Greenup Lock Filling and Emptying System Study

Similar documents
Coastal and Hydraulics Laboratory

PAK BENG HYDROPOWER PROJECT

Physical Model Study of the San Antonio River Lock System

Physical Model for the Filling and Emptying System of the Third Set of Panama locks

CLAIBORNE LOCK AND DAM PERTINENT DATA

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

Effect of Fluid Density and Temperature on Discharge Coefficient of Ogee Spillways Using Physical Models

Coastal and Hydraulics Laboratory

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

Experiment 8: Minor Losses

Hours / 100 Marks Seat No.

Irrigation &Hydraulics Department lb / ft to kg/lit.

BY THOMAS M. WALSKI, BRIAN LUBENOW, AND JEFFREY SPAIDE. When they install a branch from a water distribution main,

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Zebra Mussel Research Technical Notes

Instruction Manual. Pipe Friction Training Panel

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

UNIT 15 WATER HAMMER AND SURGE TANKS

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Investigation of Suction Process of Scroll Compressors

Coastal and Hydraulics Laboratory

Experiment (13): Flow channel

Laboratory studies of water column separation

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA)

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

EFFECTS OF SIDEWALL OPENINGS ON THE WIND LOADS ON PIPE-FRAMED GREENHOUSES

Plan B Dam Breach Assessment

NUMERICAL AND PHYSICAL MODELING

Hours / 100 Marks Seat No.

RESIDENTIAL WATER DISTRIBUTION

HYDRAULIC JUMP AND WEIR FLOW

CHAPTER 5 CULVERT DESIGN

Free Surface Flow Simulation with ACUSIM in the Water Industry

SUMMARY PROBLEMS CAUSED BY BACKFLOW IN PIPE SYSTEMS.

E 328 E 498 Tank top mounting Connection up to G1½ and SAE 2 Nominal flow rate up to 600 l/min

Broadly speaking, there are four different types of structures, each with its own particular function:

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Hydraulic Design of Navigation Locks

Impact of anti-vortex blade position on discharge experimental study on the coefficient of morning glory spillway

HISTORY OF CONSTRUCTION

2. RAPIDLY-VARIED FLOW (RVF) AUTUMN 2018

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

Discharge Coefficient in Siphon Spillway with Different Cross Sections

Cover Page for Lab Report Group Portion. Head Losses in Pipes

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

SUBMERGED VENTURI FLUME. Tom Gill 1 Robert Einhellig 2 ABSTRACT

Experiment Instructions

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

The Estimation Of Compressor Performance Using A Theoretical Analysis Of The Gas Flow Through the Muffler Combined With Valve Motion

WIND-INDUCED LOADS OVER DOUBLE CANTILEVER BRIDGES UNDER CONSTRUCTION

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

Nautical Studies to Define Layout Requirements for a New Sea Lock at IJmuiden

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

6. EXPERIMENTAL METHOD. A primary result of the current research effort is the design of an experimental

Course Teacher: Prof. Dr. M. R. Kabir SPILLWAY & IRRIGATION PUMPS. Spillway:

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

Huntington District. For More Information Contact (304)

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited.

External Pressure Coefficients on Saw-tooth and Mono-sloped Roofs

Wave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater

ITTC Recommended Procedures and Guidelines

Middle East Technical University Department of Mechanical Engineering ME 305 Fluid Mechanics I Fall 2018 Section 4 (Dr.

CEE 345, Part 2, Winter 2012, Final Exam Solutions (Open Channel Flow)

E 158 E 198 E 248. Tank top mounting Connection up to G11 / 4 Nominal flow rate up to 250 l/min e d

Folsom Dam Joint Federal Project Existing Spillway Modeling

Coastal and Hydraulics Laboratory

Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

APPENDIX J HYDROLOGY AND WATER QUALITY

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Large-scale Field Test

The Physical Model Study of the Folsom Dam Auxiliary Spillway System

IMPACT OF MAKING THE CREST OF WEIR MULTIFACETED ON DISCHARGE COEFFICIENT OF MORNING GLORY SPILLWAY

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness

The Discussion of this exercise covers the following points:

H16 Losses in Piping Systems

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

International Journal of Technical Research and Applications e-issn: , Volume 4, Issue 3 (May-June, 2016), PP.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

Part 5: Mooring forces and vessel behaviour in locks Experience in Belgium. Mooring forces and vessel behaviour in locks:

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

COEFFICIENT OF DISCHARGE OF CHIMNEY WEIR UNDER FREE AND SUBMERGED FLOW CONDITIONS

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2010

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump.

