Polatrak ROV II - Tip Contact Probe Operation Manual

Similar documents
CP-Gun Diver-held probe Operation manual

MODEL ANALOG ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.2 TO 100FT OPERATING RANGE ANALOG OUTPUT

MODEL DIGITAL ALTIMETER USER'S MANUAL 330KHZ, 1000M DEPTH RATED 0.5 TO 100FT (0.15 TO 30M) OPERATING RANGE SERIAL OUTPUT

GASGUARD VENT LINE3 Ammonia Sensor OPERATING & INSTALLATION MANUAL

INSTRUCTION MANUAL. 840 Transmitter. Loop Powered Dissolved Oxygen Transmitter

Saab Seaeye Cougar XT Compact

Underwater Wet Welding Products Operating Instructions

Warner Instruments, Inc Dixwell Avenue, Hamden, CT (800) / (203) (203) fax

Handling instructions for GISMA connectors HI

User Manual for Amron International Diving Supply, Inc.

Bante820 Portable Dissolved Oxygen Meter Instruction Manual

Teledyne Oil & Gas North Williamson Blvd. Daytona Beach, FL USA (phone) (fax)

GG-VL2-NH3 AMMONIA VENT LINE SENSOR. Installation and Operation Manual

Bante810 Benchtop Dissolved Oxygen Meter Instruction Manual

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

PURA. Pure Gas Dewpoint Transmitter. Users Guide

HI 2314 HI 2315 HI 23151

FTS SUBMERSIBLE PRESSURE TRANSMITTER USER S MANUAL

Quality Assurance Procedure CP - 3

INSTRUCTION MANUAL. January 23, 2003, Revision 0

INSTALLATION PROCEDURE 1/4 & 1/8 MILE PERMANENT TRACK

CCSSL35 Carry out the wiring and testing of electrical circuits and equipment

DOscan10 Pocket Dissolved Oxygen Tester Instruction Manual

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Kube Engineering Quinn E. Eddins, B.S.E.E Phone

OC Panel High Limit Aquastat Kit, Manual Reset p/n

DEEPSEA. LED Micro SeaCam POWER & LIGHT. Operator s Manual. Original Instruction Ruffin Road San Diego, CA USA

APPLICATIONS ROV & AUV SEISMIC PRODUCTION SYSTEMS DOWNHOLE JUMPER & CABLE SYSTEMS DRILLING CONTROL

32374 R. Jazowski 4/4/ D. W. Mudge G. Sivik 1 of 8 ODN TITLE: Installation & Operation Manual for Nautilus G2 Connectors

BI-680 Online Dissolved Oxygen Controller Instruction Manual

Newsletter of Jointing, Welding & Cold-Formed Steel Group, HKISC UNDERWATER WELDING. Ir Dr Chan Wai Tai. Chairman of Welding Group, HKISC

Instruction Manual HI Portable Waterproof Dissolved Oxygen Meter.

User Manual V14.1 IP68 LED FLEX NEON

MODEL GT820 OXYGEN SENSOR

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Covered Task 409OP Training Guide Inspecting Interference Bonds

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

SG36KTL-M Quick Installation Guide. 1 Unpacking and Inspection

GILMONT ACCUCAL FLOWMETERS

Shimano Di2 Installation on S5

Cathodic Protection and Underwater Survey for an Floating Storage Offloading (FSO) System

OxyCheq Expedition-X Oxygen Analyzer. Operator s Manual

Welding With Arc Welding Equipment

STERILIZABLE DISSOLVED OXYGEN SENSORS

! Warning, refer to accompanying documents.

5 Channel Calibrator

STEAM STERILIZABLE POLAROGRAPHIC OXYGEN ELECTRODE

Stand-Alone Bubble Detection System

Technical Data Sheet MF010-O-LC

SG33KTL-M Quick Installation Guide. 1 Unpacking and Inspection

Simple, Robust, Reliable Measures ph Doses either acid (lower) or alkali (raise) Displays ph, Total Dose Count (DCT) and Dose Count per hour (DC/h)

Cygnus Underwater. UT Meters & Spare Parts Sales. Searchwise Aberdeen Ltd Unit 6, Broomiesburn, Ellon Ind Estate, Ellon, Aberdeenshire, UK, AB41 9RD

Model PDT Dewpoint Transmitter

Underwater Housing for Canon EOS M

Cleaning rod: spring steel, stainless steel or carbon fibre cleaning rod - only use a one-piece rod. Avoid using snakes.

