Thesis Proposal. Table of Contents. Executive Summary...2. Analysis 1 Joint Ventures...3. Analysis 2 LEED Improvement (Breath Topic)...

Similar documents
Technical Report 1. Construction Project Management

Governance and Priorities Committee Report For the July 2, 2015 Meeting

TARGET FIELD HOME OF THE MINNESOTA TWINS FUNDING INFORMATION BRANDON YOPP

Report to Cabinet. 18 May 2016

ADVANCING NATURAL GAS IN THE MULTIFAMILY BUILDINGS MARKET

Attachment A: Columbus Area Metropolitan Transportation Plan Objectives, Performance Measures, and Targets

CONGESTION AROUND THE WORLD

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

World's No. 1 Conference for Leaders of Tournaments, Leagues and Clubs in Youth and Amateur Team Sports.

Point Defiance Park. Master Plan

Priced Managed Lanes in America. October 2013

Table of Contents. Our Mission & Vision

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

South King County High-Capacity Transit Corridor Study

Roundabouts The Virginia Experience

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

Public Information and Participation Comments

MEMORANDUM. Mayor and City Council. Ashley Perl, Climate Action Manager. Barry Crook, Assistant City Manager. DATE OF MEMO: December 8, 2017

The Standard In-Class Essay Outline: Consider one major topic spread over 3 paragraphs or 3 separate examples, one per BP. INTRO. PARA.

122 Avenue: 107 Street to Fort Road

the Story of the 30s & 70s Bus Lines James Hamre - WMATA

A national cycling strategy for more and safer cycling

Traffic Control: An Overview. May 2016

Work Zone Traffic Safety

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

National Safe Routes to School Program: Initial Results

RECRUITMENT HUNTERS A case-study approach to learning more about hunting among Hispanics and improving recruitment and retention of other hunters

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

NACTO Designing Cities Conference Project Evaluation: Tools for Measuring Success and Building Support. October 29, 2015

Kentucky s Surface Transportation System

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

U.S. Bank Stadium Media Overview

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 25, 2016

Thank you for attending

Baseball Stadium Renovations at US Cellular Field

BC Games Society 2016/ /19 SERVICE PLAN

I-95/Temple Avenue Improvements Project Colonial Heights, VA

Ballpark-Related Development

May 23, 2018 Proposed No.:

Performance Criteria for 2035 Long Range Transportation Plan

REQUEST FOR PROPOSALS Race Coordination and Event Timing for 5K Race and Children s Fun Run

CITY OF KINGSTON INFORMATION REPORT TO ENVIRONMENT, INFRASTRUCTURE & TRANSPORTATION POLICIES COMMITTEE Report No.: EITP

REDUCING ACCIDENTS MEANS SAVING LIVES.

ARTBA Roadway Workzone Safety Conference December 4, 2002 Orlando, Florida

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

Kentucky Lock Project Update Inland Waterways Users Board

Willingness to Pay for Bike Detection Safety Systems: a European study

White Paper. Chemical Sensor vs NDIR - Overview: NDIR Technology:

1. The Standard In-Class Essay Outline: Consider one major topic spread over 3 paragraphs or 3 separate examples, one per BP.

Take the Bus. Project Proposal AUSTRALIA. Bus Industry Confederation. Take the Bus. Bus Australia Network WARTA. BusS. Bus & Coach Association SA

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Pennsylvania Avenue (CR 484) Design Alternatives Study

Fresno Council of Governments Community Workshop. Tuesday, April 25, 2017 Hoover High School Fresno, California

Site Improvements

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Utilizing QR Codes and SurveyMonkey to Generate High School Travel Tally Data

Hunger Challenge. Guidebook

Today. Develop Plans. Public Listening Session

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

One-Way Street Movement vs. Two-Way Street Movement

Transportation-Demand Management Community Presentation

I-105 Corridor Sustainability Study (CSS)

The Cooperative Hall of Fame

CHAPTER 7.0 IMPLEMENTATION

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

405 Express Lanes General Information & Frequently Asked Questions

We believe the following comments and suggestions can help the department meet those goals.

