 CI-CR2 CI-CR3 CI-CR4 CI-CR5 CI-CR6 CI-CR7 CI-CR8 CI-CR9 CI-LR1 CI-LR2 CI-LR3 New Commuter Rail Line from Port Jervis Line to Hudson Line within I-287 corridor New Commuter Rail Line from Port Jervis Line to Hudson Line within I-287 Corridor between Suffern and West Nyack in Rockland County then via Remote Southern River Crossing. (Includes double-tracking of West Shore Line) New Commuter Rail line from Port Jervis Line to Harlem Line, within I-287 corridor, including 3 rd tracking of Harlem Line New Commuter Rail line from Port Jervis Line to New Haven Line, within I- 287 corridor Institute commuter service on West Shore Line between Newburgh in Orange County and Hoboken in New Jersey CI-CR6.1: Commuter and Freight Rail Service from the Port Jervis Line to the Hudson Line CI-CR6.2: Rail Freight Connections from the West Shore Line to the Hudson Line within I-287 Corridor Reinstate the Putnam Commuter Rail Line Rockland-Westchester Commuter Rail Subway New Tarrytown Transfer Facility New Commuter Rail Lines (CR) New rail line mostly within I-287 right-of-way, including new stations and intermodal facilities. Design speed varies from 50 to 100 mph Departs from I-287 Corridor at Interchange 12 to West Shore Line, then along Palisades Interstate Parkway to a remote tunnel river crossing and connection to Hudson Line. New rail line mostly within I-287 right-of-way, including new stations and Intermodal facilities. Design speed varies from 50 to 100 mph. Harlem Line would require third track south of White Plains to provide additional capacity New rail line mostly within I-287 right-of-way, including new stations and intermodal facilities. Design speed varies from 50 to 100 mph. Underground Transfer station in White Plains to the Harlem Line along a new tunnel alignment below the existing White Plains station Expand West Shore Line to provide commuter rail service along entire line Add shared freight service with new commuter rail line (C- CR1). Provide freight access from the West Shore Line across the Hudson River on a new River Crossing facility connecting to the Hudson Line. Acquire rail right-of-way and provide commuter service to points south. Connect proposed corridor commuter rail lines to the reinstated Putnam Line. Construct subway tunnel in Rockland under Route 59 and in Westchester under Route 119. Provide underground stations within local business districts. New Intermodal Center at the River Crossing in Tarrytown to enable transfers between transit modes in the I-287 corridor and the Hudson Line. New LRT/AGT or Monorail Lines (LR) New LRT/AGT or Monorail line connecting Tarrytown to White Plains New LRT/AGT or Monorail line connecting West Nyack to White Plains New LRT/AGT or Monorail line connecting Nanuet to White Plains LRT alignment within I-287 corridor or along Route 119 and Hamilton Ave., with grade separations at major road crossings. (AGT/Monorail would be fully grade separated.) Intermodal facilities would be developed at major stations. Extends C-LR1 alignment across the Hudson river, along the I-287 Corridor to Interchange 11 where it could shift to Route 59 or continue along I-287 to the Palisades Mall. Extends C-LR2 alignment west along I-287 Corridor or along Route 59 to the Pascack Valley Line. 7

CI-LR4 CI-LR5 New LRT/AGT or Monorail line connecting Suffern to White Plains New LRT/AGT or Monorail line connecting Suffern to Port Chester/Rye Extends C-LR3 alignment west to Suffern along the Piermont Branch right-of-way or along I-287 Corridor Extends C-LR4 alignment east along Route 119, I-287 rightof-way to Port Chester or Rye. CI-CWT1 CI-CWT2 CI-CWT3 New Cross Westchester Tunnel (Multi-modal) (CWT) Intermittent Shallow Tunnel Sections Highway alignment along I-287 with intermittent tunnel between the Hudson River and I-95 with sections that eliminate interchanges. Above ground above ground interchanges and Commuter alignment provided to maintain major interchanges. Rail Commuter rail in tunnel throughout. Shallow Tunnel from Hudson River to I- 95 with below ground interchanges and Commuter Rail Deep Tunnel from Hudson River to I-95 with below ground interchanges and Commuter Rail Highway alignment and Commuter rail along I-287 in shallow tunnel throughout. Highway alignment and Commuter rail along I-287, in bored tunnel throughout. 8