DIY - PC - Interface for Suunto Cobra/Vyper/Mosquito

PRODUCT SPECIFICATION

Handling instructions for GISMA connectors HI

PRODUCT SHEET. Order probe only as RXPROBE02

Mini-Pro CO2 Sensor User s Manual - ANALOG MODEL -

P9000 DESCRIPTION. For parts requiring RoHS compliance, please contact factory. P February /6

Corrosion problems in seawater pump caissons. Practical solutions.

Instruction Manual Updated 7/26/2011 Ver. 2.2

DTG - LCD Digital Temperature Gauge USER MANUAL

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

LogIT Dissolved Oxygen Probe

AMS 2710 PCB pressure sensor module with V output

INSTRUCTION MANUAL. Gas Salamander

Installation, Compensation and Maintenance Instructions for. RITCHIE Compasses. Made In U.S.A

Sunbrite LTC Large Underwater Pool Lights

Preferred Instruments Danbury, CT USA

Model 106 DPI "Micro-switch" Installation and Operating Instructions

SEMME2135 Assisting in modifying and adding electrical circuits in yachts and boats

Inoxair. Repair Manual. Content. Edition: 12/2010. Subject to technical changes for reasons of the continous development.

Design Features. General Description

EC214 EC215 - EC215R Bench Conductivity Meters

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Membrane covered optical CO 2 sensor

Instruction Manual HI Portable Dissolved Oxygen Meter. DO meter HI 8043 STB C OFF O 2 ZERO SLOPE C. ins rum n s

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Vacuum grease can be applied to Warner chambers by use of a small artist s dotting brush or a syringe. Both approaches are described below.

Sacrificial anodes for protection of seawater pump caissons against galvanic corrosion. Jan Heselmans Corrodium bv Planetenweg 5 NL-2132 HN Hoofddorp

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Installation, Operation, and Maintenance Manual

T EK-SUB 4800C 19 mm Submersible Level Transmitter

EASIDEW TRANSMITTER with Current Source Output

CRYOGENIC TANK SERVICES - CHART RECORDER MANUAL

jáåêçtbqj`lkpmifqseries

Model DPC3500 Continuous Low Range Dew Point Analyzer. Operations Manual

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Multi-Probe Sampling System User Guide & Manual

DigiTRON Electrical Flying Leads, Jumpers and Harness Assemblies Site Received Test Manual

HST-3000 VDSL QUICK CARD

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

P499 Heavy Duty Pressure Transducer

Gas Network Craftsperson

Unisense In Situ UniAmp Connector System

CCS240 and CCS241. Technical Information. Sensors for chlorine dioxide Amperometric, membrane-covered sensors for installation in the CCA250 assembly

B. Assemble the Method-25 sample train with a heated probe/filter.

Transcription:

This PDF document contains Live Web Links Click them for more information from the web Polatrak ROV II - Tip Contact Probe Operation Manual A Cathodic Protection Probe with dual Ag/AgCl reference cells for unparalleled accuracy. It can be diver held or mounted to an ROV friendly T-Handle (shown here). pg 1 of 15

Table of Contents 1 Dive-Spread Installation 3 2 ROV Instalaltion 3 3 Cautionary Notes 4 4 Calibration 5 4.1 General 5 4.2 Topside Calibrations (Bucket Cal.) 5 4.3 Subsea Calibrations 5 5 Operation 6 5.1 Wet Check 6 5.2 Offshore Probe Maintenance 7 5.3 Recording CP Potentials 7 6 Drawings and Calibration Forms 9 6.1 ROV II Probe General Assembly 10 6.2 ROV II Probe Detailed Assembly 11 6.3 CP Survey Wiring w/ POLASCAN 12 panel (optional) 6.4 CP Surevy Wiring w/ Voltmeter 13 6.5 Calibration Form (cell to cell) 14 6.6 Calibration Form (vs Zn coupon) 15 6.7 Calibration Form (vs. Master Ag/AgCl) 16 pg 2 of 15