Driveway Design Criteria

Toll Rate Public Hearing

Dartmouth College Parking, Traffic, & Pedestrian Circulation. Master Plan 2001

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Preliminary Transportation Analysis

9. Parking Supporting Statement

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Appendix 2-B: Paint Testing Summary Table

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Application of Value Engineering The Crosstown Project

Washington St. Corridor Study

Crash Analysis of I-64 Closure in St. Louis County

Auckland Council: Electric bicycle CBD trial

A national cycling strategy for more and safer cycling

To: Marketing Planning and Legislative Committee Date: October 29, From: Anne Muzzini, Director of Planning & Marketing

saving lives SWARCO The Better Way. Every Day.

Early Understanding of Public Bikesharing in North America

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

395 Express Lanes Extension

ECONOMIC DEVELOPMENT ELEMENT

The Case for Roundabouts:

CLEAR COLLISION LEAD EVALUATE ACT RE-OPEN KEEPING TRAFFIC MOVING. CFOATechRescue ConfJuly2013v0.1

2018/ /21 SERVICE PLAN

Lucintel. Publisher Sample

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Transcription:

Thesis Proposal

Thesis Proposal Table of Contents Page Executive Summary...2 Analysis 1 Joint Ventures...3 Analysis 2 LEED Improvement (Breath Topic)...5 Analysis 3 Structural Redesign (Breath Topic)...7 Analysis 4 Site Congestion...9 Weight Matrix...10 Thesis Proposal Page 1 of 10

Executive Summary The Washington Nationals Ballpark is a fast-tracked design build baseball ballpark located in the SE of Washington, DC. The ballpark is set to be completed by opening day for Major League Baseballs Washington Nationals in April of 2008. Three major general contractors in the DC area formed A Joint Venture to become Clark / Hunt / Smoot, to oversee the ballparks erection. The ballpark is the creation of another joint venture in HOK Sport and Devrouax and Purnell, the architects who came together to create the beautiful, and unique ballpark. The project has the largest construction cost ever to date for a Major League Baseball stadium with an overall project cost of $611 million. This is the proposal for the Spring 2008 Thesis on The Washington National Ballpark at The Pennsylvania State University. This will focus on four different areas of research: Analysis 1 Joint Ventures The research is about how a joint venture was and can be used. It also looks at the advantages and disadvantage of having multiple construction companies as the general contractor working together as one project team. Analysis 2 LEED Improvement (Breath Topic) This analysis will discover what could have been done to improve on the LEED Certified rating by looking at how they could achieve a LEED Silver or Gold rating, specifically looking at the lighting design criteria. There will be a redesign of the lighting in the luxury boxes, a major contribution to the ballparks income. Analysis 3 Structural Redesign (Breath Topic) There will be a redesign of the structural systems specifically looking at using an all steel structural system and an all concrete structural system. It will look at the benefits and trade offs that will deal with the use of the different systems as well as cost impact and the project schedule impact that the 2 different structural systems will effect. Analysis 4 Site Congestion The ballparks site has major issued with congestion. There are major concerns with not only access to the site but the site logistics as well. There is very limited space to use for material lay down areas. Thesis Proposal Page 2 of 10

Analysis 1 Joint Ventures Background The ballpark is an extremely unique project that has many different companies coming together to form a joint venture to make the ballpark come to life. The project is being delivered as a fast-tracked design-build project. The design team of HOK Sport, and Devrouax and Purnell, formed a joint venture to act as the architects of the project. Three major local general contractors, Clark, Hunt, and Smoot formed a joint venture to work together as one construction company and perform the work as the construction managers on the ballpark. They assumed the design team contract with the owner creating a large design build firm. Problem Statement How can creating a joint venture between multiple companies benefit or hurt the project? Goal The goal of the research is to see how the joint venture was used and the advantages and disadvantage of having multiple construction companies as the general contractor. The audience will be future companies interested in forming a joint venture to win projects. The study will be on how the design team and the construction managers team worked together to create a successful project. It will look at issues that arose from a creating a joint venture by different companies and the advantages and disadvantages they had dealing with working together. Steps 1. Contact members of project team for the ballpark that work for Clark, Hunt, and Smoot and gather their opinions about working on the joint venture by creating a survey they can complete. Sample Survey Questions: How many joint venture project have you worked on before? Project name, and companies involved in the joint venture. What did you feel were the advantages of the joint venture? Thesis Proposal Page 3 of 10

