Top Drive Lifting Configuration Manual Update

Similar documents
SAMPLE PAGE. Section 2... Wire Rope

Versie Date: USAGE AND SAFETY MANUAL SPREADERBEAMS

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Roughneck TM Mesh Slings

User Instruction Manual

TULSA CHAIN.COM, LLC.

Pro-Stringer Tennis Quick Start Stringing Instructions

Installation, operation & maintenance manual - original version

WELDING POSITIONER MODEL NO:

Technical Data. Luffing Capacities. Luffing Attachment (supersedes 5784)-1217-U2Luffer

Fiber Cable Puller with Tuf-Lugger lite

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

HMO500. Headrest Hardware. Stealth s Multi-Axis Headrest Hardware. Installation Manual INSTALLATION INSTRUCTIONS FOR. Stealth Products HMO500 Hardware

M S I C R A N E S C A L E

Demag TC3000

Methods of installation of ADSS fiber optic cables

Crane & Rigging Brain Teasers

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

INSTALLATION INSTRUCTIONS

The advantages of the Impact NecksGen unit

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

MANITOWOC MODEL TON CAPACITY

Hydraulic and Electrical Service Loop Pins

Lab 7 Rotational Equilibrium - Torques

Crosby Rigging Guide For Lifting READ ONLINE

TRP 63 / TRP 72 / TRP 93 / TRP 110 CENTRE LATHES

CLASS CYCLE P8000 OWNER'S MANUAL JOHNSON HEALTH TECH. CO., LTD.

PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

National 400B. Certification CraneSafe Certification. CraneSafe + Fulford Harbour Group Tel:

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

E Lightband Compression Tool Operating Procedure

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

LiftAlloy Chain Slings

Gurney Flap for WRX and STI w/low Profile Trunk Spoiler

Heavy Equipment & Rigging Specialist Training

MSA Confined Space Entry Equipment

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

S Surge Arresters

INSTALLING THE BOLT-IN-PLACE FOOTPLATE KIT (FIGURE 1)

View thousands of Crane Specifications on FreeCraneSpecs.com. MANITOWOC M-85W 95-Ton liftcrane 20,000 lb CLAMSHELL 18,000 lb DRAGLINE

Operator Interface Enclosures

GENERAL SAFETY PART 1 SLIPS, TRIPS, AND FALLS SPRAINS & STRAINS ADVERSE WEATHER

LiftAlloy TM Chain Slings

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT

BUTTERFLY VALVES Series 800

User Instruction Manual Fixed Beam Anchor

Lifting Slings. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

8012, 8018 & ,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES

Model MTB-ASME Vertical Bladder Tanks

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

Trogear Bowsprit Through Hull Installation Manual

Model MTB-ASME Horizontal Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

Weighing your Seabee

Overspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1)

SB18m. rigging manual (EN)

GEMTOR. ... when your life is on the line OWNER'S MANUAL. FLW Series Self-Retracting Lanyard/Fall Limiter

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Product Name: Angel Anchor

Counter Weight Lifting Gantry Cylinder Operation INDIA CKE2500, CKE2500-2

User Instructions 1790 Rail Anchor

1.3 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

Horizontal Bladder Tanks

S-60-TO : 1 ton tower system INSTRUCTION MANUAL

Chain Sling Saddle Rings

Vertical Bladder Tanks

Import Bike Rack OEM INSTALLATION MANUAL

Bike Rack and Tire Carrier

Hoist Ring Forged Hoist Ring Machined Hoist Ring (Metric) Hoist Ring Swivel Shoulder Eyebolts JD Weld-On Alloy Lifting