Section 1 Installation for a Dive-Spread When used in conjunction with diving operations, it is recommended that a cable is assembled with a SEACON RMG-3MP connector at the subsea end. The most suitable cable in our experience is the 4 conductor armored spiral comms cable that is used by most divers for diver communications. This has two twisted pairs and is very rugged. A connection whip with this connector os provided with the probe and should be soft spliced onto the end of the comms cable. Ensure that the connection is taped back to the armored wire to provide strain relief on the connection. (If required, Deepwater Corrosion can provide a complete assembly on a 500 foot long umbilical cable.) The appropriate length of wire should be married into the dive hose leaving 4-6 feet of slack at the diver end and at least 50 feet at the topside end. Always install the dummy plug on the connector when the probe is not attached. The topside end of the wire will be run to the dive control area along with the platform ground cable and any ground from pipeline risers. The connections can be made either to a pair of digital multi-meters or to Polatrak Monitoring Panel available from Deepwater Corrosion Services. (Wiring hook-ups are shown in section 6 for the POLASCAN panel.) Section 2 ROV Installation The probe is best installed in or on a manipulator but may be attached directly to the ROV frame if there is no manipulator available (this is best when only proximity readings are required). The recessed grooves in the probe body may be used to accommodate stainless steel hose clamps for attachment, it is recommended that a safely line is provided as well as some neoprene rubber pads between the probe and the mounting surfaces, this will provide a better attachment and some degree of compliance. The connector on the back of the probe is a SEACON RMG-3FS and is wired as shown in Fig. 1 below. PIN 1 CONTACT TIP PIN 2 ELECTRODE #1 (R1) Fig. 1 PIN 3 ELECTRODE #2 (R2) pg 3 of 15

A male connector on a 6 0 whip is provided to facilitate splicing into the ROV junction box. It is recommended that the two electrode wires are routed in a shielded twisted pair in the ROV umbilical, the tip wire can be connected to a coaxial cable or any other cable that is straight through to the control van with no breaks. Topside the system can be wired directly into a video annotator (insure that it has an input impedance of at least 10 Meg Ohm / Volt), or onto either a pair of multi-meters or a Deepwater monitoring panel. See attached wiring schematics for hookup options. Section 3 Cautionary Notes Polatrak sintered silver chloride reference electrode elements are designed to withstand normal oilfield operations, but they are consumables that have a given operational life, the life of these electrodes can be extended to several seasons if the following care is taken. Never allow the electrode elements to be directly shorted to ground or any other metallic object when immersed in seawater. Never run the electrode subsea with the underwater connector un-mated. Never read the CP probe with an analog voltmeter, ensure that high input impedance digital equipment is used. Never handle the bare reference electrode element (small gray pellet) with bare or greasy hands. Do not use any type of solvent or detergent on the probe, rinse only in fresh water when not in use. Never immerse the electrode in anything but fresh water or sea-water. Never allow an underwater connector to be immersed unless it is mated or has a sealing dummy plug inserted. Never read the electrode on a multi-meter scale other than DC Volts. When not in use, store the probe in the container provided filled with seawater or tap water. Probe can be stored dry between jobs but should be rinsed in freshwater thoroughly before storage. Do not attempt to field repair any wires on the probe or inside the probe and never attempt to modify the probe tip in any way. pg 4 of 15

Section 4 Calibration 4.1 General It is imperative to follow calibration procedures precisely and to change electrodes if a probe shows to be out of calibration. Improperly reported CP readings could cause serious problems to the facility operator and may have to be repeated. The most common cause of problems, particularly on diver surveys, is damage to the cable insulation, this causes an offset in the reading which would usually be interpreted as inadequate protection levels, for this reason both topside and subsea calibrations should be performed before, during, and after every dive. Note: Oil company calibration specifications must be met, but we strongly advise also using the attached procedures. 4.2 Topside Calibrations (Bucket Calibration) If probes have been stored for a significant period, and have been allowed to dry out, it may take 1-2 hours of immersion time before the electrodes stabilize. The attached sheet shows the procedure; ensure that either native seawater or artificial seawater (3% by weight salt) is used. Procedures (forms are included for Cell to Cell, Master Silver/Silver Chloride, and zinc coupon checks). The zinc calibration coupon is provided as standard, but the master silver/silver chloride procedure is recommended). NEVER USE A METALLIC CONTAINER WHEN PERFORMING CALIBRATIONS OR FOR STORAGE. 4.3 Subsea Calibrations The subsea calibration procedures should be followed and the results logged at least once per dive. 4.3.1 Cell To Cell Calibrations This procedure checks one cell in the probe against the other, and should be performed with all the cable immersed as it will quickly detect any cable damage. If dual readouts are used as shown in the wiring diagrams, the cell to cell reading is displayed continuously, this is the recommended procedure. The cells should read within +/- 5 mv DC. If the value drifts outside this range then one of the following has happened: pg 5 of 15

