SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL

Similar documents
Florida Building Code Review Checklist

Advanced Code Requirements for Residential Construction Internet Course

Tampa: Davis Islands Recreation Area

COTTAGES AT OVERBROOK THE 'ROWLEY'

Unit # ± 5,514 SF Width ± 85' Depth ± 68' Plans produced by: ID Plans 10/12/2016 (813)

ACCESSIBILITY CHECKLIST

ADA COMPLIANCE CHECKLIST (RESTAURANT) Meet Fail N/A. Parking Lot

Circular Turning Space. 8 Significant Changes to the ICC A

PUBLIC SPA CHECKLIST. Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1

ADA Library Accessibility Checklist

PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL PMH. PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014

RESIDENTIAL BUILDING PLAN REVIEW CHECKLIST

City of Los Angeles Department of Building & Safety Disabled Access Section Supplemental Plan Review Checklist No. 8 RECREATION FACILITIES

REVIEW OF ACCESSIBILITY FEATURES

Welcome to the AccessibilityOnline Webinar Series

Pool Guide. Life Safety Inspections

SCHEDULE OF FEES AND DEPOSITS

Swimming Pool Requirements

newly constructed and altered recreation facilities guidelines for newly constructed and altered buildings and facilities subject to the ADA.

MSC Guidelines for Review of Emergency Evacuation Plans (NVIC 8-93)

Babe Ruth Softball Divisions Facilities Planning Guide. Field Layout Checklist General Considerations Tournament Considerations

Wall Bracing Examples: Building #1 One-Story

ARCHITECTURAL GUIDELINES FOUR-PIECE COMMERCIAL

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Starr Mier-Whiting, Realtor 448 Teryl Road #4. 2/2 condo, furnished, golf course view. Royal Shell Realty.

Area of existing house. Gross Flr. area excluding parking. (+1,657 basement) Gross Flr. area inc. covered parking & accessory bldg.

PUBLIC POOL CHECKLIST. (This checklist is based on the Ministry of Municipal Affairs and Housing checklist)

237 Palm Drive second floor. 2/2, furnished. Special assessment , for golf course is paid in full.

WORKPLACE SAFETY INSPECTIONS TABLE OF CONTENTS INTRODUCTION...2 OBJECTIVE...2 REFERENCES...2 PREREQUISITES...2 PRECAUTIONS...2 CHECKLISTS...

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

FALL PROTECTION

V IL L A G E L A K E S I D E

UPDATE ARLINGTON COUNTY. Bicycle Parking Standards

ARCHITECT GUIDELINES 1000 T

Stadium/Athletic Improvements Update October 12, 2015

Facility Condition Assessment Report

ADA Access Standards for Swimming Pools, Wading Pools, and Spas

New High School #6. Schematic Design Presentation. Killeen Independent School District \\ Killeen, Texas. October 09, 2018

The Public Safety Complex Southampton MA. a critical time

RESIDENTIAL SWIMMING POOLS INFORMATION CHECKLIST

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

NEW ZEALAND BUILDING CODE. In relation to Tredsafe

Recreational Camp Emergency Plans for Incidents and Natural Disasters

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

In order to save your time please consider these questions before you complete the application form:

INTEGRATED ACCESSIBILITY STANDARDS REGULATION. Training Module for the Design of Public Spaces Standard

Policy 1136: Unclaimed Personal Property

ARCHITECTURAL GUIDELINES ONE-PIECE COMMERCIAL

Regulation SUPPORT SERVICES January 28, 2015 SUPPORT SERVICES. School Bus Safety Programs. I. Requirements

Cape Cod Community College Studio Theatre Approved Seating & Stage Configurations Tilden Arts Center, Lower Level West Barnstable, Massachusetts

Baseball Stadium Renovations at US Cellular Field

There is no place like PEACE RHYTHM

General Safety and Health Provisions for Construction Self Inspection Checklist

Walking-Working Surfaces

Location: Cariboo, One Hundred Mile House, Cariboo Chilcotin Coast - Provincial : Park (Heritage Discovery Circle Route)

Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone

Florida Building Code 6 th Edition (2017) Residential. Broward County Edition Loose-leaf Supplement

CURRENT ADA AND ICC COMPLIANCE DATA AN INTRODUCTION TO BOBRICK S ADA- COMPLIANT PRODUCTS, AS WELL AS BASIC MOUNTING HEIGHTS AND REACH RANGES

ADA STANDARD OVERVIEW AND SPEAKMAN APPLICABLE PRODUCTS

Section 6. Off-street Bicycle Space Regulations

BRANDING OPPORTUNITIES AND GUIDELINES

SAFETY PROGRAM MANUAL INJURY & ILLNESS PREVENTION PROGRAM

Golf Minimum Standards Criteria

HOA Specifications and User Guidelines for Hot Tubs at WW3HOA

Accessible Swimming Pools and Spas

Laboratory Ventilation. Environmental, Health, and Safety

INGROUND OR ABOVE GROUND POOL. APPROVALS REQUIRED (Check here if): Well Septic

Applying Construction Fall Protection Concepts to General Industry

22'-9 1/2" 6.94 m. 48'-10" m TEACH TOT POOL. POOL AREA = ±3845 ft². 35'-1 1/2" m BEACH ENTRY MINI SPLASH PAD = ± 475 SF. 16'-0 1/2" 4.