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

S0300-BV-CAT-020 AIR COMPRESSOR SYSTEM, SUB SALV, 1150-CFM, 500-PSI. System - DS0130. System DS0130 7/8/2018 2:56:57 AM

User Instruction Manual Fixed Beam Anchor

BABY ROCKER WITH TOY BAR

It allows you to. is the Best Option. More information at

Product Bulletin No.: TDS Top Drive Drilling System

Principles of glider flight

MODEL ANALOG ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.2 TO 100FT OPERATING RANGE ANALOG OUTPUT

Service Bulletin WRSPUDF Ride-On Roller Screeds LPG Hose Replacement

! CAUTION! ! WARNING! General Information

Ground Release Shackle

Index Table. Model 794. Installation, Operating and Maintenance Instructions

Mandatory Bulletin BO

Flow controller Type ED/CCB311 Instruction manual

M ANITOWOC M-65 W. 65-MTon liftcrane 6,804 6,124. Courtesy of Crane.Market KG CLAMSHELL KG DRAGLINE

GUARDIAN FALL PROTECTION

WorkFit-T. User's Guide. Sit-Stand Desktop Workstation. Features & Specifications ENGLISH. Components. Tools Needed. A+B= lbs (

Ceiling Lift. Arm Extension OWNER S MANUAL

IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact DBI/SALA.

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

i2i Head & Neck Positioning System

RCW-3001 & RCWINCH Please read this document carefully, it gives instructions for the correct use of this product

Invacare Top End Parts Catalog

SUBJECT: Report of Stabbing Guide Falling from PH-50 Pipe Handler

Assembly Instructions. -Cantilever Boat Lifts

BAMBI BUCKET (ALL MODELS)

PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS

Transcription:

Model: Standard 500/750T and 275T Serial #: See Serial Numbers Affected Aug. 31, 2016 Product Bulletin # TDS-162 Top Drive Lifting Configuration Manual Update The Standard 500/750T and 275T Top Drive Parts Manual has been updated to include lifting configurations for models 6027AC, 1250AC, and 1275AC. Lifting configuration for above mentioned models is attached to this product bulletin for reference. Some units built for offshore installations may be configured differently, hence this procedure will not apply to those units. Serial Numbers Affected 275T Top Drive, S/N: 1112 and up and any units with guard # AY17787 or AY21530 installed. Standard 500T Top Drive, S/N: 221 and up. Standard 750T Top Drive, S/N: 151 and up. RIGLINE 24/7 Support Line: 866.433.4345 International: +1 281.774.5649 Fax: 281.774.1940 E-mail: support@rigline247.com Document ID 16-018 v 2.0 Copyright 2016 Canrig Drilling Technology Ltd. All rights reserved. 1 of 1

SUBSECTION 3B: TOP DRIVE AND TORQUE GUIDE INSTALLATION INSTRUCTIONS Top Drive Lifting Configuration Model 6027... 3-41 Top Drive Lifting Configuration Model 1250AC and 1275AC... 3-47 The drawings in this Subsection are provided to represent TYPICAL TORQUE GUIDE INSTALLATIONS. As applications tend to differ from one rig to the next, the user should refer to the drawings in Section 6 of this Manual for specifications and instructions for the specific application. Revision August 2016 3-39

Canrig Top Drive Drilling System 3-40 Revision August 2016

Top Drive Lifting Configuration Model 6027AC The top drive may need to be lifted during rig-up, rig-down, or when performing a repair job. Canrig recommends lifting the top drive using the torque guide or shipping skid if any of these options are available. If this is not possible, then lift the top drive using the top drive lifting lugs located on the guard. The following cases illustrate typical scenarios when it is required to lift the top drive using the lugs. Case 1 considers lifting the top drive while it is horizontal with two hooks, whereas case 2 considers lifting the top drive with one hook. Case 3 describes the scenario when lifting the top drive from a horizontal-to-vertical or vertical-to-horizontal position, which typically occurs during rig-up or rig-down. This procedure applies to units with Guard # AY17787 or AY21530 installed S/N: 1112 and up or some rebuilt units. Refer to the Top Drive Manual for additional information. Prior to using the lifting lugs located on the guard, ensure the guard is mounted securely to the top drive. Case 1: Horizontal Lifting Configuration for Balanced Load (Two Hooks) This lifting configuration considers using two hooks to lift the top drive while it is horizontal. The first hook should align with the location of the top drive lifting lugs (slings A and B) and the second hook (sling C) should align with the point on the quill halfway between the tool joint clamp and end of the spindle. See Figure 3B.1 for reference. This configuration indicates the maximum load on the top drive lifting lugs when lifted while it is horizontal. The top drive should never be higher on the quill side when lifted. Never exceed the maximum safe working load for each lifting lug of 12,000 lb. Lifting Considerations The minimum length for each lifting lug sling (see slings A and B on Figure 3B.1) is 5' 8" (1.7 m). Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). Adjust the length or elevation of the strap on the quill (sling C) such that the top drive remains horizontal at all times while lifting. See Figure 3B.1. 3-41