1. Lead wire is damaged exposing copper to seawater. 2. A connector is not properly made or is leaking. 3. One cell has failed. If in the middle of a dive it is possible to complete the dive, however the defective cell should be isolated and the good cell used to finish the dive. The bad cell will normally be the one, which displays the most positive potential. So read a potential on the structure with both elements, the most negative cell should be used to complete the dive, and the offset noted. When recovering the umbilical cable from such a dive, monitor the cell-to-cell value, if the problem is lead wire damage, the value will revert to within +/- 5mV as soon as the damaged area clears the water, in this way the damage can be quickly located and repaired. 4.3.2 Ground Check This procedure verifies that the platform ground wire and the probe tip will yield the same reading at any point on the main structure. This is particularly important when the probe is being used in proximity mode. The POLASCAN READOUT has a facility to switch between tip and platform ground. To verify the ground, stab the steel structure under survey with the probe and record the value switching grounds from tip to platform, the reading should be identical, if it varies by more than +/ 3 mvdc, check the platform ground connection. Section 5 Operation Most oil companies will have their own survey procedures that should be followed. The following guidelines are given as guidance only. Connect the system as shown on the attached wiring schematics. 5.1 Wet Check When interfaced to an ROV, it important to perform a wet check before every dive. Signal errors caused by umbilical power cable interference could introduce reading errors. With the probe wire to the ROV, immerse the system to at least (-) 30 feet, and with the vehicle still in it s TMS bring up one electrical system at a time and note the potential of the tip (it will vary some depending on immersion time). If there is a problem, the potential will change rapidly or will spike when the circuit is powered. Repeat for all electrical and hydraulic systems. If a problem is detected it should be fixed, usually it s a poor ground connection or a faulty leaking underwater connector that cause the problem. If the system at fault can be switched off without hindering operation, this is an acceptable option. pg 6 of 15

5.2 Offshore Probe Maintenance Changing Electrodes - Spare plug-in electrode elements can be provided with the ROV II probe, these elements will also work in the CP Gun. If the elements or one element needs to be changed, follow this procedure: 1. Take the probe into a clean inside working area, with a clean grease free work surface. 2. Locate the assembly drawing at the back of this manual. 3. Remove the head assembly carefully by removing two screws on back of probe, pull out gently until two electrode connectors are visible. 4. Using an ohm meter measure between the connector pin and the electrode element to verify which is which. (Do not handle electrode elements). 5. Unplug the bad electrode(s) from connector(s), and discard. 6. Apply a small smear of silicone grease into the open female connector and insert the new electrode. (Avoid using excess grease, and any grease contact with electrode element.) 7. Check the integrity of the tip wire connector, re-make as necessary. 8. Carefully re-insert the electrodes into the probe body and replace the head assembly. 5.3 Recording CP Potentials If wired correctly the CP potentials should have a negative polarity. Accurate readings will be steady and not drifting so long as the probe is not moving. If readings are erratic this is a sign of a connection problem, and the cause should be isolated and fixed. To obtain accurate readings the probe apertures should be within 2 of the structure surface. The further away the probe is held from the structure area under investigation, the less accurate will be the reading. On offshore structures protected with zinc or aluminum anodes the following potential ranges should be observed. (-) 0.750 - (-) 1.100 Volts On Jacket Members / Pipelines (-) 0.970 - (-) 1.150 Volts On Anodes Readings outside of these ranges should be double-checked. It is possible to see potentials less negative than (-) 0.750 Volts, but this would mean an unprotected structure with large numbers of consumed anodes or a high ratio of low potential anodes. pg 7 of 15

Section 6 Drawings and Calibration Forms The following drawings and forms are attached for reference: 1. Polatrak ROV II Dive Probe GA Page 09 2. Polatrak ROV II Dive Probe Assembly Page 10 3. CP Survey Wiring with Optional POLASCAN Monitoring Panel Page 11 4. CP Survey Wiring Schematic with Twin Voltmeter Setup Page 12 5. Calibration Form Cell to Cell Page 13 6. Calibration Form vs. Zinc Coupon Page 14 \ 7. Calibration Form vs. Master Ag/AgCl Electrode Page 15 pg 8 of 15

pg 9 of 15

pg 10 of 15

pg 11 of 15

pg 12 of 15

pg 13 of 15

pg 14 of 15

pg 15 of 15