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline

HAZARD ASSESSMENT FOR ORANGE COUNTY SCHOOLS

Hazard Injury Who at Risk Existing Control Measures Risk Score Further Control Measures Needed

Adams McGillan. Craig Cottage 451 Seacoast Road Magilligan BT49 0LL. Offers Around 149,950. Telephone

THE EAGLE CREEK PLAN BN-1B W/BASEMENT

n Spring Euro 8,00 - US $ 16,50-7,30

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

1.3 Pedestrian Environments

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:

BATHS SHOWERS WALK-IN TUBS

IBC: 404.1, 404.9, , , , , , TABLE

WITTICH HALL RENOVATION

ACCESSIBILITY CHECKLIST

Regarding the code-compliance of sliding doors that form part of a barrier to a pool at 148 Glenbrook Road, Pukekohe

dpd Seattle Permits Tip Getting a Grip on Handrails PURPOSE OF HANDRAILS

Welcome to Flagler Beach, Florida!

WAC A A Exit doors.

$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.

THE TLC COMPANIES. Self Inspection Program. Self Inspection. Program. Revised 12/13/2002 DC00026

Town of Wells Vehicle Bid Package

the Professional Range of Baths An integrated range designed specifically to assist bathing in hospitals, care homes and at home

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

Facility Assessment David R. Johnson Memorial Pool 100 D Street Roseville, CA

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

CTC Area of study Climbable Guards 2007/2008 Code Changes SECTION GUARDS

ARCHITECTURAL GUIDELINES 1000 S

Pool Safety Assessment

Subparts D and I Walking-Working Surfaces & Personal Protective Equipment Final Rule

Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL

Transcription:

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm PROJECT NAME: DATE PROJECT NUMBER: REVIEWER The intent of this checklist is to act as a tool for the District Plan Reviewers to review construction plans and specification of projects submitted for permitting by the Building Department. Architects and Engineers are encouraged to use this document as a tool to prepare construction plans and specifications for District projects. The codes references in the checklist are the Florida Building Code (FBC), District Design Criteria (DDC), District Design Criteria (DDC), National Fire Prevention Association Codes (NFPA), Florida Administrative Code (FAC), and Florid Fire Prevention Code. Phase I Schematic Design Site Plan Floor Plans Public Shelter (If Applicable) Life Safety Plan & Code Summary 208a Facility Space Chart FBC 423.8.2 Demolition Plan (If Applicable) Construction Phasing Plan (If Applicable) Scope Of Work & Narrative Cover Sheet Phase II Design Development Site Plan Landscaping Plans Floor Plans Public Shelter (If Applicable) Furnishing Layouts Plumbing fixture locations and fixture unit calculations Life Safety Plan & Code Summary Exterior Elevations (Minimum of three per building) Typical Building Sections Outlined Specifications 208a Facility Space Chart FBC 423.8.2 Demolition Plan (If Applicable) Construction Phasing Plan (If Applicable) Cover Sheet 7/1/04 Architectural Page 1 of 1

ARCHITECTURAL "Phase III" Plans (Final Construction Documents) General Plans, Specs & Documentation are signed and sealed. Required Documentation: Permit Application with required information Site Plan approved by FAHJ ECO Certification for modernizations Completed Specifications Completed Drawings Product approvals: Windows Skylights Exterior Doors Shutters Roofing Panel Walls Structural Components New and innovative building envelope products Shop Drawings: Bleachers, grandstands, and prefabricated press boxes Alum. Canopies Fire Alarm and smoke detection system s which deviate from construction documents or district standards 471, 481 FS FBC 104.1.5; 104.1.10; 104.2.1; 104.3.1.1 FBC 104.3.1 FBC 104.3.1 Dated Tabular Index OF Drawings represents what is submitted FBC 104.2.1 Plans match the specifications FBC 104.2.1 Plans comply with the District Design Criteria (DDC) Plans comply with the Building Department s Construction Plan Management Guidelines Occupancy Classification Determine Occupancy Classification FBC 306.1.1; 423.8.1.1 Identify Group A Assembly Occupancy Areas. FBC 306.1.3; 423.18 Public Education Occupancies shall comply with Section 423. FBC 306.1.5 Verify if there are any courtyards FBC 423.5.5 Exterior Courtyard FBC 423.5.5.1 Enclosed Courtyard FBC 423.5.5.2 Roofed Courtyard FBC 423.5.5.3 7/1/04 Architectural Page 2 of 2