2O-2 Open Channel Flow

Evaluation of step s slope on energy dissipation in stepped spillway

EFFECTS ON CUTTER SUCTION DREDGE PRODUCTION WHILE DREDGING SIMULATED DEBRIS IN THE LABORATORY

Transcription:

Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice 21-23 June 2006, Mayagüez, Puerto Rico. Greenup Lock Filling and Emptying System Study Mario J. Sanchez Research Hydraulic Engineer, Coastal and Hydraulics Laboratory, Engineering Research and Development Center, Vicksburg, MS, USA, email: Mario.J.Sanchez@erdc.usace.army.mil Abstract The United States waterway system finds itself facing increasing commercial traffic while the system s infrastructure has essentially reached its design life. Financial constraints require innovative design concepts on infrastructure improvements. The overall savings estimated from the use of these innovative construction concepts for the US Army Corps of Engineer s top 11 high-priority navigation projects are between 1.4 and 1.8 billion dollars. The Greenup Lock in the Ohio River is one of these projects. One of the innovative designs being considered for this site is extending the lock walls of the existing 204.2 m auxiliary lock and converting it into a 408.4 m long lock. Two alternatives have been proposed within this lock extension project. A cost effective design alternative being considered for the filling and emptying system is the use of the existing 204.2 m lock system to fill the 408.4 m lock. This type of system is hydraulically unbalanced and could be prone to extremely slow filling and emptying times, and higher hawser forces. Another alternative is to build a separate filling and emptying system for the extended portion of the lock. This will provide a more balanced environment within the chamber during the filling and emptying cycles. Research on these systems has determined minimum filling and emptying times, with acceptable hawser forces, minimal surface drift, and disturbance. This paper presents the modeling methods used to establish design criteria. This criterion is necessary for design engineers investigating the 204.2 m extension of the Greenup Auxiliary Lock. Keywords Navigation locks, filling and emptying systems, lock extensions, intake design 1. Introduction 1.1 Background The United States waterway system finds itself facing increasing commercial traffic while the system s infrastructure has essentially reached its design life. The result is an increased demand on the nation s navigation locks.

Several U.S. Army Engineer Districts are considering the use of innovative design alternatives to increase their lockage capacity. Currently, many of the dams have two locks in operation, a main and an auxiliary lock. The main lock is nominally 366 m long and the auxiliary 183 m long. The Greenup Locks and Dam are one such example. The traffic of longer tows is increasing on the Ohio River and its tributaries, and one of the innovative designs being considered by several projects is extending the lock walls of existing 183 m auxiliary locks and converting them into 366 long locks. This study evaluates the performance of the Greenup auxiliary lock after the extension with two proposed alternatives. One alternative is to keep the original filling and emptying (F&E) system while the other is adding a separate F&E system for the lock extension. 1.2 Prototype The Greenup Locks and Dam project is located on the Ohio River approximately 8.04 km below Greenup, KY (Figure 1). The project consists of a non-navigable, high-lift, gated dam, top length 392 m, including 75-m fixed weir with 68-m open crest, nine tainter gates, clear span 30.5 m between 4.3- m intermediate piers and 4.57- m end piers, with a damming height 10.67 m above sills, and two adjacent parallel lock chambers. The chambers are located on the left side of the Ohio River (looking downstream). The main lock chamber, located on the spillway side, has clear dimensions of 33.5 m by 366 m and the auxiliary lock chamber 33.5 m by 183 m. Figure 1. Location Map for the Greenup Locks and Dam Description of lock features and nomenclature used in this paper can be found in Engineer Manual (EM) 1110-2-1611 Layout and Design of Shallow-Draft Waterways, EM 1110-2-2602 Planning and Design of Navigation Locks, and EM 1110-2-1604 Hydraulic Design of Navigation Locks. The existing F&E system consists of a multi-ported intake, chamber laterals, and a discharge outlet connected to a single culvert. Improvements to the project to enhance navigation include a 183 m extension to the to the auxiliary lock chamber walls. The lock will be 408.43 m from pintle to pintle. Due to construction issues, while we