Alternative No. Title RIVER CROSSING ALTERNATIVES (RX) Description Retain the Existing Tappan Zee Bridge Preservation Alternatives (P) Continue maintenance program to extend service life 50 years. Seismic deficiencies, traffic capacity limitations, operational deficiencies not addressed. No Build Alternative. RX-P1 Preserve TZB with 4/3 Operation Retains current reversible lane operation RX-P2 Preserve TZB with 6 GP lanes and a reversible Reversible lane is restricted to bus only, or bus and priority lane HOV use Rehabilitation Alternatives without Widening (R) Upgrades TZB to meet current structural and safety codes, including seismic criteria, extending service life for 50 years. Similar to RX-P1. Pedestrian/bicycle use not RX-R1 Rehabilitate with 4/3 operation accommodated, highway geometrics limited by existing structure RX-R2 Similar to RX-P2. Pedestrian/bicycle use not Rehabilitate with 6 GP lanes and a Reversible accommodated, highway geometrics limited by Priority Lane existing structure Rehabilitation Alternatives with Widening (RW) Upgrades TZB to meet current structural and safety codes, including seismic criteria, extending service life for 50 years. RX-RW1 Widen to 8 GP lanes Widening at truss results in split roadway RX-RW2 RX-RW3 RX-RW4 RX-RW2.1: Widen to 6 GP lanes plus 2 priority lanes RX-RW2.2: Widen to 8 GP lanes plus 2 priority lanes RX-RW3.1: Widen to 6 GP lanes plus Commuter Rail RX-RW3.2: Widen to 8 GP lanes plus Commuter Rail RX-RW4.1: Widen to 6 GP lanes plus LRT/AGT or Monorail RX-RW4.2: Widen to 8 GP lanes plus LRT/AGT or Monorail Pedestrian/bicycle path accommodated Widening at truss results in split roadway Pedestrian/bicycle path accommodated Widening at truss results in split roadway Pedestrian/bicycle path accommodated Widening at truss results in split roadway Replace the Existing Tappan Zee Bridge Replaces the bridge with a new bridge, or tunnel, or combinations of bridge and tunnel. Replacement Bridge (B) Replacement Bridges have potential alignments parallel to and immediately south of the existing Tappan Zee Bridge. Bridges could include a pedestrian/bicycle pathway; tunnels and serial bridge/tunnels would not. New 8 lane bridge RX-B1 Replacement Bridge with 8 GP lanes RX-B2 RX-B3 Replacement Bridge with 8 GP lanes and 2 lane Busway RX-B3.1: Replacement Bridge with 8 GP lanes and Commuter Rail RX-B3.2: Replacement Bridge with 6 GP lanes, 2 Busway lanes and Commuter Rail New 8 lane bridge with 2 lane Busway (equivalent to 10 lanes) restrictions restrictions 9

Alternative No. RX-B4 RX-B5 Title Replacement Bridge with 8 GP lanes and LRT/AGT or Monorail Replacement Bridge with 8 GP lanes, Commuter Rail and LRT/AGT or Monorail Description New 8 lane bridge with 2 light rail tracks, following highway profile restrictions Replacement Bored Tunnel (BT) Each Bored Tunnel replacement alternative has potential alignments in three generalized locations: parallel to, immediately north of, and immediately south of the existing Tappan Zee Bridge RX-BT1 Replacement Bored Tunnel with 8 GP lanes New 8 lane tunnel RX-BT2 RX-BT3 RX-BT4 RX-BT8 Replacement Bored Tunnel with 8 GP lanes and 2 lane Busway Replacement Bored Tunnel with 8 GP lanes and Commuter Rail Replacement Bored Tunnel with 8 GP lanes and LRT/AGT or Monorail Replacement Bored Tunnel with 8 GP lanes, Commuter Rail and 2 lane Busway New 8 lane tunnel with 2 lane Busway (equivalent to 10 lanes) restrictions New 8 lane tunnel with 2 light rail tracks New 8-lane tunnel with 2-lane Busway, (equivalent to 10 lanes) and Commuter Rail. Replacement Immersed Tunnel (IT) Each Immersed Tunnel replacement alternative has potential alignments in three generalized locations: parallel to, immediately north of, and immediately south of the existing Tappan Zee Bridge RX-IT1 Replacement Immersed Tunnel with 8 GP lanes New 8 lane tunnel RX-IT2 RX-IT3 RX-IT4 RX-IT8 Replacement Immersed Tunnel with 8 GP lanes and 2 lane Busway Replacement Immersed Tunnel with 8 GP lanes and Commuter Rail Replacement Immersed Tunnel with 8 GP lanes and LRT/AGT or Monorail Replacement Immersed Tunnel with 8 GP lanes, Commuter Rail and 2 lane Busway New 8 lane tunnel with 2 lane Busway (equivalent to 10 lanes) restrictions New 8 lane tunnel with 2 light rail tracks New 8-lane tunnel with 2-lane Busway, and Commuter Rail. Replacement Serial Bridge and Tunnel (B/T) Each Serial replacement alternative has potential alignments in two generalized locations: immediately north of, and immediately south of the existing Tappan Zee Bridge Replacement Serial Bridge / Tunnel with 8 GP RX-B/T1 New 8 lane bridge/tunnel lanes RX-B/T2 RX-B/T3 RX-B/T4 RX-B/T8 Replacement Serial Bridge / Tunnel with 8 GP lanes and Busway Replacement Serial Bridge / Tunnel with 8 GP lanes and Commuter Rail Replacement Serial Bridge / Tunnel with 8 GP lanes and LRT/AGT or Monorail Replacement Serial Bridge / Tunnel with 8 GP lanes, Commuter Rail and Busway New 8 lane bridge/tunnel with 2 lane Busway (equivalent to 10 lanes) restrictions. New 8 lane bridge/tunnel with 2 light rail tracks New 8 lane bridge/tunnel with Commuter and 2 lane Busway 10