What did you feel were the disadvantages of the joint venture? What was the project delivery system of the joint venture project? 2. Research other projects where companies have come together and formed a joint venture. 3. Contact members of those projects discovered in Step 2 and send out the sample survey. 4. Compare results from the ballpark and the other project team s answers for the survey. 5. State recommendations and issues discovered from the results. Expected Outcome By creating a successful survey that can be given to both the design team and the construction team that are involved with the ballpark as well as members of projects teams that work together in other project on a joint venture, a better understanding can be gained about the benefits and issues they had as working together as a joint venture. Thesis Proposal Page 4 of 10

Analysis 2 LEED Improvement (Breath Topic) Background The Nationals Ballpark is working toward achieving a Leadership in Energy and Environmental Design (LEED) Certification. Clark, Hunt, and Smooth are trying to make it the most sustainable professional ballpark in the country when it gains the ranking of Certified by the U.S. Green Building Counsel. There are many critical issues that can arise when trying to accomplish a LEED Certified Rating. The ballpark will contain: Enhanced sandfilters to screen organic debris (peanut shells, hot dogs) and redirect bowl wash-down sanitary system Reserved parking for fuel efficient vehicles and carpools Low emitting materials in the paint, carpet and adhesives High efficiency field lighting 21% energy savings 20% recycled content in construction materials Problem Statement How can they improve on the LEED certified rating? Goal The goal would be to discover what could have been done to improve on the LEED Certified rating by looking at how they could achieve a LEED Silver or Gold rating, specifically looking at the lighting design criteria. Steps 1. Review what points the ballpark is using to achieve a LEED Certified rating. 2. Look for areas of improvement to help achieve a LEED Silver rating Thesis Proposal Page 5 of 10

3. Specifically look at the lighting systems selected and see where they can be used to improve the LEED Rating. 4. Look into the redesign of the luxury boxes lighting systems that will decrease energy consumption and still create an optimum lighting design. 5. Recommend the lighting design for the luxury boxes 6. Recommend ways to improve the LEED rating Expected Outcome The expected outcome is that a great LEED rating can be achieved by redesigning the lighting systems. Thesis Proposal Page 6 of 10

Analysis 3 Structural Redesign (Breath Topic) Background The ballpark is a combination of steel and cast in place concrete. The structural steel is unique because it is only located in the structures above the Club Level as well as in the scoreboard in the right field. Cast in place concrete was used for the load bearing foundation walls below the Club Level. Problem Statement All Steel vs. All Concrete vs. Combination of Steel and Concrete I would like to look into using an all steel structural system and also into the use of an all concrete structural system. Goal I want to look at the benefits and trade offs that will deal with the use of the different systems. I will specifically look at the cost impact and the project schedule impact that the 2 different structural systems will effect. Steps 1. Review the existing structural system that was selected by the design team for The Washington National Ballpark. Specifically look at the analysis of the cost from Technical Report 2: Alternative Methods and Research. 2. Find a typical bay for the redesign of the structural system. 3. Redesign the typical bay with an all steel structural system. 4. Develop an overall cost that relates to the redesign for an all steel structural system. 5. Look at the cost issues related to the redesign of an all steel structural system. 6. Create a schedule breakdown for the proposed steel structural system. 7. Redesign the typical bay with an all concrete structural system. Thesis Proposal Page 7 of 10

8. Develop an overall cost that relates to the redesign for an all concrete structural system. 9. Create a schedule breakdown for the proposed concrete structural system. 10. Compare the results for the different benefits and drawbacks to selecting the different structural systems Expected Outcome The expected outcome is that I will discover a cheaper and faster way for the construction of the ballparks structural systems by the analysis of the alternative options selected. Thesis Proposal Page 8 of 10

Analysis 4 Site Congestion Background The ballparks site has major issued with site congestion. The site itself it packed along the Anacostia water front with only one main road surrounding the ballpark. In the June of 2007 the city of Washington, DC closed the main access bridge so it could be reconstructed to handle the new ballparks traffic. There are major concerns with not only access to the site but the site logistics as well. There is very limited space to use for material lay down areas. Problem Statement Due to the ballparks major congestion issues I would like to proposed multiple solutions to the issues concerning the little space available. Goal I believe that by proposing different solutions there could be some better uses to the space available on site. Steps 1. Analyze the existing site conditions for the ballpark after the playing field is no longer able to be utilized as a lay down area. 2. Research how other downtown DC construction sites make the most of their site. 3. Come up with alternative solutions to the existing site issues. Expected Outcome If the site is greater utilized there will be fewer obstructions that the individual trades will deal with on a daily basis. Thesis Proposal Page 9 of 10