refer to the extended lock to as having a nominal length of 366 m, the actual length is 408 m. The design lift is 9.14 m, which occurs with a pool elevation of 156.97 and a lower pool elevation of 147.83. 1.3 Purpose and Scope The purpose of this study was to evaluate the hydraulic performance of the Greenup auxiliary lock after a 183 m extension and to modify the filling and emptying system, if necessary, to provide an acceptable design. Two alternatives were proposed for this study. One alternative is to keep the original F&E system while the other includes adding a separate F&E system for the lock extension. The specific objectives of the study were to determine: a) Performance of the additional F&E System b) Filling and emptying times for various valve speeds at the design lift of 9.14 m. c) Hawser forces exerted on barges moored in the lock chamber. d) Pressures in the filling and emptying system. e) Overall system performance. A laboratory model was used to evaluate the performance of the filling and emptying system. Model studies of lock filling and emptying systems designed for barge traffic have targeted maximum hawser forces of 44.48 kn as a design objective. System design and operation for new projects are optimized such that a full tow at design draft produce hawser forces of 44.48 kn or less during lock operations at the design pool conditions (EM 1110-2-1604). 2. Physical Model 2.1 Description A 1:25 model was built to reproduce the upper and lower approach, complete with dummy main lock, and the extended auxiliary lock with the intake, filling and emptying culvert and valves, and the discharge system (Figure 2). The upper approach, lower approach, lock chamber floor and walls, and the miter gates were constructed of plastic-coated plywood. The filling and emptying system, including the intake, filling and emptying culvert, and the discharge outlet were constructed of acrylic plastic and the filling and emptying valves were built from brass. Initially, the model included the extended lock chamber without an addition to the F&E system. This design is referred to as the Type 1 design. The lock extension using a separate F&E system to fill and empty the downstream end of the chamber is referred as the Type 2 design.

Figure 2. Model Photo Looking Downstream. The existing filling system consists of one intake located in the left guide wall (looking downstream) that contains eight ports 3.66 m high by 2.5 m wide with a intake port-to-culvert area ratio at the filling valve well of 2.7. The flow into the intake feeds a rectangular culvert that is 5.49 m high by 4.88 m wide. The culvert delivers flow to a set of laterals located in the upper part of the lock chamber floor. The laterals are centered in the original 183 m lock chamber. By extending the lock walls by 183 m nominally, the laterals remain in the upper part of the lock chamber (Type 1 design) and portrays an unbalanced filling system. The laterals also serve as the emptying system. During empty the flow exists through the laterals into a single culvert (5.49 m by 4.88 m) that carries the discharge into the lower approach. The additional filling and emptying system (Type 2) consists of an intake located behind the land side lock wall that contains four ports, which are 5.47 m high by 3.05 m with a intake port-to-culvert area ratio at the filling valve well of 4.3 (Figure 3). The flow into the intake feeds into a rectangular culvert 5.49 m high by 4.88 m wide. The supplemental culvert delivers flow to a set of laterals located in the lower part of the lock chamber floor. Figure 3. Plan view of Greenup extended lock, Type 2 design (scale 1:25). Eighteen aluminum barges, each simulating a length of 59.44 m and width of 10.67 m, tied together in a 3 by 6 tow arrangement, were loaded with weights to reproduce the desired 2.74-m draft.