Replacement Bridge and Transit Tunnel (B+BT or B+IT) Each Replacement Bridge and Transit Tunnel alternative has potential alignments in three generalized locations: parallel to, immediately north of, and immediately south of the existing Tappan Zee Bridge RX-B+BT2 RX-B+BT3 RX-B+BT4 RX-B+BT5 RX-B+IT2 RX-B+IT3 RX-B+IT4 RX-B+IT5 Replacement Bridge with 8 GP Lanes and Bored Tunnel with 2 lane Busway Replacement Bridge with 8 GP Lanes and Bored Tunnel with Commuter Rail line Replacement Bridge with 8 GP Lanes and Bored Tunnel with LRT/AGT or Monorail Replacement Bridge with 8 GP Lanes and LRT/AGT or Monorail and Bored Tunnel with Commuter Rail and LRT/AGT or Monorail Replacement Bridge with 8 GP Lanes and Immersed Tunnel with 2 lane Busway Replacement Bridge with 8 GP Lanes and Immersed Tunnel with Commuter Rail line Replacement Bridge with 8 GP Lanes and Immersed Tunnel LRT /AGT or Monorail Replacement Bridge with 8 GP Lanes and LRT/AGT or Monorail and Immersed Tunnel with Commuter Rail New bridge with total of 8 lanes and bored tunnel with 2 lane Busway restrictions. New bridge with total of 8 lanes and bored tunnel with 2 light rail tracks restrictions New bridge with total of 8 lanes and immersed tunnel with 2 lane Busway restrictions. New bridge with total of 8 lanes and immersed tunnel with 2 light rail tracks Build a new bridge with total of 8 lanes and 2 light rail tracks and tunnel with commuter rail Supplement the Tappan Zee Crossing with Additional Crossing (SB, ST or SB/T) Any supplemental crossing can be combined with any of the alternatives that retain the existing Tappan Zee Bridge. New bridges could accommodate a pedestrian/cyclist pathway; new tunnels and serial bridge/tunnels would not. RX-SB1 RX-ST1 RX-SB6 RX-ST6 RX-SB/T6 RX-ST7 RX-SB1.1: Supplemental Bridge with 4 or 6 GP lanes - Remote North Location New highway bridge at remote location north of Nyack RX-SB1.2: Supplemental Bridge with 4 or 6 lanes - Remote South 1 Location New highway bridge at remote location south of Piermont RX-SB1.3: Supplemental Bridge with 4 or 6 lanes - Remote South 2 Location New highway bridge at remote location near New Jersey border Supplemental Bored Tunnel with 4 or 6 GP lanes New bored highway tunnel at a remote location south Remote South Location of Piermont Supplemental Bridge with Commuter Rail only New Commuter Rail bridge at a remote location Remote South Location south of Piermont RX-ST6.1: Supplemental Bored Tunnel with New bored tunnel with Commuter Rail located Commuter Rail only - in existing Tappan Zee immediately north of, parallel to, or immediately Corridor south of the existing Tappan Zee Bridge RX-ST6.2: Supplemental Bored Tunnel with New bored tunnel with Commuter Rail at a remote Commuter Rail only Remote South Location location south of Piermont Supplemental Serial Bridge and Immersed Tunnel New Commuter Rail bridge/tunnel located with Commuter Rail only in existing Tappan Zee immediately north of, parallel to, or immediately Corridor south of the existing Tappan Zee Bridge New LRT/AGT or Monorail immersed tunnel located Supplemental Immersed Tunnel with LRT/AGT or immediately north of, parallel to, or immediately Monorail only - in existing Tappan Zee Corridor south of the existing Tappan Zee Bridge 11

Hybrid River Crossings (HB) A combination of a new replacement bridge with the partial use of the existing Tappan Zee Bridge New highway bridge that crosses the existing alignment, and a new rail crossing that passes under Blauvelt Park in a tunnel, over the western part of the Hybrid Replacement Bridge with Commuter Rail river on a separate bridge, to join the new highway RX-HB1 connecting to the Putnam Line bridge to pass over the channel. (Consideration will be given to incorporating segments of the existing trestle). Commuter rail tunnel would continue in Westchester and connect to the Putnam Line. 12