Section 423 State Requirements For Educational Facilities Reuse and prototype plans shall be code updated with each new project. FBC 423.3.8 Verify occupancy during construction and provide Safety Plan FBC 423.6.1 Life safety FBC 423.7 General requirements for new construction, Additions, Renovations and Remodeling FBC 423.8; 601.2.1 Site requirements FBC 423.10 Fire-retardant treated wood FBC 423.11 Roofing FBC 423.12 Doors and windows FBC 423.13 Special safety requirements FBC 423.14 Mechanical FBC 423.15 Plumbing FBC 423.16 Electrical FBC 423.17 Shade and green houses FBC 423.19 Storage FBC 423.20 Child care/ Pre-K Facilities FBC 423.21 Clinics FBC 423.22 Kilns FBC 423.23 Open plan schools FBC 423.24 Public Shelter Design Criteria FBC 423.25 Time-out rooms FBC 423.26 New relocatable buildings FBC 423.27 Existing relocatable buildings and factory built schools. FBC 423.28 General Building Limitations Verify building height and area FBC Table 500 Verify height modifications FBC 503.2 Verify area modifications FBC 503.3; 503.4 Verify buildings located on the same lot FBC 504 Verify minimum Type Of Construction FBC 423.8.3; 601.2.1 Verify Fire Resistance Ratings Table 600 Fire Resistant Materials and Construction Verify occupancy separation requirements. FBC Table 704.1 Verify fire resistance rating of exit access corridors. FBC Table 704.2.4 Verify minimum fire resistance of walls, partitions, and opening protectives. FBC Table 705.1.2 7/1/04 Architectural Page 3 of 3

Interior Finishes Verify interior finish requirements FBC 803.3 Means Of Egress or Accessibility Code Verify accessible spaces and exceptions FBC 11-4.1; 11-4.2 FBC 11-4.1.2; Verify site accessibility 11-4.1.3(1); 11-4.1.3(9); 11-4.3; 11-4.6; 11-4.7; 11-4.29 Verify protruding objects FBC 11-4.1.3(2), 11-4.4 Verify ground and floor surfaces FBC 11-4.1.3(3), 11-4.5 Verify ramps FBC 11-4.8 Verify stairs FBC 11-4.1.3(4); 11-4.9 Verify elevators FBC 11-4.1.3(5); 11-4.10 Verify platform lifts FBC 11-4.11; 11-4.27 Verify doors FBC 11-4.1.3(7); 11-4.13; 11-4.22.2; 11-4.23.2 Verify entrances FBC 11-4.1.3(8); 11-4.14 Verify fountains and water coolers FBC 11-4.1.3(10); 11-4.15 Verify water closets 11-4.16 Verify toilet stalls 11-4.17; 11-4.22 Verify urinals FBC 11-4.18; 11-4.22.5; 11-4.23.5 Verify lavatories and mirrors FBC 11-4.19; 11-4.23.6 Verify bathrooms, bathing facilities and shower rooms. 11-4.21; 11-4.23 Verify sinks FBC 11-4.24 Verify storage FBC 11-4.1.3(12); 11-4.25 Verify handrails, grab bars and tub and shower seats. FBC 11-4.26 Verify controls and operating mechanism FBC 11-4.1.3(13); 11-4.27 7/1/04 Architectural Page 4 of 4

Verify alarms FBC 11-4.1.3(14); 11-4.28 Verify signage FBC 11-4.1.2(7); 11-4.1.3(16); 11-4.30 Verify public telephones FBC 11-4.1.3(17); 11-4.31 Verify fixed or built in seating and tables FBC 11-4.1.3(18); 11-4.32 Verify Assembly Areas FBC 11-4.1.3(19); 11-4.33 Verify dressing and fitting rooms FBC 11-4.1.3(21); 11-4.35 Verify Library Areas FBC 11-8. or Plumbing Systems Verify number of plumbing facilities FBC Table 403.1 or Fire Marshal Rule 4A-58 Not covered by FBC or Specifications Specifications follow the District Master Specs guidelines. Specifications match the plans. Specifications follow the District Design Criteria. Specifications follow the Educational Specifications. Specifications include a Title Page and statement of compliance, Table of contents with Drawing Index, Invitation, Advertisement and Instructions to Bidders, Bonding & Insurance requirements, General & Supplementary Conditions, and Addenda. 7/1/04 Architectural Page 5 of 5