WITTICH HALL RENOVATION

Similar documents
ATHLETIC FACILITY September 30, 2010

Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone

TERMITE PROTECTION Material Description Qty Units Cost M/up Labor Total. Termite Control (Slab) 188 m Subtotal

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

Villas By The Sea 4 Condominium. Oceanfront North VILLAS BY THE SEA OCEANFRONT COLLECTION

Check with local zoning official for property line distance requirements.

SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST

PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL PMH. PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course

WORKING AT HEIGHT POLICY

HAZARD ASSESSMENT FOR ORANGE COUNTY SCHOOLS

BILL OF QUANTITIES 1 PRELIMINARY WORKS / GENERAL OBLIGATIONS 2 MOBILIZATION AND SITE PREPARATION :

Starr Mier-Whiting, Realtor 448 Teryl Road #4. 2/2 condo, furnished, golf course view. Royal Shell Realty.

SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY

Swimming Pool Requirements Packet

THE EAGLE CREEK PLAN BN-1B W/BASEMENT

Facility Condition Assessment Report

Cutting Tools, Inc. SITE SURVEY G E Tutt Street, South Bend, IN 46601

TECHNICAL DATA. Trimpac 257a. September 16, 2013

TECHNICAL DATA. Trimpac 256a. October 31, 2013

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

237 Palm Drive second floor. 2/2, furnished. Special assessment , for golf course is paid in full.

RESIDENTIAL SWIMMING POOL REQUIREMENTS

Swimming Pool Requirements

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

25' - 8" 6" 20' - 4" 4' - 4" 6" 10' - 4" 10' - 0" sh.dl. sh.dl. 8'-0" 8'-0" line of 9' flat ceiling. flat ceiling

SWIMMING POOL REQUIREMENTS

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

TECHNICAL DATA. Trimpac 244a. September 16, 2013

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

QUAKERTOWN COMMUNITY SCHOOL DISTRICT

TECHNICAL DATA. TRIMPAC Model B-5 & B-5B

Section 1.3: PRESSURE VESSEL COMPONENTS AND SYSTEMS AND COMPRESSED GAS CYLINDERS

RESIDENTIAL SWIMMING POOL

Section - III SYSTEMS DESCRIPTION

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

Cross Connection Control. 2 CE Hours

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

AMITY TWP POOL REQUIREMENTS

LK-SX VOC. Application. Security Advice Caution. Notes on Disposal. Combined sensor mixed gas. Data sheet

3M InCa Individual Cross-Connection Cabinets

Unit # ± 5,514 SF Width ± 85' Depth ± 68' Plans produced by: ID Plans 10/12/2016 (813)

CUSTODIAL Safety Inspection Checklist

UNCONTROLLED IF PRINTED

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY

Swimming Pools, Hot Tubs and Spas

AMERICASE CABINETS INDUSTRY'S CHOICE FOR CASEWORK, MANUFACTURED TO AWI INDUSTRY STANDARDS DIVISION OF AMERICAN MILLWORK & CABINETRY

Office Safety. Emergency Procedures Electrical Safety Office Ergonomics

Spray Finishing Self-Inspection Checklist

Florida Building Code Review Checklist

Electrical Safety. Introduction

LED 14W POLO BULKHEAD WITH MICROWAVE SENSOR

Owner s Manual Installation and Operation

UNIT TITLE: CLEAN PUBLIC AREAS, FACILITIES AND EQUIPMENT NOMINAL HOURS: 60 hours

BIOME DESIGN TECHNICAL DATA

Vertebrate Animal Biosafety Level 1 Criteria

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

ASTM E1886 and ASTM E1996 TEST REPORT. Report No.: E Rendered to: 3M COMPANY St. Paul, Minnesota 55144

Article 7. PHYSICAL ENVIRONMENT ALTERATIONS TO EXISTING BUILDINGS OR NEW FACILITIES

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

CHILD CARE CENTER Regulations GENERAL LICENSING REQUIREMENTS (Cont.) Article 7. PHYSICAL ENVIRONMENT

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

RESIDENTIAL BUILDING PLAN REVIEW CHECKLIST

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Life Smart Spas Frequently Asked Questions

IH Report: SUFMO 08/09-CC21 1/27/2009 Stanford University Gas Cabinet Installation and Performance Criteria