2.2 Appurtenances and Instrumentation Water was supplied to the model through a circulating system. The upper and lower pools were maintained at near constant elevations during the filling and emptying operations using constant-head skimming weirs in the model head bay and tail bay. During a typical filling operation, excess flow was allowed to drain over the weirs at the beginning of the fill operation and minimal flow over the weir was maintained at the peak discharge thereby minimizing the drawdown in the upper reservoir. The opposite of this operation was performed during lock emptying. Upper and lower pool elevations were set to the desired level by adjusting the skimming weirs and reading piezometers placed in calm areas of the upper and lower pools. Water-surface elevations inside the chamber were determined from electronic pressure cells located in the middle and on each end of the lock chamber. Histories of the end-to-end watersurface differential were also recorded during filling and emptying operations. An automated data acquisition and control program was used to control valve operations and collect pressure and strain gauge data. The data were usually collected at a sampling rate of 50 Hz. Some of the hawser force and lock filling and emptying data were collected at 10 Hz. The processed data were used to reveal lock filling and emptying times, longitudinal and transverse hawser forces, and pressures downstream from the filling and emptying valves. A hawser-pull (force links) device was used to measure the longitudinal and transverse forces acting on the tow in the lock chamber during filling and emptying operations. Three such devices were used: one measured longitudinal forces and the other two measured transverse forces on the downstream and upstream ends of the tow, respectively. When the device was mounted on the tow, one end of the link was pin-connected to the tow while the other end was engaged to a fixed vertical rod. While connected to the tow, the link was free to move up and down with changes in the water-surface in the lock. 2.3 Similitude for lock models Complete similitude in a laboratory model is attained when geometric, kinematic, and dynamic similitudes are satisfied. Physical models of hydraulic structures with both internal flow (pressure flow) and external flow (free surface) typically are scaled using kinematic (Froudian) similitude at a large enough scale so that the viscous effects in the scaled model can be neglected. More than 50 model and 10 prototype studies of lock filling and emptying systems have been investigated (Pickett and Neilson 1988). The majority of these physical model studies used a scale of 1 to 25 (model to prototype). Lock model velocities scaled using kinematic similitude (model Froude number equal to prototype Froude number) in a 1:25-scale model have maximum Reynolds numbers at peak discharges on the order of 10 5 yet the corresponding prototype values are on the order of 10 7. Boundary friction losses in lock culverts are empirically described using the smooth- pipe curve of the Darcy-Weisbach friction factor where the headloss is expressed as H f = f L D 2 V 2g where H f is the headloss due to boundary friction, f is the Darcy-Weisbach friction factor, L is the culvert length, and D is the culvert diameter. The Darcy-Weisbach friction factor for turbulent flow in smooth pipes is given in an implicit form (Vennard and Street 1982) 1 f = 2.0 log ( N R f )- 0.8

Because f decreases with increasing N R, the model is hydraulically too rough. The scaled friction losses in the model will be larger than those experienced by the prototype structure. Consequently, the scaled velocities (and discharges) in the model will be less and the scaled pressures within the culverts will be higher than those of the prototype. Low pressures were not a major concern with the Lock Research model s design; however, the lower discharges would in turn result in longer filling and emptying times in the model than the prototype will experience. Prototype filling and emptying times for similar designs will be less than those measured in a 1:25-scale lock model. This study used a 1:25-scale Froudian model in which the viscous differences were small and could be estimated based on previously reported model-to-prototype comparisons. Setting the model and prototype Froude numbers equal results in the following relations between the dimensions and hydraulic quantities: Characteristic Dimension 1 Scale Relation Model : Prototype Length L r = L 1:25 Pressure P r = L r 1:25 Area 2 A r = L r 1:625 Velocity 1/2 V r = L r 1:5 Discharge 5/2 Q r = L r 1:3, 125 Time T r = L 1/2 r 1:5 Force 3 F r = L r 1:15,625 1 Dimensions are in terms of length. These relations were used to transfer model data to prototype equivalents and vice versa. 2.4 Experimental Procedures Evaluation of the various elements of the lock system was based on data obtained during typical filling and emptying operations. Performance was based primarily on hawser forces on tows in lockage, roughness of the water surface, pressures, and time required for filling and emptying. 3. Model Experiments and Results 3.1 Filling Operations Initial model experiments were performed to evaluate the performance of the extended lock using only the existing filling system with a lift of 9.14 m and a lateral port submergence of 4.57 m. The lateral port submergence is defined as the distance from the lower pool to the top of the lateral port. Figure 4 shows typical time histories of water-surface and hawser forces during filling with a 9.14-m lift and 9-min filling valve. The maximum downstream longitudinal hawser was -105 kn and occurred between 4 and 5 min into the filling operation. The negative sign indicates the longitudinal hawser force is in the downstream direction. This exceeds the 44.48 kn target for acceptable chamber operations. The time history of the longitudinal hawser force illustrates the conditions that exist with a F&E system that only fills in the upper half of the lock chamber.

