CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Similar documents
Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Prince George s County plans, policies, and projects

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

PRESS RELEASE San Joaquin Council of Governments

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Council Agenda Report

Active Transportation Facility Glossary

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Henderson Ave. Complete Streets Project

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

IBI Group November 5, 2012

Tonight is for you. Learn everything you can. Share all your ideas.

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Existing Pedestrian Conditions. PSAC February 8, 2011

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Appendix D: Planning Level Cost Calculator

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Transportation Planning Division

Omaha s Complete Streets Policy

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Freeway ramp intersection study

El Paso County 2040 Major Transportation Corridors Plan

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Perryville TOD and Greenway Plan

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Bicycle Facilities Planning

Columbia Pike Implementation Team (CPIT) Meeting

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Executive Summary Route 30 Corridor Master Plan

Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington. Next Steps Memorandum September FINAL

Item No. 14 Town of Atherton

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Presentation Starts at 5:30 PM

Draft North Industrial Area-Wide Traffic Plan

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

Ocean Park Boulevard Green Street Project Community Workshop

Environment and Public Works Committee Presentation

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Pre-Construction Meeting

Public Workshop #2. September 14, 2016

Citywide Sidewalk and Crosswalk Programs

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

NJDOT Complete Streets Checklist

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

Roosevelt Estates Neighborhood Improvements

COMPLETE STREETS PLANNER S PORTFOLIO

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

CHAPTER 3: Vision Statement and Goals

Fort Defiance Industrial Area Traffic Circulation Study Task Assignment MPD

Trial Restriping Project. October 21, 2010

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

City of Seattle Edward B. Murray, Mayor

Welcome. If you have any questions or comments on the project, please contact:

F L E T C H E R A V E N U E

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

City of Birmingham Draft Multi-modal Transportation Plan

Broad Street Bicycle Boulevard Design Guidelines

Foothill Expressway Improvements Between El Monte and San Antonio

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

1.0 EXECUTIVE SUMMARY

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b)

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Why invest in the 1 Street S.W. Corridor?

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

What Is a Complete Street?

Knox Street Complete Streets Project

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

MASTER BICYCLE AND PEDESTRIAN PLAN

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Wood and Cortland Neighborhood Greenways

COMMUNITY MEETING AGENDA

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Solana Beach Comprehensive Active Transportation Strategy (CATS)

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Design Guidelines. Overview. Design Vision for Yellow Brick Road

N. Frederick Street to N. Manchester Street

North Shore Transportation Improvement Strategy

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Transcription:

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans, Michael Baker International, and North Coast Engineering Funded by a Caltrans Sustainable Transportation Planning Grant

AGENDA 2 6:30-6:40 Open House 6:40-6:50 Introduction by Mayor Martin, introduce staff and consultant team 6:50-7:00 Review May Weeklong Outreach Event 7:00-7:10 Review Alternatives from May Open House 7:10-7:40 Review Preferred-Preliminary Plan Details 7:40-7:55 Break to Review Design Prints 7:55-8:00 What s next? 8:00-9:00 Public questions/comments 9:00 Adjourn

PROJECT BACKGROUND 3 study funded through Caltrans Sustainable Transportation Planning grant study area includes Creston Road between S River Road and Niblick Road (1.9 miles) will utilize a public process that engages residents, property owners, and other stakeholders (schools) plan will address safety, access, and mobility for all modes of transportation including walking, bicycling, transit, and motor vehicles

STUDY AREA Creston Road (1.9 miles) South River Road to Niblick Road 4

COMPLETE STREETS safe, comfortable, convenient 5 whether you re cycling, driving, walking, or taking transit

COMPLETE STREETS safe, comfortable, convenient 6 whether you re an older adult, disabled, or young

PROJECT SCHEDULE 7 May 8-11 Weeklong community engagement events September 27 Present preferred alternative to community January 2018 Final Plan

