Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

Similar documents
Milton Road Project Update. Paul van de Bulk 30 January 2018

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Design Workshops Summary of all Feedback January 2017

MILTON ROAD LLF PROJECT UPDATE

Cycle Track Design Best Practices Cycle Track Sections

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Welcome. If you have any questions or comments on the project, please contact:

2.0 LANE WIDTHS GUIDELINE

MARKHOUSE ROAD IMPROVEMENTS

CURBSIDE ACTIVITY DESIGN

Southside Pilot Proposal

ACCESSIBLE LOADING ZONES AND PROTECTED BIKE LANES: A UNIVERSAL DESIGN APPROACH. Accessibility Coalition Dec. 2016

10.0 CURB EXTENSIONS GUIDELINE

Maynooth Cycling Submission on North South Corridor

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Columbia Pike Implementation Team (CPIT) Meeting

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

How do we design for pedestrians? Case study: transforming the Walworth Road

ENFIELD TOWN THE REVISED DESIGN

Bicycle Network Submission

Marcus Jones, TRL. Presented by Name Here Job Title - Date

College Green traffic management changes

Transportation Planning Division

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Joe Routt Boulevard. Access Design Options

DRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council

4. Guided Bus Explained

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

The minutes of the meeting held on Tuesday 13th June 2017 were agreed as a correct record. There were no matters arising.

Bicycle/Bus Conflict Area Study

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June

2. Context. Existing framework. The context. The challenge. Transport Strategy

Chelmsford City Growth Package

Road Improvement Consultations Huntingdon Road

Background. Caversham a vision for the future. Joint public meeting arranged by:

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

Urban Street Design and Development

TRANSPORT AND MOVEMENT

guide to a phased approach TRIPP

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Lawrence Avenue Streetscape Concepts August 30, 2011

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

The Greater Cambridge City Deal

ECONOMY PEOPLE ENVIRONMENT

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

Nottingham Cycle City Frequently Asked Questions

BYRES ROAD: PUBLIC REALM Public Consultation

Chapter 4 - Links Within the Highway. Suitability of Routes

Easton Safer Streets - Final Project Report BRISTOL

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Road Diets FDOT Process

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Dodder Greenway Emerging Preferred Route Consultation - October 2018

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Perne Rd / Radegund Rd Roundabout Cambridge

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

European Student Competition VOICE Vulnerable Road Users Organizations in Cooperation Across Europe

CAMBRIDGE SOUTH WEST PARK & RIDE

The Consultation has now ended.

Oxford Street West. 21 December

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Report on MEPS Přerov TH MIDDLE EUROPEAN PROJECT SEMINAR LAURA ENJUANES NOGUERO E

West Midlands Cycle Design Guidance Cycling and the Midland Metro

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65%

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

Report from Embassy Visit to Copenhagen May David Arditti

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY

What Is a Complete Street?

Traffic Safety Plan Second Avenue

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

Cycling and risk. Cycle facilities and risk management

El Centro Mobility Hub

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A65 TRANSPORT ASSESSMENT. 13 th May 2005

Side Roads and Other Non-Signalised Junctions

Topic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Cambridge Cycling Campaign

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

Monroe Street Reconstruction

(HIGHWAY GEOMETRIC DESIGN -1)

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Bus Lane Laws. What happens if you have to go into a bus lane? Bus lanes. Penalties of using bus lanes. When can you use them? Who can use them?

Cyclists at road narrowings

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Appendix 11 Barton Greenway Review

Transcription:

Bus Stop and Crossings Workshop WSP 19th September 2017

Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower sections of Milton (3.5m to 4.5m width) (b) Ranking preference between 6 possible bus stop designs on the wider sections of Milton (4.5m to 6m width) Task 2: Based on location plans of the Final Design Concept for Milton : Identify preferred locations for bus stops and crossings along Milton Provide reasons to facilitators for decisions on locations (for example closeness to local school etc)

Task 1: Bus Stop Design

Key Considerations of Bus Stop Designs Pedestrians Cyclists Bus Users Buses General Traffic Most Vulnerable Users Want to be in free flow and not interrupted Want to have free movement and no interruptions Need to not be in conflict with bus uses and pedestrians Least vulnerable of users when not on highway Need a safe place to wait Potential to conflict with cyclists both when waiting and loading/ unloading from buses Disability considerations for loading and unloading Need a clear marked bus stop Minimise dwelltime Need to Easily be able to re-join traffic if not in bus lane Need to ensure no conflict with cyclists Wish for free flow traffic Wish to not be obstructed by Bus However.likely to be impacted. Least important user of Milton scheme

Bus Stop Options: Shared Use Arrangement Design Option Considerations: Shared surface for cycle, ped and bus users. No one user type has priority Coloured and textured surfaces to make users aware they are entering a shared space Most common design and therefore people have experience of being in this situation elsewhere in Cambridge Simplest design and can be accommodated on both narrow and wider sections of Milton road

Bus Stop Options: Segregated Use Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space Coloured and textured surfaces to make users aware that bus users have priority over cycle lane when alighting/boarding bus Only possible to deliver in wider sections of Milton Cambridge example can be found on Huntingdon

Bus Stop Options: Floating Bus Stop Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space Cycle users have priority in cycle lane so bus users need to check and give way when alighting bus and crossing to pavement Not felt to be so user friendly for those with disabilities Only possible to deliver in wider sections of Milton Cambridge example can be found on Hills

Bus Stop Options: Partial Layby Design Option Considerations: Shared surface for cycle, ped and bus users. No one user type has priority Coloured and textured surfaces to make users aware they are entering a shared space Partial Layby enable express buses and cars to pass the bus while it is stopped while also enabling the bus to easily re-join the traffic Can be accommodated both narrow and wider sections of Milton road Main additional benefit is for general traffic and other buses passing

Bus Stop Options: Cyclists Give Way to Pedestrians Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space. However potential conflict point at cross over. Pedestrians have priority over cyclist at cross over point Need to be mindful of potential safety issues of moving cycle lane to back of highway boundary if driveways are present Can be accommodated both narrow and wider sections of Milton road

Bus Stop Options: Pedestrians Give Way to Cyclists Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space. However potential conflict point at cross over. Cyclists have priority over pedestrians at cross over point Need to be mindful of potential safety issues of moving cycle lane to back of highway boundary if driveways are present Can be accommodated both narrow and wider sections of Milton road

Indicative Bus Stop Shelter designs in Cambridge

Task 2: Bus Stop & Crossing Locations

Bus Stop Locations Identify preferred locations for bus stops and crossings along Milton Provide reasons to facilitators for decisions on locations (for example closeness to local school etc) To assist group discussions the current locations and Do Optimum suggested locations of crossings and bus stops will already be shown on the plan. Are the locations suggested in the Do Optimum still the preferred in the context of the Final Concept Design?

Bus Stop Locations: Table Location Plans Explained BUS STOP LOCATION PROPOSED IN THE DO OPTIMUM DESIGN

Crossing Location Considerations: If the suggestion is for a new crossing rather then the shifting of location of an existing crossing, what is the need for this crossing? Where is the demand for this crossing coming from? Can a new crossing be justified? Crossings should be a maximum of 50m away from a bus stop Crossings should never be placed directly in-front of a bus stop Consider existing driveways that are marked on the plan. Given peak traffic flow all crossings will be signal Toucan Crossings Consider how having a signal crossing can give benefits to traffic leaving busy side streets when they are red, giving a gap in main flow traffic on Milton

TOUCAN Crossings Explained