Figure 4. Time History of Water-Surface and Hawser Forces During Filling Operation. The longitudinal hawser forces remain in the downstream direction until 10 min into the filling cycle. The maximum upstream transverse hawser forces measured during filling with a 9.14 m lift and 9-min valve were 11.6 kn to the left side (looking downstream) of the chamber and 20.5 kn to the right side of the chamber. The negative sign represents a transverse hawser force that moves the barges to the left side of the chamber. A positive transverse hawser would move the barges to the right side of the chamber. The maximum downstream hawser forces measured during filling with a 9.14 m lift and 9-min valve were 21.4 kn to the left side of the chamber and 20.5 kn to the right side of the chamber. The transverse hawser forces did not exceed the 44.48 kn limit with the 9.14 m lift and 9-min filling valve. To determine the filling time required to maintain 44.48 kn hawser forces or less with a 9.14 m lift, experiments were conducted with filling valve operations of 9, 15, and 20 min. The results from these experiments and the results for the type 2 design are shown in Figure 5. The longitudinal forces are significantly lower with the Type 2 design. Figure 5. Longitudinal Forces During the Filling Cycle.

3.2 Emptying operations Similar experiments were conducted to evaluate the performance of the lock chamber during emptying, using 1.0-, 3.0- and 5.0-min valve schedules. Figure 6 shows the longitudinal hawser forces obtained from these tests for both design types. The hawser force magnitudes were considerably lower than those measured during the filling cycle and again the type 2 design produced lower forces on the moored tow as compared to the Type 1 design. Figure 6. Longitudinal forces during the emptying cycle. 4. Summary and Conclusions Tables 1 and 2 show filling and emptying times and valve operations required to maintain hawser forces of 44.48 kn or less for the different design types. The supplemental system reduced the filling time by 13 minutes and the emptying time by 9.5 minutes, improving chamber performance by a factor of 2 in both cases. Results show that using the existing lateral system for the 183-m lock to fill the 366-m extended lock will be inherently slow since the filling is being conducted from one end of the chamber. The system is unbalanced and unable to provide even flow distribution within the chamber. As shown on Table 1, a filling time of 24.1 min was required for safe operating conditions with the 9.14-m lift. Results show that by adding a separate F&E system on the downstream end of the lock chamber considerably reduces the filling and emptying times. Table 1. Acceptable operation times with 9.14-m lift Design Type Filling Operation Valve Time Filling Time (min.) (min.) 1 17.5 24.1 2 7 11.0

Table 2. Acceptable operation times with 9.14-m lift Design Type Emptying Operation Valve Time (min.) Emptying Time (min.) 1 4 19.9 2 2 10.5 5. Acknowledgement The laboratory experiments presented in this paper were based on studies conducted by the U.S. Army Engineer Research and Development Center. Funding for the research effort was provided through the Civil Works Program of the U.S. Army Corps of Engineers. Permission has been granted by the Corps of Engineers to publish this paper. References Pickett, E. B., and Neilson, F. M. (1988). Lock hydraulic system model and prototype study data, Miscellaneous Paper Hl-88-1, U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS U.S. Army Corps of Engineers (1995). EM 1110-2-2602, Planning and design of navigation locks. U.S. Army Corps of Engineers (1995). EM 1110-2-1604, Hydraulic design of navigation locks. U.S. Army Corps of Engineers (1995). EM 1110-2-1611, Layout and Design of Shallow-Draft Waterways, Vennard, J. K. and Street, R. L. (1982). Elementary Fluid Mechanics, 6 th edition, John Wiley and Sons, New York.