UPDATE ARLINGTON COUNTY. Bicycle Parking Standards

Facility Condition Assessment Report

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

REVIEW OF ACCESSIBILITY FEATURES

Basic & Controlled Atmosphere Glove Boxes

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

Swimming Pool Installation

Swimming Pool Plans and Specification Report

Bollard Light Installation Guidelines

Swimming Pool Permits are About Health and Safety

The following were determined to be confined spaces; they may not be permit required that employees of the Division of Facilities may encounter:

BEGINNING THE MEETING

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS


MANAGEMENT PROCEDURE FOR LABORATORY VENTILATION

Type 1 - Nitrogen Generation System. Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons

LABORATORY FUME HOOD SPECIFICATION AND MAINTENANCE PROGRAM

Ground Fault Circuit Interrupter(GFCI) Policy

Safety Manual > Safety Checklist for Labs

D E L U X E S E R I E S. Your Hot Tub Pre-Delivery Guide D E L U X E

Two Rivers Activity Center (TRAC) McGough Construction 630 First Avenue North, Suite 4 Fargo, ND Phone: (701) Meeting Attendance

TO THE DRAWINGS AND THE PROJECT MANUAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL

CompacSas BA. Comfort and design for high-security access

Asbestos Regulation and Compliance

Step-by-Step Planning Guide

SWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS

DEVICES FOR FIELD DETERMINATION OF WATER VAPOR IN NATURAL GAS Betsy Murphy MNM Enterprises 801 N. Riverside Drive Fort Worth, Texas 76111

Your Hot Tub Pre-Delivery Guide

Advanced Code Requirements for Residential Construction Internet Course

POTENTIAL HEALTH & SAFETY HAZARDS

Laboratory Safety Review Checklist One Shields Ave Davis, CA Phone: (530) Fax: (530)

Transcription:

WITTICH HALL RENOVATION ROOM DATA SHEETS APPENDIX 4 DFD Project No. 14I20 FINAL DRAFT November 1, 2016

Page Intentionally Left Blank

TABLE OF CONTENTS A. DEPARTMENTAL OFFICES - 2ND FLOOR B. DEPARTMENTAL OFFICES - 3RD FLOOR C. DEAN S OFFICE D. SBDC E. MISC. INSTRUCTIONAL / SUPPORT SPACES F. TEACHING LABORATORIES G. MEP SPACES

Page Intentionally Left Blank

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION A - DEPARTMENTAL OFFICES - 2ND FLOOR A1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION A2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 A3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION A4

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 A5

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION A6

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 A7

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION A8

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 A9

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION A10

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 A11

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION A12

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 A13

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION Page Intentionally Left Blank A14

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION B - DEPARTMENTAL OFFICES - 3RD FLOOR B1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION B2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 B3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION B4

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 B5

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION B6

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 B7

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION B8

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 B9

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION B10

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 B11

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION B12

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 B13

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION Page Intentionally Left Blank B14

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION C - DEAN S OFFICE C1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C4