Hook 1 Hook 1 SLI 1200 NG A 0 lb M AX. 68 in. [1.7 m] LIFTING LUG SLING HALFWAY BETWEEN TOOL JOINT CLAMP AND END OF THE SPINDLE STANDARD 275T TOP DRIVE WEIGHT 18000 lb STANDARD 275T TOP DRIVE WEIGHT QUILL FULLY DOWN Hook 1 SLING A SLING B Figure 3B.1: Horizontal Lifting for Balanced Loads (Two Hooks) 3-42 GB SLIN MAX. 0 lb 1200 SLING A, B

Case 2: Horizontal Lifting Configuration for Balanced Load (One Hook) This lifting configuration is considering using only one hook to lift the top drive while it is horizontal. In this case, one hook lifts the top drive using three slings (slings A, B, and C). See Figure 3B.2 for reference. This configuration indicates the maximum load on the top drive lifting lugs when lifted while it is horizontal. The top drive should never be higher on the quill side when lifted. Never exceed the maximum safe working load for each lifting lug of 9,000 lb. Lifting Considerations The minimum length for each lifting lug sling (see slings A and B) is 5' 8" (1.7 m). Minimum length for sling C on quill is 9' 7" (2.9 m). See Figure 3B.2 for reference. Adjust the length of sling on quill (sling C) if top drive is not level while lifting. Top drive should be level while lifting. Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). 3-43

Hook Hook 68 in. [1.7 m] SLI 9000 NG A lb M AX. 115 in. [2.9 m] LIFTING LUG SLING HALFWAY BETWEEN TOOL JOINT CLAMP AND END OF THE SPINDLE QUILL FULLY DOWN 18000 lb STANDARD 275T TOP DRIVE WEIGHT Hook SLING A SLING B Figure 3B.2: Horizontal Lifting for Balanced Loads (One Hook) 3-44 GB SLIN AX. lb M 9000 SLING A, B

Case 3: Horizontal-to-Vertical or Vertical-to-Horizontal Lifting Configuration As mentioned before, the recommendation is to lift the top drive using the torque guide or shipping skid. In this case, the top drive lifting lugs can be used to maneuver the top drive from horizontal to vertical position. See Figure 3B.3 for reference. This configuration indicates the total maximum safe working load on lifting lugs at an angle from 0 to 45. See Table 3B.1. Never exceed the maximum safe working load for each lifting lug, see below. Always use both lifting lugs while lifting. Never lift the top drive with only one lug. Lifting Considerations The minimum length for each lifting lug sling is 5' 8" (1.7 m). See Figure 3B.3 for reference. Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). 3-45

See Table 3B.1 11000 lb Max. 2 3 9000 lb Max. 12000 lb Max. 1 4 6000 lb Max. 45 30 15 LIFTING LUG See Table 3B.1 45 30 6000 lb Max. 4 9000 lb Max. 3 11000 lb Max. 2 15 12000 lb Max. 1 LIFTING LUG No. Angle Total Maximum Lifting Capacity (Using both Lifting Lugs) 1 0 degrees 24,000 lb (horizontal lifting) 2 15 degrees 3 30 degrees 4 45 degrees 22,000 lb (horizontal-to-vertical or vertical-to-horizontal lifting) 18,000 lb (horizontal-to-vertical or vertical-to-horizontal lifting) 12,000 lb (horizontal-to-vertical or vertical-to-horizontal lifting) Table 3B.1 Total Maximum Lifting Capacity Figure 3B.3: Total Lifting Capacity (per lifting lug) 3-46

