Public Meeting #6 Buffalo Niagara Medical Campus Phase III Allen Street Extension Project D Youville College Center February 21, 2018
PHASE A - PROGRESS The Pathway design extends from Washington Street to Ellicott Street, including the traffic signals at each intersection. The design aims to provide a more inviting and safer pathway from Washington Street to Ellicott Street. The new University at Buffalo School of Medicine and Biomedical Sciences (UB SMBS) building has an open walkway through the ground floor that connects Washington Street to Main Street. The Pathway includes a creative mix of design features, including pieces from the Allen Street and the Ellicott Street designs in an effort to create a connective pathway within the campus.
PHASE A - LIMITS
PHASE A - CONCEPT
PHASE A - SIMULATION
PHASE B - PROGRESS The remaining funding is being used to fund the reconstruction of Allen Street. Phase B is currently funded from the west side of Main Street to the west side of Delaware Avenue along Allen Street. The Allen Street design features a flexible design with moveable bollards allowing the roadway to transition from parking on both sides to a wider sidewalk zone by eliminating parking on both sides of the roadway throughout the corridor.
PHASE B - LIMITS
PHASE B - APPROVED CROSS SECTION The cross section incorporates the comments heard from the public during the five public involvement meetings: 1. Shared-Use Lanes (Sharrows) as Bicycle Facilities 2. Maintains Two-Way Traffic Flow with Acceptable Vehicle Operations 3. Flexibility for Enhanced Pedestrian Zones with Moveable Bollards 4. Retains Parking Lanes on Both Sides of Allen Street
PHASE B - APPROVED CROSS SECTION
PHASE B - APPROVED CROSS SECTION
Colored Concrete Palette Benches Lighting Movable Bollards Dual Trash/Recycle Receptacles Bike Racks Street Signs Tree & Planting Types Wayfinding Sign Public Art Transcendence Street Wording
Colored Concrete Palettes (Test Panels Poured During Construction for Community Feedback) Parking Features Sidewalks Color Palette 1 Color Palette 2 Parking Features Sidewalks
Colored Concrete Palette 1
Colored Concrete Palette 2
Benches
Lighting
Removable Bollards Color: Dark Grey
Dual Trash/Recycle Receptacles Similar Example
Bike Racks
Street Signs
Tree & Planting Types Chokecherry Flowering Crabapple American Hornbeam Amur Maackia
Tree & Planting Types Serviceberry Butterfly Bush Cherry Accolade New Jersey Tea Bush Honeysuckle
Wayfinding Sign Customized panels for Allentown to be supplied
Wayfinding Sign Location Proposed Wayfinding Sign at SW Delaware & Allen
Public Art Transcendence
Public Art Transcendence
Public Art Transcendence and Wayfinding Sign Locations
Street Wording
SCHEDULE Bid Ready Plan Set (PS&E): Anticipated Mid-March 2018 Bid Opening: Anticipated May 2018 Construction Begins: Anticipated July 2018
THANK YOU! For additional information or questions: KELLY M. THOMPSON, PE 40 LaRiviere Drive, Suite 150 Buffalo, NY 14202 Email: KMThompson@bergmannpc.com Phone: (716) 710-3951