COMMUNITY ENGAGEMENT 8

WEEKLONG COMMUNITY ENGAGEMENT overview of engagement events May 8-11 9 Two Community Workshops Three Stakeholder Meetings Temporary Pop- Up Installation at Lewis Middle School Walkability Assessment Open Studio Hours

WEEKLONG COMMUNITY ENGAGEMENT walkability assessment 10

WEEKLONG COMMUNITY ENGAGEMENT opening community workshop 11

WEEKLONG COMMUNITY ENGAGEMENT opening community workshop 12 vision Fresh pavement and striping Free/smooth traffic flow with least amount of barriers or obstacles possible Adequate capacity to handle current and future traffic 2 lanes of travel in each direction Safe crossings and signals for pedestrians Continuous sidewalks on both sides Bike lanes on both sides More trees

WEEKLONG COMMUNITY ENGAGEMENT opening community workshop 13 values Family-Oriented Sense of Community Wine and Weather Accessible Small Rural Town Amenities History

WEEKLONG COMMUNITY ENGAGEMENT stakeholder meetings 14 Lewis Middle School leadership class

WEEKLONG COMMUNITY ENGAGEMENT pop-up installation 15

WEEKLONG COMMUNITY ENGAGEMENT open studio hours 16

WEEKLONG COMMUNITY ENGAGEMENT closing workshop 17

SUMMARY OF DEVELOPED ALTERNATIVES 18

SUMMARY OF DEVELOPED ALTERNATIVES three alternatives 19 A Three-Five B Five-Five C Just Pave It (+)

SUMMARY OF DEVELOPED ALTERNATIVES the three-five 20 A Three-Five Five lanes from S River to Elm Three lanes from Elm to Rolling Hills Five lanes from Rolling Hills to Niblick Protected Bikeways Medians where feasible Install sidewalks where gaps exist Widen sidewalks at school locations Enhanced crosswalks at uncontrolled locations

SUMMARY OF DEVELOPED ALTERNATIVES the three-five 21 A Three-Five Five lanes from S River to Elm Three lanes from Elm to Rolling Hills Five lanes from Rolling Hills to Niblick Protected Bikeways Medians where feasible Install sidewalks where gaps exist Widen sidewalks at locations Enhanced crosswalks at uncontrolled locations

SUMMARY OF DEVELOPED ALTERNATIVES the five-five 22 B Five-Five Five lanes through entire corridor Bike lanes Install sidewalks where gaps exist Enhanced crosswalks at uncontrolled locations

SUMMARY OF DEVELOPED ALTERNATIVES the five-five 23 B Five-Five Five lanes through entire corridor Bike lanes Install sidewalks where gaps exist Enhanced crosswalks at uncontrolled locations

SUMMARY OF DEVELOPED ALTERNATIVES just pave it (+) 24 C Just Pave It (+) Lanes remain as-is on corridor Existing bike lanes to remain Install sidewalks where gaps exist Upgraded signage

WEEKLONG COMMUNITY ENGAGEMENT results of polling 25 7 7 A 56% B 22% C 22% 18 18/32 7/32 7/32

A WEEKLONG COMMUNITY ENGAGEMENT results of polling 26 Improvement Positive Against Total 1. Restripe from 2 Lanes to 3 Lanes 11 0 11 2. Traffic Signal at Walnut 10 0 10 3. Flashing Beacon and Curb Extensions at Trigo 2 0 2 4A. Striped Buffered Bike lanes 4 0 4 4B. Protected Bikeways 6-12 -6 5A. Flashing Beacon and Median at Ivy 1 0 1 5B. HAWK Signal at Ivy 1 0 1 6. Wider Sidewalk in School Areas 3 0 3 7. Flashing Beacon and Median at Orchard 1 0 1 8. Connect Centennial Trail to Schools 4 0 4 9. Create Trail between Rolling Hills and Centennial Trail 3-1 2 10A. Traffic Signal at Rolling Hills 0-2 -2 10B. Roundabout at Rolling Hills 14-5 9 11. Landscaping on Existing Medians 1-1 0 12. Expand to 5 Lanes south of Lana 2-1 1