Top Drive Lifting Configuration Model 1250AC and 1275AC The top drive may need to be lifted during rig-up, rig-down, or when performing a repair job. Canrig recommends lifting the top drive using the torque guide or shipping skid if any of these options are available. If this is not possible, then lift the top drive using the top drive lifting lugs located on the guard. The following cases illustrate typical scenarios when it is required to lift the top drive using the lugs. Case 1 and case 2 consider lifting the top drive while it is horizontal with two hooks, whereas case 3 considers lifting the top drive with one hook. Case 4 describes the scenario when lifting the top drive from a horizontal-to-vertical or vertical-to-horizontal position, which typically occurs during rig-up or rig-down. This procedure applies to 1275AC top drive with S/N: 151 and up, 1250AC top drive with S/N: 221 and up. Some units built for offshore installations may be configured differently, hence this procedure will not apply to those units. Refer to the Top Drive Manual for additional information. Prior to using the lifting lugs located on the guard, ensure the guard is mounted securely to the top drive. Case 1: Horizontal Lifting Configuration for Balanced Load Two Hooks (Top Lifting Lugs) This lifting configuration considers using two hooks to lift the top drive while it is horizontal. The first hook should align with the location of the top drive top lifting lugs (slings A and B) and the second hook (sling C) should align with the point on the quill halfway between the tool joint clamp and end of the spindle. See Figure 3B.4 for reference. This configuration indicates the maximum load on the top drive lifting lugs when lifted while it is horizontal. The top drive should never be higher on the quill side when lifted. Never exceed the maximum safe working load for each lifting lug of 18,000 lb. Lifting Considerations The minimum length for each lifting lug sling (see slings A and B on Figure 3B.4) is 7' 0" (2.1 m). Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). Adjust the length or elevation of the strap on the quill (sling C) such that the top drive remains horizontal at all times while lifting. See Figure 3B.4. 3-47

Hook 1 Hook 1 SLING A, B TOP LIFTING LUG BOTTOM LIFTING LUG 84 in. [2.1 m] SLING A 18000 lb MAX. SLING B 18000 lb MAX. SLING HALFWAY BETWEEN TOOL JOINT CLAMP AND END OF THE SPINDLE KEEP LIFTING LUG SLING LENGTH 7 FEET (2.1 m) MINIMUM TO AVOID INTERFERENCE BETWEEN SLING AND GUARD 30000 lb STANDARD 750T TOP DRIVE WEIGHT QUILL FULLY DOWN STANDARD 275T Hook TOP 1 DRIVE WEIGHT SLING A SLING B Figure 3B.4: Horizontal Lifting for Balanced Loads Two Hooks (Top Lifting Lugs) 3-48

Case 2: Horizontal Lifting Configuration for Balanced Load Two Hooks (Bottom Lifting Lugs) This lifting configuration considers using two hooks to lift the top drive while it is horizontal. The first hook should align with the location of the top drive bottom lifting lugs (slings A and B) and the second hook (sling C) should align with the point on the quill halfway between the tool joint clamp and end of the spindle. See Figure 3B.5 for reference. This configuration indicates the maximum load on the top drive lifting lugs when lifted while it is horizontal. The top drive should never be higher on the quill side when lifted. Never exceed the maximum safe working load for each lifting lug of 18,000 lb. Lifting Considerations The minimum length for each lifting lug sling (see slings A and B on Figure 3B.5) is 7' 0" (2.1 m). Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). Adjust the length or elevation of the strap on the quill (sling C) such that the top drive remains horizontal at all times while lifting. See Figure 3B.5. 3-49