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C5

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C6

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C7

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C8

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 *Supply/ Install Types: Room Data Sheet Wittich Hall Remodel 11/1/2016 720 SF Room # 14I2O Project Name Date Last Assignable SF Room Number DFD Project # Dean's Office Conference First, Last Name Phone Number Department / Group Name Room Name Contact, Phone Room Function: Room Adjacencies: Dean's Conference Room Located along public corridor in close proximity to the Dean s office Number of Occupants: Special Ceiling Height: Fire Rating: Special/ Hazardous Room Conditions: 24 Occupants 9-0 None None Finishes and Materials Floor / Base: Walls: Casework: Vinyl Composition Tile / 4 Vinyl Base Gyp Board Fixed Portable Seamless Sheet Vinyl / 4 Vinyl Base Cement Board Metal Wood Carpet /Cpt Base Concrete Masonry Plam Other: other Sealed Concrete / 4 Vinyl Base Glass Countertop: Other: Wall Finishes: Plastic Laminate Ceiling: Latex Paint, no VOC Solid Surface Solid surface sills 2x2 Reveal Edge Fine Fissured tile Mylar faced tile Epoxy Paint Stainless Steel Gyp Board / Painted Exposed / Non-painted Vinyl Wall Covering Other: Other text Exposed / Painted Other: Other text Other: Acoustic wall panel, chair rail Wall Cabinets / Shelving: Doors: Open Swing Doors Hollow Metal Half Glass Acoustic Seals Frames: AL Sliding Doors Adjustable Wood Vision Panel Closer Sidelight Wood Plam Additional Build-out Information: Continuous storefront glazing with frosted sections along circulation; fully insulated walls up to deck Equipment Schedule Equipment Description *Supply/ Install Quantity Length Width Depth Height Location Utilities / Comments Recessed Proj. screen CFCI 1 Ceiling Projector OFCI 1 Ceiling 55 TV Monitor OFCI 1 Wall Window Treatment CFCI 3 Windows Perf. Roller shade 75% Open Fixed Markerboard CFCI 1 Wall Touchpanel control CFCI 1 Wall Furniture OFOI Comments: Design, prep, wire and terminate for flat panels. Flat Panels in Furniture Budget- Structural Special Floor Loading Requirements: None New Floor Construction Ceiling Mounted Equipment Environmental Significant Noise / Vibrational Generator Visual Privacy Required Natural Light Desired Significant Noise/ Vibrational Sensitivity Views Desirable Avoid Natural Light HVAC Temperature / Relative Humidity: Air Flow / Changes: Air Quality / Exhaust: Summer Temp: 72 F +/- 2 F or Other: Other Not Critical # AC per hour (occupied) Filtered Supply Summer RH: 50% +/- 10% or Other: Other Monitored # AC per hour (unoccupied) Filtered Exhaust Winter Temp: 68 F +/- 2 F or Other: Other Positive Double Positive Other: Other No Humidification Negative Double Negative Comments: Plumbing Fixtures / Features: Services: Wastes: Shower Potable Water. Hot Cold Floor Drain Sink Process Water. Hot Cold Domestic Sewer Stainless Steel Integral Solid Surface Steam.. Plant Local Single Bowl Double Bowl Glycol Chilled Water Loop Drop-in Wall Mounted Water Closet Floor mounted Wall Mounted Comments: Electrical Power Service: Power Supply Features: Illumination: Type Qty Normal Standby Filtering.... Panel Local Primary LED 120V # UPS System... Building Local Fluorescent 208V 1 Phase # GFCI Outlets. Plant Local Wall Washer 208V 3 Phase # Dedicated Circuits: Task Lighting 480V 3 Phase # Emergency Power: Industrial Fluorescent Other # Other: 55-60 FC or other: Multi-Level Control Occupancy Sensor Daylight Sensor Comments: Elect/Data in floor for conference table Communications Data Connections AV Connections WAP s Intercom System Public Address System Comments: Technology intensive, UWL to provide and install WAPS Fire Protection Potential Fire Hazards: Sprinkler System Type: Detection Methods: Flammable Materials: Material Desc. Wet Pipe Pre-Action Smoke Detector Heat Detector Explosive Materials: Material Desc. Dry Pipe Halon Equivalent Other: Simplex Class 1 notification Signatures OFOI Owner Furnished/ Owner Installed OFCI Owner Furnished / Contractor Installed CFOI Contractor Furnished / Owner Installed CFCI Contractor Furnished / Contractor Installed User Representative Date UW LaCrosse Representative Date C9

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C10

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C11

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C12

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C13

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C14

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C15

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C16

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 C17

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION C18

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION D - SBDC 1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION D2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 D3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION D4

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 D5

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION D6

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 D7

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION D8

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 D9

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION D10

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 D11

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION D12

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 D13

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION Page Intentionally Left Blank D14

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION E - MISC. INSTRUCTIONAL / SUPPORT SPACES E1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION E2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 E3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION E4

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 E5

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION E6

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 E7

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION E8

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 E9

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION E10

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 E11

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION Page Intentionally Left Blank E12

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION F - TEACHING LABORATORIES F1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION F2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 F3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION F4

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 SECTION G - MEP SPACES G1

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION G2

APPENDIX 4 - ROOM DATA SHEETS NOVEMBER 1, 2016 G3

UNIVERSITY OF WISCONSIN - LACROSSE WITTICH HALL RENOVATION G4