B WEEKLONG COMMUNITY ENGAGEMENT results of polling 27 Improvement Positive Against Total 13. Widen Capital Hill Area to 5 Lanes 14. Maintain Existing Striped Bike Lanes 15. Traffic Signal at Walnut and Realign with Bolen 16. HAWK at Trigo 17. HAWK at Ivy 18. Widen School Zone Segment to 5 Lanes 19. HAWK at Orchard 20. Traffic Signal at Rolling Hills 21. Widen section south of Lana to 5 Lanes 0 0 0 3 0 3 0-3 -3 6 0 6 0 0 0 2-1 1 0 0 0 1 0 1 2 0 2

C WEEKLONG COMMUNITY ENGAGEMENT results of polling 28 Improvement Positive Against Total 22. Keep Existing Lanes 23. Maintain Existing Bike Lanes 24. Traffic Signal at Walnut 25. Flashing Beacon at Trigo 26. HAWK at Ivy 27. Traffic Signal at Rolling Hills 0-1 -1 2 0 2 1-1 0 0 0 0 0 0 0 3-1 2

COMMUNITY PREFERRED ALTERNATIVE 29

30 COMMUNITY PREFERRED ALTERNATIVE

31 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 32

33 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 34

COMMUNITY PREFERRED ALTERNATIVE 35

COMMUNITY PREFERRED ALTERNATIVE 36

COMMUNITY PREFERRED ALTERNATIVE 37

COMMUNITY PREFERRED ALTERNATIVE 38

39 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 40

COMMUNITY PREFERRED ALTERNATIVE Walnut Drive Realignment Alternative 41

COMMUNITY PREFERRED ALTERNATIVE 42

43 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 44

COMMUNITY PREFERRED ALTERNATIVE 45

46 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 47

COMMUNITY PREFERRED ALTERNATIVE 48

49 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 50

51 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 52

COMMUNITY PREFERRED ALTERNATIVE 53

COMMUNITY PREFERRED ALTERNATIVE 54

55 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 56

COMMUNITY PREFERRED ALTERNATIVE 57

COMMUNITY PREFERRED ALTERNATIVE 58

59 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 60

COMMUNITY PREFERRED ALTERNATIVE 61

62 COMMUNITY PREFERRED ALTERNATIVE

COMMUNITY PREFERRED ALTERNATIVE 63

64 COMMUNITY PREFERRED ALTERNATIVE

EXISTING CONDITIONS cross-section view looking eastbound at Shannon Hill Road 65

COMMUNITY PREFERRED ALTERNATIVE cross-section view looking eastbound at Shannon Hill Road 66

EXISTING CONDITIONS cross-section view looking westbound at Ivy Street in front of Lewis Middle School 67

COMMUNITY PREFERRED ALTERNATIVE cross-section view looking westbound at Ivy Street in front of Lewis Middle School 68

EXISTING CONDITIONS cross-section view looking westbound at Creston Road and Rolling Hills Road 69

COMMUNITY PREFERRED ALTERNATIVE cross-section view looking westbound at Creston Road and Rolling Hills Road 70

EXISTING CONDITIONS cross-section view looking northbound at Pifer Elementary School 71

COMMUNITY PREFERRED ALTERNATIVE cross-section view looking northbound at Pifer Elementary School 72

COMMUNITY PREFERRED ALTERNATIVE results of traffic analysis 73 Acceptable intersection operation with preferred alternative Including the roundabout at Rolling Hills Decreased delay at stop-controlled side streets with the center turn lane Pedestrian crossing volumes accommodated at uncontrolled crossings: high-visibility crosswalk Median Curb extensions Flashing beacons (RRFB)

COMMUNITY INPUT ACTIVITY 74

COMMUNITY INPUT ACTIVITY 75