Hook 1 Hook 1 TOP LIFTING LUG SLING A, B BOTTOM LIFTING LUG 84 in. [2.1 m] SLING A 18000 lb MAX. SLING B 18000 lb MAX. SLING HALFWAY BETWEEN TOOL JOINT CLAMP AND END OF THE SPINDLE KEEP LIFTING LUG SLING LENGTH 7 FEET (2.1 m) MINIMUM TO AVOID INTERFERENCE BETWEEN SLING AND GUARD 30000 lb STANDARD 750T TOP DRIVE WEIGHT QUILL FULLY DOWN Hook 1 SLING A SLING B Figure 3B.5: Horizontal Lifting for Balanced Loads Two Hooks (Bottom Lifting Lugs) 3-50

Case 3: Horizontal Lifting Configuration for Balanced Load One Hook (Top Lifting Lug) This lifting configuration is considering using only one hook to lift the top drive while it is horizontal. In this case, one hook lifts the top drive using three slings (slings A, B, and C). See Figure 3B.6 for reference. This configuration indicates the maximum load on the top drive lifting lugs when lifted while it is horizontal. The top drive should never be higher on the quill side when lifted. Never exceed the maximum safe working load for each lifting lug of 18,000 lb. Lifting Considerations The length for each lifting lug sling (see slings A and B) is 8' 0" (2.4 m). Length for sling C on quill is 10' 11" (3.3 m). See Figure 3B.6 for reference. Adjust the length of sling on quill (sling C) if top drive is not level while lifting. Top drive should be level while lifting. Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). 3-51

Hook Hook SLING A, B 96 in. [2.4 m] TOP LIFTING LUG BOTTOM LIFTING LUG 131 in. [3.3 m] SLING A 18000 lb MAX. SLING B 18000 lb MAX. SLING HALFWAY BETWEEN TOOL JOINT CLAMP AND END OF THE SPINDLE KEEP LIFTING LUG SLING LENGTH 8 FEET (2.4 m) MINIMUM TO AVOID INTERFERENCE BETWEEN SLING AND GUARD 30000 lb STANDARD 750T TOP DRIVE WEIGHT QUILL FULLY DOWN Hook SLING A SLING B Figure 3B.6: Horizontal Lifting for Balanced Loads One Hook (Top Lifting Lug) 3-52

Case 4: Horizontal-to-Vertical or Vertical-to-Horizontal Lifting Configuration As mentioned before, the recommendation is to lift the top drive using the torque guide or shipping skid. In this case, the top drive lifting lugs can be used to maneuver the top drive from horizontal-to-vertical or vertical-to-horizontal position. See Figure 3B.7 for reference. This configuration indicates the total maximum safe working load on lifting lugs at an angle from 0 to 45. See Table 3B.2. Never exceed the maximum safe working load for each lifting lug, see below. Always use both lifting lugs while lifting. Never lift the top drive with only one lug. Lifting Considerations The minimum length for each lifting lug sling is 5' 8" (1.7 m). See Figure 3B.7 for reference. Note: Length given above is overall length, which includes length of sling plus length of any hardware used (i.e., shackles, links, etc.). 3-53

See Table 3B.2 3 15000 lb Max. 2 18000 lb Max. 13000 lb Max. 1 4 11000 lb Max. TOP LIFTING LUG 45 30 15 BOTTOM LIFTING LUG TOP LIFTING LUG See Table 3B.2 45 11000 lb Max. 4 13000 lb Max. 3 30 15 15000 lb Max. 2 18000 lb Max. 1 BOTTOM LIFTING LUG No. Angle Total Maximum Lifting Capacity (Using both Lifting Lugs) 1 0 degrees 36,000 lb (horizontal lifting) 2 15 degrees 3 30 degrees 4 45 degrees 30,000 lb (horizontal-to-vertical or vertical-to-horizontal lifting) 26,000 lb (horizontal-to-vertical or vertical-to-horizontal lifting) 22,000 lb (horizontal-to-vertical or vertical-to-horizontal lifting) Table 3B.2 Total Maximum Lifting Capacity Figure 3B.7: Total Lifting Capacity (per lifting lug) 3-54